My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Cummins Cederberg Coastal & Marine Engineering
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
Cummins Cederberg Coastal & Marine Engineering
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2020 10:08:42 AM
Creation date
8/24/2020 10:08:01 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />STANDARD FORM 330 (REV. 8/2016) PAGE 3 <br /> <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person) <br />12. NAME 13. ROLE IN THIS <br />CONTRACT 14. YEARS EXPERIENCE <br />Leonard Barrera, EI Coastal Engineer a. TOTAL <br />6 <br /> b. WITH CURRENT FIRM <br />6 <br />15. FIRM NAME AND LOCATION (City and State) <br />Cummins Cederberg, Inc. (Fort Lauderdale, FL) <br />16. EDUCATION (DEGREE AND SPECIALIZATION) <br />MSc Ocean Engineering, University of Miami <br />BSc Civil Engineering, University of Miami <br /> 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br />E.I. 1100019727 (Florida, Engineering Intern) <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />Leonard is a coastal engineer with experience in the planning, engineering analysis, and design of coastal an d waterfront development <br />projects in Florida, the Caribbean, and Central America. He has performed the structural design of reinforced concrete sea wall panels, <br />streel sheet pile, seawalls, reinforced concrete capping beams, timber marinas, and concrete mar inas. He has also conducted beach <br />nourishment project throughout Miami-Dade County and developed numerical models for coastal processes and floodplain modifications. <br />19. RELEVANT PROJECTS <br />a. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Matheson Hammock Park Sea Level Rise and Flood Mitigation Plan, <br />Coral Gables, FL <br /> PROFESSIONAL <br />SERVICES CONSTRUCTION (If applicable) <br />2018 NA <br /> (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Coastal Engineer. Assisted in preparing a Sea Level Rise Flood Mitigation Plan to analyze the impacts of sea level rise <br />on the park’s infrastructure and operations, as well as develop flood miti gation concepts for planning and budgeting. <br />Compiled existing survey data within the Park and LiDAR data for the area to prepare a general topographic map for the <br />Park; assessed the condition of existing infrastructure to understand conditions, remaining s ervice life and adaption <br />feasibility relative to sea level rise; performed an assessment of the environmental conditions on site to generally <br />understand and document current conditions, as it would relate to environmental permitting; conducted an engineeri ng <br />analysis to provide extreme tide water levels; developed flood mitigation concepts and preliminary cost estimates; <br />coordinated stakeholder involvement; developed an implementation strategy; final report of findings and strategy. <br />b. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Haulover Park Sea Level Rise and Flood Mitigation Analysis, <br />Miami Beach, FL <br />PROFESSIONAL <br />SERVICES CONSTRUCTION (If applicable) <br />2020 NA <br /> (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Coastal Engineer. Assisted in preparing a Sea Level Rise Flood Mitigation Analysis to analyze the impacts of sea level <br />rise on the park’s infrastructure and operations, as well as develop flood mitigation concepts for planning and budgeting. <br />Compiled existing survey data within the Park and LiDAR data for the area to prepare a general topographic map for the <br />Park; assessed the condition of existing infrastruc ture to understand conditions, remaining service life and adaption <br />feasibility relative to sea level rise; performed an assessment of the environmental conditions on site to generally <br />understand and document current conditions, as it would relate to environmental permitting; conducted an engineering <br />analysis to provide extreme tide water levels; developed flood mitigation concepts and preliminary cost estimates; <br />coordinated stakeholder involvement; developed an implementation strategy; final report of findings and strategy. <br />c (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Miami Beach Truck Haul, <br />Miami Beach, FL <br />PROFESSIONAL <br />SERVICES <br />CONSTRUCTION (If applicable) <br />2015 NA <br /> (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Coastal Engineer. Performed surveying, data collection, volumetric and equilibrium toe of fill analysis based on available <br />historical beach profiles for four segments of beach. This information was utilized in designing the expansion of beach <br />segments for maintenance nourishment. <br />d. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Biscayne Bay Pilot’s Facility Port Miami, <br />Miami, FL <br />PROFESSIONAL <br />SERVICES CONSTRUCTION (If applicable) <br />Ongoing NA <br /> (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
The URL can be used to link to this page
Your browser does not support the video tag.