My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Cummins Cederberg Coastal & Marine Engineering
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
Cummins Cederberg Coastal & Marine Engineering
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2020 10:08:42 AM
Creation date
8/24/2020 10:08:01 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />STANDARD FORM 330 (REV. 8/2016) PAGE 3 <br /> <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person) <br />12. NAME 13. ROLE IN THIS <br />CONTRACT 14. YEARS EXPERIENCE <br />Danielle Irwin, CFM, PWS, LEED AP Permitting & <br />Regulatory Specialist <br /> a. TOTAL <br />19 <br /> b. WITH CURRENT FIRM <br />1 <br />15. FIRM NAME AND LOCATION (City and State) <br />Cummins Cederberg, Inc. (Tallahassee, FL) <br />16. EDUCATION (DEGREE AND SPECIALIZATION) <br />MSc Oceanography, Florida State University <br />BA Environmental Studies, University of Southern <br />California <br />BSc Biology, University of Southern California <br /> 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br />▪ Certified Floodplain Manager <br />▪ Professional Wetland Scientist <br />▪ LEED Accredited Professional BD&C <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br /> <br />19. RELEVANT PROJECTS <br />a. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Waterfront Adaptation at Jose Marti Park, <br />Miami, FL <br /> PROFESSIONAL <br />SERVICES CONSTRUCTION (If applicable) <br />Ongoing NA <br /> (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Regulatory Specialist. Provide waterfront design and permitting assistance for sea level rise adaptation project including <br />water taxi landing, kayak launch, fixed and floating platforms, eco-enhanced seawalls and living shorelines. <br />b. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Bal Harbour Village Coastal Program Management, <br />Bal Harbour Village, FL <br />PROFESSIONAL <br />SERVICES CONSTRUCTION (If applicable) <br />Ongoing NA <br /> (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Project Manager. Providing ongoing coastal management support for the Village including development of a Village-wide <br />dune restoration plan, permitting and design of a bea ch nourishment project, providing drone aerial surveys of the Village <br />shoreline, and representing the Village on the Bakers Haulover Inlet Technical Advisory Committee. <br />c (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Fisher Island Club Visitor Marina Improvements, <br />Miami, FL <br />PROFESSIONAL <br />SERVICES <br />CONSTRUCTION (If applicable) <br />2019 2019 <br /> (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Project Manager. Environmental permitting for marina improvements including maintenance dredging, pier replacements, <br />and consolidation/expansion of the multiple sovereignty submerged lands easements and lease covering the marina, <br />breakwater and jetty. <br /> <br />d. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> City of Miami DDA Resiliency Guidelines, <br />Miami, FL <br />PROFESSIONAL <br />SERVICES CONSTRUCTION (If applicable) <br />2019 N/A <br /> (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Regulatory Specialist. Drafted shoreline resiliency guidelines for the City ’s Downtown Development Authority through <br />prime contractor. Included recommended seawall elevation standards and living shoreline best management practices. <br />e. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> PortMiami Environmental Monitoring, <br />Miami, FL <br />PROFESSIONAL <br />SERVICES CONSTRUCTION (If applicable) <br />2019 N/A <br /> (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Biological Monitoring Project Manager of the artificial reef, seagrass mitigation, and hardbottom impact areas <br />associated with Port Deepening. Assessed field data and oversaw the reporting for permit compliance. Assisted in <br />environmental permit compliance efforts with the regulatory agencies. <br />
The URL can be used to link to this page
Your browser does not support the video tag.