Laserfiche WebLink
27 <br />Form SF330 Part I <br />F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'SQUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) <br />20. EXAMPLE PROJECT KEY <br />NUMBER <br />21. TITLE AND LOCATION (City and State)22. YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />23.PROJECT OWNER'S INFORMATION <br />a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br />a. <br />(1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE <br />b. <br />(1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE <br />c. <br />(1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE <br />BEA Architects, Inc.Miami, FL Architect <br />TThhee NNoorrtthh SShhoorree TTeennnniiss CCeenntteerr IImmpprroovveemmeennttss,, MMiiaammii BBeeaacchh,, FFLL <br />4 <br />2018-2019 <br />City of Miami Beach Ms. Pilar Caurin Tortajada <br />2017-2019 <br />(305) 673-7071 ext. 6954 <br />The City of Miami Beach Tennis Center at North Shore Park is a community sport and recreational facility located in the North Beach neighborhood of Miami Beach, FL. The Tennis Center includes 12 tennis courts and an office/Pro-Shop. BEA Architects was contracted by the City of Miami Beach to design a fully enclosed, air conditioned modern facility that would serve as the new office and Pro Shop. The original office and Pro-Shop was located within an open air building that featured a breezeway like structure. The project involved the demolition of select areas and enhancements to the existing open air breezeway tennis area. The upgraded office / Pro Shop building has new interior finishes, new lighting, impact resistant windows to protect the facility during the hurricane season in Florida. <br />BEA also integrated a new reception area, offices, conference room, flexible casual seating for parents and visitors, enhanced security and a contemporary retail environment. The project was completed within the City’s budget and time scheduled, and without disruption to the Tennis Center’s ongoing operations.