My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BEA Architects, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
BEA Architects, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2020 10:51:29 AM
Creation date
8/21/2020 12:08:59 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
160
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
31 <br />Form SF330 Part I <br />F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'SQUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) <br />20. EXAMPLE PROJECT KEY <br />NUMBER <br />21. TITLE AND LOCATION (City and State)22. YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />23.PROJECT OWNER'S INFORMATION <br />a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br />a. <br />(1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE <br />b. <br />(1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE <br />c. <br />(1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE <br />BEA Architects, Inc.Miami, FL Architect <br />PPoorrtt EEvveerrggllaaddeess SSoouutthhppoorrtt PPhhaassee IIXX--BB && IIXX--AA,, PPoorrtt EEvveerrggllaaddeess,, FFLL Ongoing <br />8 <br />Port Everglades, Broward County Mr. L. Michael Saltzman (954) 468-0155 <br />BEA Architects provided Planning, Architecture, Civil and Environmental Engineering, Electrical Engineering and Surveying Services for the design of a new cargo container yard at Port Everglades Southport. The new container yard planned and designed by BEA is part of an integrated expansion of the Port Everglades Southport Master Plan. The project was divided into two components, Component I (Phase IX-B) and Component II (Phase IX-A). <br />During the Phase IX-B, BEA provided complete Design-Build services for the Tenant Improvements Project for King Ocean. The project serves as a storage/processing yard for shipping containers, including perimeter fencing, entry gates, truck scales, paved yard, site drainage, potable water and sewer infrastructure, a sewer lift station and high mast exterior lighting. <br />BEA is currently working on Phase IX-A, which consists of the redevelopment of the existing Foreign Trade Zone (FTZ) into a cargo container yard. BEA is providing complete Architectural and Engineering Services.
The URL can be used to link to this page
Your browser does not support the video tag.