My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Cummins Cederberg Coastal & Marine Engineering
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
Cummins Cederberg Coastal & Marine Engineering
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2020 10:08:42 AM
Creation date
8/24/2020 10:08:01 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />STANDARD FORM 330 (REV. 8/2016) PAGE 4 <br /> <br /> <br />e. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Baker’s Haulvoer Inlet Feasibility Study, <br />City of Sunny Isles Beach, FL <br />PROFESSIONAL <br />SERVICES CONSTRUCTION (If applicable) <br />2019 NA <br /> (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Coastal Engineer. Performed a coastal engineering peer review of the Feasibility Study on behalf of the City for the <br />proposed Inlet Management Plan update. The peer review included a review of the Feasibility Study for general and <br />technical soundness relative to the City’s interests; specifically, updrift impacts and conservation of sand local resources. <br />The peer review included a review of the Feasibility Study to identify data gaps and inconsistencies to be included in the <br />final Inlet Management Plan. <br />
The URL can be used to link to this page
Your browser does not support the video tag.