Laserfiche WebLink
<br />STANDARD FORM 330 (REV. 8/2016) PAGE 3 <br /> <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person) <br />12. NAME 13. ROLE IN THIS <br />CONTRACT 14. YEARS EXPERIENCE <br />Leonard Barrera, EI Coastal Engineer a. TOTAL <br />6 <br /> b. WITH CURRENT FIRM <br />6 <br />15. FIRM NAME AND LOCATION (City and State) <br />Cummins Cederberg, Inc. (Fort Lauderdale, FL) <br />16. EDUCATION (DEGREE AND SPECIALIZATION) <br />MSc Ocean Engineering, University of Miami <br />BSc Civil Engineering, University of Miami <br /> 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br />E.I. 1100019727 (Florida, Engineering Intern) <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />Leonard is a coastal engineer with experience in the planning, engineering analysis, and design of coastal an d waterfront development <br />projects in Florida, the Caribbean, and Central America. He has performed the structural design of reinforced concrete sea wall panels, <br />streel sheet pile, seawalls, reinforced concrete capping beams, timber marinas, and concrete mar inas. He has also conducted beach <br />nourishment project throughout Miami-Dade County and developed numerical models for coastal processes and floodplain modifications. <br />19. RELEVANT PROJECTS <br />a. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Matheson Hammock Park Sea Level Rise and Flood Mitigation Plan, <br />Coral Gables, FL <br /> PROFESSIONAL <br />SERVICES CONSTRUCTION (If applicable) <br />2018 NA <br /> (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Coastal Engineer. Assisted in preparing a Sea Level Rise Flood Mitigation Plan to analyze the impacts of sea level rise <br />on the park’s infrastructure and operations, as well as develop flood miti gation concepts for planning and budgeting. <br />Compiled existing survey data within the Park and LiDAR data for the area to prepare a general topographic map for the <br />Park; assessed the condition of existing infrastructure to understand conditions, remaining s ervice life and adaption <br />feasibility relative to sea level rise; performed an assessment of the environmental conditions on site to generally <br />understand and document current conditions, as it would relate to environmental permitting; conducted an engineeri ng <br />analysis to provide extreme tide water levels; developed flood mitigation concepts and preliminary cost estimates; <br />coordinated stakeholder involvement; developed an implementation strategy; final report of findings and strategy. <br />b. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Haulover Park Sea Level Rise and Flood Mitigation Analysis, <br />Miami Beach, FL <br />PROFESSIONAL <br />SERVICES CONSTRUCTION (If applicable) <br />2020 NA <br /> (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Coastal Engineer. Assisted in preparing a Sea Level Rise Flood Mitigation Analysis to analyze the impacts of sea level <br />rise on the park’s infrastructure and operations, as well as develop flood mitigation concepts for planning and budgeting. <br />Compiled existing survey data within the Park and LiDAR data for the area to prepare a general topographic map for the <br />Park; assessed the condition of existing infrastruc ture to understand conditions, remaining service life and adaption <br />feasibility relative to sea level rise; performed an assessment of the environmental conditions on site to generally <br />understand and document current conditions, as it would relate to environmental permitting; conducted an engineering <br />analysis to provide extreme tide water levels; developed flood mitigation concepts and preliminary cost estimates; <br />coordinated stakeholder involvement; developed an implementation strategy; final report of findings and strategy. <br />c (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Miami Beach Truck Haul, <br />Miami Beach, FL <br />PROFESSIONAL <br />SERVICES <br />CONSTRUCTION (If applicable) <br />2015 NA <br /> (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Coastal Engineer. Performed surveying, data collection, volumetric and equilibrium toe of fill analysis based on available <br />historical beach profiles for four segments of beach. This information was utilized in designing the expansion of beach <br />segments for maintenance nourishment. <br />d. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Biscayne Bay Pilot’s Facility Port Miami, <br />Miami, FL <br />PROFESSIONAL <br />SERVICES CONSTRUCTION (If applicable) <br />Ongoing NA <br /> (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm