My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Cummins Cederberg Coastal & Marine Engineering
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
Cummins Cederberg Coastal & Marine Engineering
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2020 10:08:42 AM
Creation date
8/24/2020 10:08:01 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />STANDARD FORM 330 (REV. 8/2016) PAGE 3 <br /> <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person) <br />12. NAME 13. ROLE IN THIS <br />CONTRACT 14. YEARS EXPERIENCE <br />Kenkway “Ken” Chang, EI Marine Structural <br />Engineer <br /> a. TOTAL <br />3 <br /> b. WITH CURRENT FIRM <br />3 <br />15. FIRM NAME AND LOCATION (City and State) <br />Cummins Cederberg, Inc. (South Miami, FL) <br />16. EDUCATION (DEGREE AND SPECIALIZATION) <br />BSc Civil Engineering, Florida International University <br /> 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br />Engineer Intern (Reg No. 1100023002) <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />Ken specializes in marine structural engineering. He analyses the engineering approach to project designs and repairs, including all <br />calculation designs and construction plans in compliance with building codes and permitting. Ken assists with field observations for <br />construction administration and project site condition evaluations. He has experience creating extensive inspection reports and field work <br />assessments to ensure adequate service life of shoreline structures. <br />19. RELEVANT PROJECTS <br />a. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Landings of Largo Marine Engineering Services, <br />Key Largo, FL <br /> PROFESSIONAL <br />SERVICES CONSTRUCTION (If applicable) <br />Ongoing Ongoing <br /> (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Project Engineer. Marina rehabilitation of 62-slip marina impacted by Hurricane Irma, consisting of the replacement of the <br />docks and repairs to the shoreline stabilization and boat ramp. Ken designed new docks of approximately 6,200 LF in the <br />same footprint of existing. Designs include a timber framing and decking construction with new concrete piling. <br />Coordinated with MEP Engineer to meet marina needs and requirements. New electrical pedestal designs are <br />incorporated to serve the marina slips. Organized a calculation packet for the proposed design. Prepared construction <br />plans to display existing, proposed, and section details of the project site. <br />b. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Oakland Grove Park and Dock Marine Engineering Services, <br />Miami, FL <br />PROFESSIONAL <br />SERVICES CONSTRUCTION (If applicable) <br />2018 NA <br /> (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Project Engineer. Designed new deck platform of approximately 300 LF that included ten timber piles and a railing along <br />the north side. The deck will be constructed with timber framing and decking boards in the same footprint as existing, plus <br />a 10-foot extension to the west. An additional timber access walkway and timber benches were added along the new <br />deck. Organized a calculation packet for th e proposed design. Prepared construction plans to display existing, proposed, <br />and section details of the park site. <br />c (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Abitare Condominium Marine Engineering and Dock Repair Project, <br />Miami, FL <br />PROFESSIONAL <br />SERVICES <br />CONSTRUCTION (If applicable) <br />2019 Ongoing <br /> (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Project Engineer. Designed replacement dock of approximately 2,270 LF in same footprint of existing prior to Hurricane <br />Irma damage. The dock will be constructed with timber framing and decking boards. The dock replacement includes the <br />design of 14 slips and davits used for boat mooring. Organized a calculation packet for the proposed design. Prepared <br />construction plans to display existing, proposed, and section details of the project site. <br />d. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Watson Boat Ramp Repairs, <br />Miami, FL <br />PROFESSIONAL <br />SERVICES CONSTRUCTION (If applicable) <br />2019 2018 <br /> (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Project Engineer. Prepared plan drawings and calculations for the Watson Island boat ramp repairs in the same footprint <br />of existing prior to Hurricane Irma. Repairs were completed with timber framing and grated decking. <br />e. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
The URL can be used to link to this page
Your browser does not support the video tag.