Laserfiche WebLink
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />12. NAME 13. ROLE IN THIS CONTRACT <br />Miguel Villegas, PE Structural Engineer - Project Manager <br />14. YEARS EXPERIENCE 15. FIRM NAME AND LOCATION (City and State) <br />A. Total: 23 B. With Firm: 2 Master Consulting Engineers, Inc. | Ft. Lauderdale, Florida <br />16. EDUCATION (Degree and Specialization)17. CURRENT PROFESSIONAL REGISTRATION <br />Master of Science in Civil & Structural Engineering, <br />University of Miami <br />Florida Professional Engineer | 68768 <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />Miguel specializes in bridge analysis and design, bridge widening, rehabilitation and replacements. He has extensive experience in the <br />design of miscellaneous structures including pedestrian bridges, boardwalks, culverts, floating and fixed docks, vinyl and steel sheeting, <br />anchored and cantilevered walls, seawalls, and other variety of structures designed with concrete, masonry, steel, aluminum and timber. <br />Additional design expertise includes traffic control structures such as mast arms, strain poles systems, standard and non-standard <br />variable message sign structures and high mast structures among others. <br />19. RELEVANT PROJECTS <br />(1) TITLE AND LOCATION (City and State)X With Current Firm (2) YEAR <br />COMPLETED <br />A. <br />Atlantic Dunes Park Seawall & Parking Restoration | Delray Beach, FL <br />Role: Project Manager | Type: Retaining Walls-Sheet Piles/Renovation | Construction Cost: +/-$23,551,045 <br />| Description: The Seawall was constructed under Phase 1, MCE produced two separate plan sets: one for <br />the seawall and one for the parking lot. The parking lot will be constructed at a later time under Phase 2. <br />Professional Services <br />2019 <br />Construction <br />2019 <br />(1) TITLE AND LOCATION (City and State)X With Current Firm (2) YEAR <br />COMPLETED <br />B. <br />Island Drive Bridge Rehabilitation Assessment | Delray Beach, FL <br />Role: Project Manager | Type: Forensic Engineering | Construction Cost: +/-$4,048,835 | Description: An <br />existing two lane, 12-foot concrete bridge approximately 70 feet long by 32 feet wide spanning over a waterway <br />in a residential neighborhood. The bridge was degrading and in need of repairs. The scope of services was <br />divided into three (3) phases. Phase I included detalied inspection, Phase II and III were for anticipated projects. <br />Professional Services <br />2019 <br />Construction <br />2019 <br />(1) TITLE AND LOCATION (City and State)X With Current Firm (2) YEAR <br />COMPLETED <br />C. <br />Banyan Seawall Repairs | Delray Beach, FL <br />Role: Project Manager | Type: Study/Inspection | Construction Cost: +/-$487,200 | Description: The seawall was <br />previously inspected by MCE since wall had signs of distress. Report was issued with recommendations. Owner <br />poorly implemented the repairs. The City requests MCE to review enginnered design of the repairs, interface <br />with the owner and their engineer/contractor and perform inspections to completion of the repairs. <br />Professional Services <br />2019 <br />Construction <br />2019 <br />(1) TITLE AND LOCATION (City and State)X With Current Firm (2) YEAR <br />COMPLETED <br />D. <br />St Petersburg Pier Dock | St. Petersburg, FL <br />Role: Project Manager | Type: Renovation | Size: 2,000 SF | Construction Cost: +/-$2,669,450 <br />| Description: Consisted of renovation of the dock area that the Dolphin Queen uses located on the south west <br />corner of the Pier. MCE provided design development, construction documents, bidding and construction, <br />administration services including shop drawing review and four visits to the site. <br />Professional Services <br />2019 <br />Construction <br />2019 <br />(1) TITLE AND LOCATION (City and State)X With Current Firm (2) YEAR <br />COMPLETED <br />E. <br />100 N. Biscayne Threshold Inspection | Miami, FL <br />Role: Principal in Charge | Type: New Construction | Construction Cost: +/-$365,400 | Description: Performed <br />a threshold inspection of a new batteries supports to be installed in an existing building. Specifically visual <br />inspection of welds, framing bolts, steel beams and braces, and the final inspectionof the assembly with <br />equipment installed. <br />Professional Services <br />2020 <br />Construction <br />2020