Laserfiche WebLink
<br />STANDARD FORM 330 (REV. 8/2016) PAGE 4 <br /> <br /> <br /> (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Project Manager. Topographic and bathymetric surveying rectified aerial photography and mapping for proposed out- <br />island cruise destination. Environmental resource surveys and preparation of Environmental Impact Assessment (EIA) for <br />proposed land and marine works. Detailed coastal engineering analysis, including numeric al modeling of hurricane <br />impacts. Engineering design of beach improvements and shoreline stabilization of reshaped island perimeter. Processing <br />of EIA through government regulatory agencies. <br />e. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Hillsboro Club Emergency Dune Repair, <br />Hillsboro Beach, FL <br />PROFESSIONAL <br />SERVICES CONSTRUCTION (If applicable) <br />2017 NA <br /> (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Project Manager. Emergency dune restoration and repair services, as well as sand studies. Performed pre-construction <br />sediment testing, design plans, permit application packages, and coordinated with the Town of Hillsb oro Beach. Design <br />plans were prepared based on maximizing the volume of sand seaward of the project property. Sand samples were <br />obtained, and sand testing and analysis was performed to find available dune sand sources for replacement. A <br />neighboring dredging project was taking place, and Cummins Cederberg was able to perform sand testing prior to the <br />beginning of the dredging project, including collection of sand samples from the existing dune/berm area, to determine if <br />the sand source could be used for the dune repair, making the project more economically feasible for the client. <br />