|
<br />STANDARD FORM 330 (REV. 8/2016) PAGE 3
<br />
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person)
<br />12. NAME 13. ROLE IN THIS
<br />CONTRACT 14. YEARS EXPERIENCE
<br />Jason Taylor, PE Senior Structural
<br />Engineer
<br /> a. TOTAL
<br />23
<br /> b. WITH CURRENT FIRM
<br />3
<br />15. FIRM NAME AND LOCATION (City and State)
<br />Cummins Cederberg, Inc. (South Miami, FL)
<br />16. EDUCATION (DEGREE AND SPECIALIZATION)
<br />MSc Structural Engineering, Stanford University
<br />BSc Civil Engineering, Stanford University
<br /> 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
<br />▪ Florida PE 60277
<br />▪ Special Inspector
<br />▪ Advance Open Water Scuba
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />Jason specializes in structural inspection, design and construction administration for marine structural engineering projects. He has
<br />twenty-two years of experience as a structural engineer with a focus on coastal and marine stru ctures. Jason has completed marine
<br />structure projects in the US and the Bahamas, including ports, fender systems, mooring dolphins, bulkheads, seawalls, docks, and piers.
<br />Jason is also a certified diver and leads the Cummins Cederberg underwater structural inspection team made up entirely of engineers.
<br />19. RELEVANT PROJECTS
<br />a. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> Town of Bay Harbour Islands,
<br />Bay Harbour, FL
<br /> PROFESSIONAL
<br />SERVICES CONSTRUCTION (If applicable)
<br />2018 NA
<br /> (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Senior Project Engineer. Above and underwater inspection and condition assessment of 20,000 feet of seawall, rock
<br />revetment and dock structures along the three Bay Harbor Islands. The focus of the inspecti on was to identify cracks,
<br />spalling, corrosion, deterioration, damage and/or displacement as well as excessive undermining or sediment transport
<br />along the toe of seawalls. The planning of the project includes analysis of the inspection findings to determin e
<br />rehabilitation and/or replacement of the existing structures with respect to age, condition, and sea level rise resiliency
<br />b. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> Sunset Harbor Yacht Club,
<br />Miami Beach, FL
<br />PROFESSIONAL
<br />SERVICES CONSTRUCTION (If applicable)
<br />2019 2019
<br /> (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Senior Project Engineer. Repairs of concrete slabs, caps, and piles for 125-slip yacht marina. Detailed repair drawings
<br />were prepared with specific criteria to minimize impacts to adjacent structures, including the removal and replacement of
<br />severely deteriorated deck slabs. Construction administration services were provided to review in accordance with
<br />construction documents and environmental permits.
<br />c (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> Colonial Club Seawall Repair,
<br />Boynton Beach, FL
<br />PROFESSIONAL
<br />SERVICES
<br />CONSTRUCTION (If applicable)
<br />2019 2020
<br /> (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Senior Project Engineer. Initially performed above and below water inspection for a 1,500 LF seawall in need of repair.
<br />Designed the new seawall consisting of AZ hot-rolled steel sheet pile, pre-stressed concrete batter piles, and a steel
<br />reinforced cap. Construction administration services were also performed as well as a serving as Special Inspector for the
<br />marine structural components during construction.
<br />d. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> Bentley Bay Marina,
<br />Miami Beach, FL
<br />PROFESSIONAL
<br />SERVICES CONSTRUCTION (If applicable)
<br />2017 2018
<br /> (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Senior Project Engineer. Designed new marina utilizing concrete piles, cap and beams with grated decking, as required
<br />to allow for adequate light penetration to r each the submerged bottom supporting seagrass habitat. Structural design of
<br />the docks relative to extreme conditions ad vessel loads was conducted. Design se rvices also included material selection
<br />and coordination of utilities. Construction administration was performed including bidding, inspections, field reports and
<br />permit close-out.
<br />
|