Laserfiche WebLink
<br />STANDARD FORM 330 (REV. 8/2016) PAGE 4 <br /> <br /> <br />Coastal Engineer. Design of marine structural replacement components for the southwest pier of the Biscayne Bay Pilots <br />docking facility and development of construction drawings. <br />e. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> MSC Cruises Ocean Cay, <br />Bimini Islands, The Bahamas <br />PROFESSIONAL <br />SERVICES CONSTRUCTION (If applicable) <br />Ongoing Ongoing <br /> (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Coastal Engineer. Topographic and bathymetric surveying rectified aerial photography and mapping for proposed out - <br />island cruise destination. Detailed coastal engineering analysis, including numerical modeling of hurricane impacts. <br />Engineering design of beach improvements and shoreline stabilization of reshaped island perimeter. <br />