Laserfiche WebLink
<br />STANDARD FORM 330 (REV. 8/2016) PAGE 3 <br /> <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person) <br />12. NAME 13. ROLE IN THIS <br />CONTRACT 14. YEARS EXPERIENCE <br />Jordon Cheifet, PE, CFM Senior Coastal <br />Engineer <br /> a. TOTAL <br />15 <br /> b. WITH CURRENT FIRM <br /><1 <br />15. FIRM NAME AND LOCATION (City and State) <br />Cummins Cederberg, Inc. (South Miami, FL) <br />16. EDUCATION (DEGREE AND SPECIALIZATION) <br />MSc Ocean and Resources Engineering, University of <br />Hawaii <br />BSc Civil Engineering, Pennsylvania State University <br /> 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br />PE 72876 (Florida, Professional Engineer) <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />Jordon is a Marine/Coastal Engineer with more than 15 years of technical and pr oject management experience, including coastal <br />engineering, beach nourishment design, waterfront structure design, FEMA coastal floodplain mapping, shoreline restoration/st abilization <br />design, numerical modeling, and marina design. His field experience incl udes underwater waterfront facility inspections, GIS/GPS data <br />collection and analysis, surveying, and construction administration. <br />19. RELEVANT PROJECTS <br />a. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Mooring Buoy Design, <br />Miami, FL <br /> PROFESSIONAL <br />SERVICES CONSTRUCTION (If applicable) <br />2020 TBD <br /> (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Coastal Engineer. Provided coastal engineering design for new mooring buoys at 6 artificial/natural reef sites in the <br />Atlantic Ocean. The project included sediment probes to determine buoy foundation requirements, engineering design, <br />and preparation of plans and specifications. Project is scheduled to begin construction Summer 2020. <br />b. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Coco Plum Beach Nourishment, <br />City of Marathon, FL <br />PROFESSIONAL <br />SERVICES CONSTRUCTION (If applicable) <br />Ongoing TBD <br /> (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Coastal Engineer. Provided coastal engineering services for a beach restoration project along approximately 1,500 feet <br />of shoreline eroded from Hurricane Irma. Project included beach template design, development of technical specifications, <br />and sediment characterization. Obtained FDEP CCCL permit while coordinating with City staff and local sand mine s. <br />Project is scheduled to begin construction Summer 2020. <br />c (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Storm Berm Nourishment, <br />City of Deerfield Beach, FL <br />PROFESSIONAL <br />SERVICES <br />CONSTRUCTION (If applicable) <br />2017 NA <br /> (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Coastal Engineer. Provided coastal engineering permitting and design services for a nourishment project along the <br />shoreline damaged by Hurricane Matthew. Services provided include preliminary design and submittal of an FDEP <br />Coastal Construction Control Line (CCCL) permit application. Prepared and submitted a Storm Impact Assessme nt Report <br />to FEMA for funding assistance. <br />d. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Mid-Town Beach Groin Construction, <br />Town of Palm Beach, Florida <br />PROFESSIONAL <br />SERVICES CONSTRUCTION (If applicable) <br />2018 NA <br /> (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Coastal Engineer. Provided structural/coastal engineering design for a 140-foot rubble mound groin to provide shoreline <br />stabilization along a severely eroded portion of the Atlantic Ocean shoreline. The project included armor stones , a marine <br />mattress foundation, and a beach fill to serve as a dry work area. Services performed included scour analyses, wave load <br />analyses, bidding support, and construction administration. He was the Engineer-of-Record for the project.