Laserfiche WebLink
<br />STANDARD FORM 330 (REV. 8/2016) PAGE 3 <br /> <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person) <br />12. NAME 13. ROLE IN THIS <br />CONTRACT 14. YEARS EXPERIENCE <br />Jason Taylor, PE Senior Structural <br />Engineer <br /> a. TOTAL <br />23 <br /> b. WITH CURRENT FIRM <br />3 <br />15. FIRM NAME AND LOCATION (City and State) <br />Cummins Cederberg, Inc. (South Miami, FL) <br />16. EDUCATION (DEGREE AND SPECIALIZATION) <br />MSc Structural Engineering, Stanford University <br />BSc Civil Engineering, Stanford University <br /> 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br />▪ Florida PE 60277 <br />▪ Special Inspector <br />▪ Advance Open Water Scuba <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />Jason specializes in structural inspection, design and construction administration for marine structural engineering projects. He has <br />twenty-two years of experience as a structural engineer with a focus on coastal and marine stru ctures. Jason has completed marine <br />structure projects in the US and the Bahamas, including ports, fender systems, mooring dolphins, bulkheads, seawalls, docks, and piers. <br />Jason is also a certified diver and leads the Cummins Cederberg underwater structural inspection team made up entirely of engineers. <br />19. RELEVANT PROJECTS <br />a. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Town of Bay Harbour Islands, <br />Bay Harbour, FL <br /> PROFESSIONAL <br />SERVICES CONSTRUCTION (If applicable) <br />2018 NA <br /> (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Senior Project Engineer. Above and underwater inspection and condition assessment of 20,000 feet of seawall, rock <br />revetment and dock structures along the three Bay Harbor Islands. The focus of the inspecti on was to identify cracks, <br />spalling, corrosion, deterioration, damage and/or displacement as well as excessive undermining or sediment transport <br />along the toe of seawalls. The planning of the project includes analysis of the inspection findings to determin e <br />rehabilitation and/or replacement of the existing structures with respect to age, condition, and sea level rise resiliency <br />b. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Sunset Harbor Yacht Club, <br />Miami Beach, FL <br />PROFESSIONAL <br />SERVICES CONSTRUCTION (If applicable) <br />2019 2019 <br /> (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Senior Project Engineer. Repairs of concrete slabs, caps, and piles for 125-slip yacht marina. Detailed repair drawings <br />were prepared with specific criteria to minimize impacts to adjacent structures, including the removal and replacement of <br />severely deteriorated deck slabs. Construction administration services were provided to review in accordance with <br />construction documents and environmental permits. <br />c (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Colonial Club Seawall Repair, <br />Boynton Beach, FL <br />PROFESSIONAL <br />SERVICES <br />CONSTRUCTION (If applicable) <br />2019 2020 <br /> (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Senior Project Engineer. Initially performed above and below water inspection for a 1,500 LF seawall in need of repair. <br />Designed the new seawall consisting of AZ hot-rolled steel sheet pile, pre-stressed concrete batter piles, and a steel <br />reinforced cap. Construction administration services were also performed as well as a serving as Special Inspector for the <br />marine structural components during construction. <br />d. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Bentley Bay Marina, <br />Miami Beach, FL <br />PROFESSIONAL <br />SERVICES CONSTRUCTION (If applicable) <br />2017 2018 <br /> (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Senior Project Engineer. Designed new marina utilizing concrete piles, cap and beams with grated decking, as required <br />to allow for adequate light penetration to r each the submerged bottom supporting seagrass habitat. Structural design of <br />the docks relative to extreme conditions ad vessel loads was conducted. Design se rvices also included material selection <br />and coordination of utilities. Construction administration was performed including bidding, inspections, field reports and <br />permit close-out. <br />