Laserfiche WebLink
<br />STANDARD FORM 330 (REV. 8/2016) PAGE 4 <br /> <br /> <br /> FiftySixSixty Condominium Marina Project <br />Miami, FL <br />PROFESSIONAL <br />SERVICES CONSTRUCTION (If applicable) <br />2019 Ongoing <br /> (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Project Engineer. Marina rehabilitation of 14-slip marina impacted by Hurricane Irma, consisting of the replacement of <br />the docks, viewing platforms, and floating lifts. Ken re-designed new docks of approximately 400 LF along the property’s <br />shoreline. Designs include a timber framing and decking construction with new concrete piling. Slips design included lift <br />designs for both boats and jet skis. Coordinated with MEP Engineer to meet marina needs and requirements. New <br />electrical pedestal designs are incorporated to serve the marina slips. Organized a calculation packet for the proposed <br />design. Prepared construction plans to display existing, proposed, and section details of the project site. <br />