Laserfiche WebLink
<br />STANDARD FORM 330 (REV. 8/2016) PAGE 4 <br /> <br /> <br />e. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Baker’s Haulvoer Inlet Feasibility Study, <br />City of Sunny Isles Beach, FL <br />PROFESSIONAL <br />SERVICES CONSTRUCTION (If applicable) <br />2019 NA <br /> (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Coastal Engineer. Performed a coastal engineering peer review of the Feasibility Study on behalf of the City for the <br />proposed Inlet Management Plan update. The peer review included a review of the Feasibility Study for general and <br />technical soundness relative to the City’s interests; specifically, updrift impacts and conservation of sand local resources. <br />The peer review included a review of the Feasibility Study to identify data gaps and inconsistencies to be included in the <br />final Inlet Management Plan. <br />