My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Cummins Cederberg Coastal & Marine Engineering
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
Cummins Cederberg Coastal & Marine Engineering
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2020 10:08:42 AM
Creation date
8/24/2020 10:08:01 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />STANDARD FORM 330 (REV. 8/2016) PAGE 3 <br /> <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person) <br />12. NAME 13. ROLE IN THIS <br />CONTRACT 14. YEARS EXPERIENCE <br />Penny Cutt Project Manager a. TOTAL <br />26 <br /> b. WITH CURRENT FIRM <br /><1 <br />15. FIRM NAME AND LOCATION (City and State) <br />Cummins Cederberg, Inc. (Fort Lauderdale, FL) <br />16. EDUCATION (DEGREE AND SPECIALIZATION) <br />MSc (Dual) Marine Biology and Coastal Zone <br />Management, Nova Southeastern University (pending <br />capstone review) <br />BSc Agricultural Operations Management <br />Specialization: Bioprocess Management, University of <br />Florida <br /> 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br />▪ DAN (First Aid, CPR, AED, & Oxygen) <br />▪ Advanced Open Water Scuba <br />▪ US Power Squadron Safe Boat Operation <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />Penny is a senior project manager and marine biologist with over 26 years of experience in the fields of environmental monitoring, <br />assessment, planning and regulatory permitting to support the fi rms’ commitment to sustainability. She applies this project management <br />experience to ensure timeliness and accuracy of deliverables for projects being managed. Penny can quickly evaluate complex s cientific <br />information and communicate it to lay leaders for decision-making purposes. She has a proven track record negotiating complex technical <br />issues, particularly regarding aquatic and coastal ecosystems. The first half of Penny's career was in the public sector admi nistering <br />federal, state, and county environmental regulatory programs. This government expertise has been paramount to her success in the more <br />recent half of her career assisting public and private clients in the private sector. <br />19. RELEVANT PROJECTS <br />a. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Fisher Island Sand Tightening Project, <br />Fisher Island, FL <br /> PROFESSIONAL <br />SERVICES CONSTRUCTION (If applicable) <br />Ongoing NA <br /> (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Project Manager. Conducted a seagrass/hardbottom mapping and coral survey/report in support of the upcoming sand <br />tightening project. The Main Beach and Club Beach terminal groins along the eastern portion of Fisher Island are <br />permeable, allowing sand to escape the beach and is affecting beach performance and causing shoaling in the adjacent <br />marina. Held pre-application meetings, submitted permit applications and are currently processing them through Miami- <br />Dade County DERM, the FDEP, and the Corps to authorize construction activities. Additionally, had discussions with FWC <br />regarding securing a Special Activity License for relocating corals and have negotiated no relocatio n mitigation to be <br />necessary. <br />b. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Town of Palm Beach Dock Replacement, <br />Town of Palm Beach, FL <br />PROFESSIONAL <br />SERVICES CONSTRUCTION (If applicable) <br />2019 2020 <br /> (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Project Manager responsible for the conducting two marine resource surveys of the submerged lands within and <br />surrounding the TOPB public marina an d proposed dredge areas, coordinated and participated in pre-application <br />meetings with the Corps, FDEP and Palm Beach County. Acquired the necessary state and federal permits to conduct <br />geotechnical surveys, as well as, an FDEP ERP, FDEP Sovereign Submerge d Lands Lease modification, a Public <br />Easement, Corps Individual Permit authorizing the demolition of existing docks and over-water buildings, construction of <br />four floating docks with 2 new over-water buildings, and dredging of 78,605 cy of material between -10.4 to -17.1 ft. Also <br />secured approval from Palm Beach County to use the Mid-Depth Artificial Reef and Tarpon Cove Restoration area as <br />disposal sites for the old docks and dredged material in support of the Town Docks Project located at 500 Australian <br />Avenue in Palm Beach. <br />c (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Miami Harbor Phase III, <br />Miami, FL <br />PROFESSIONAL <br />SERVICES <br />CONSTRUCTION (If applicable) <br />2018 NA <br /> (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
The URL can be used to link to this page
Your browser does not support the video tag.