My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Cummins Cederberg Coastal & Marine Engineering
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
Cummins Cederberg Coastal & Marine Engineering
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2020 10:08:42 AM
Creation date
8/24/2020 10:08:01 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />STANDARD FORM 330 (REV. 8/2016) PAGE 4 <br /> <br /> <br />Project Manager responsible for overseeing, budgeting, scheduling, supervising staff, data collection, and report <br />preparation for five separate marine resource, coral health, coral transplantation survivorship, artificial reef and seagrass <br />monitoring projects in conjunction with the U.S. Army Corps of Engineers M iami Harbor Phase III Federal Channel <br />Expansion Project. <br />d. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Rickenbacker Causeway Hobie Island North Storm Water <br />Improvement, <br />Miami-Dade County, FL <br />PROFESSIONAL <br />SERVICES CONSTRUCTION (If applicable) <br />2018 NA <br /> (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Project Manager responsible for environmental permitting and des ign of roadway improvement project along the north <br />side of Hobie Island, adjacent to Rickenbacker Causeway. Conducted several biological resource surveys including <br />seagrass beds, coastal wetlands and an uplands exotic vegetation survey. Oversaw design of p roject to ensure adequate <br />buffers between proposed shoreline stabilization structures and nearshore seagrass beds. Secured Miami-Dade County <br />DERM, South Florida Water Management District (SFWMD), and Corps permits to authorize project construction. This <br />Project will provide treatment of stormwater from the north half of Rickenbacker causeway, which cu rrently sheet flows to <br />tide. Stormwater management is being designed to meet Miami-Dade County public works criteria, which is more stringent <br />than the SFWMD Basis of Review minimum criteria. Project includes various recreational improvements including exot ic <br />vegetation removal, native vegetation planting, beach nourishment, grading, and parking improvements for improved <br />public recreation. <br />e. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Currie Park Staging Docks, <br />City of West Palm Beach, FL <br />PROFESSIONAL <br />SERVICES CONSTRUCTION (If applicable) <br />2016 NA <br /> (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Project Manager responsible for the permitting of an FDEP Environmental Resource Permit, Corps Individual Permit, U.S <br />Coast Guard PATON Permit, and FWC Uniform Waterway Marker Permit for the staging docks, dredging and channel <br />markers adjacent to Currie Park in West Palm B each, Florida. Also conducted the marine resource survey and seagrass <br />mapping for the planning and design of the Project. <br />
The URL can be used to link to this page
Your browser does not support the video tag.