|
<br />STANDARD FORM 330 (REV. 8/2016) PAGE 3
<br />
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person)
<br />12. NAME 13. ROLE IN THIS
<br />CONTRACT 14. YEARS EXPERIENCE
<br />Jordon Cheifet, PE, CFM Senior Coastal
<br />Engineer
<br /> a. TOTAL
<br />15
<br /> b. WITH CURRENT FIRM
<br /><1
<br />15. FIRM NAME AND LOCATION (City and State)
<br />Cummins Cederberg, Inc. (South Miami, FL)
<br />16. EDUCATION (DEGREE AND SPECIALIZATION)
<br />MSc Ocean and Resources Engineering, University of
<br />Hawaii
<br />BSc Civil Engineering, Pennsylvania State University
<br /> 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
<br />PE 72876 (Florida, Professional Engineer)
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />Jordon is a Marine/Coastal Engineer with more than 15 years of technical and pr oject management experience, including coastal
<br />engineering, beach nourishment design, waterfront structure design, FEMA coastal floodplain mapping, shoreline restoration/st abilization
<br />design, numerical modeling, and marina design. His field experience incl udes underwater waterfront facility inspections, GIS/GPS data
<br />collection and analysis, surveying, and construction administration.
<br />19. RELEVANT PROJECTS
<br />a. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> Mooring Buoy Design,
<br />Miami, FL
<br /> PROFESSIONAL
<br />SERVICES CONSTRUCTION (If applicable)
<br />2020 TBD
<br /> (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Coastal Engineer. Provided coastal engineering design for new mooring buoys at 6 artificial/natural reef sites in the
<br />Atlantic Ocean. The project included sediment probes to determine buoy foundation requirements, engineering design,
<br />and preparation of plans and specifications. Project is scheduled to begin construction Summer 2020.
<br />b. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> Coco Plum Beach Nourishment,
<br />City of Marathon, FL
<br />PROFESSIONAL
<br />SERVICES CONSTRUCTION (If applicable)
<br />Ongoing TBD
<br /> (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Coastal Engineer. Provided coastal engineering services for a beach restoration project along approximately 1,500 feet
<br />of shoreline eroded from Hurricane Irma. Project included beach template design, development of technical specifications,
<br />and sediment characterization. Obtained FDEP CCCL permit while coordinating with City staff and local sand mine s.
<br />Project is scheduled to begin construction Summer 2020.
<br />c (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> Storm Berm Nourishment,
<br />City of Deerfield Beach, FL
<br />PROFESSIONAL
<br />SERVICES
<br />CONSTRUCTION (If applicable)
<br />2017 NA
<br /> (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Coastal Engineer. Provided coastal engineering permitting and design services for a nourishment project along the
<br />shoreline damaged by Hurricane Matthew. Services provided include preliminary design and submittal of an FDEP
<br />Coastal Construction Control Line (CCCL) permit application. Prepared and submitted a Storm Impact Assessme nt Report
<br />to FEMA for funding assistance.
<br />d. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> Mid-Town Beach Groin Construction,
<br />Town of Palm Beach, Florida
<br />PROFESSIONAL
<br />SERVICES CONSTRUCTION (If applicable)
<br />2018 NA
<br /> (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Coastal Engineer. Provided structural/coastal engineering design for a 140-foot rubble mound groin to provide shoreline
<br />stabilization along a severely eroded portion of the Atlantic Ocean shoreline. The project included armor stones , a marine
<br />mattress foundation, and a beach fill to serve as a dry work area. Services performed included scour analyses, wave load
<br />analyses, bidding support, and construction administration. He was the Engineer-of-Record for the project.
|