My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Cummins Cederberg Coastal & Marine Engineering
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
Cummins Cederberg Coastal & Marine Engineering
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2020 10:08:42 AM
Creation date
8/24/2020 10:08:01 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />ARCHITECT – ENGINEER QUALIFICATIONS <br />Part I – Contract-Specific Qualifications <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS OF EXPERIENCE <br />Adam Benson Operations Manager a. Total 25 b. With Current Firm 23 <br />15. FIRM NAME AND LOCATION (City and State) <br />Amdrill Inc., Orlando, Florida <br />16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br /> <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />OSHA 40 hour Hazwoper , OSHA 8 Hour Hazwoper Refresher , MSHA Certified <br />19. RELEVANT PROJECTS <br />a. <br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />Golden Triangle Marsh Creation Project <br />Lake Borgne, LA (On behalf of APTIM and the Coastal <br />Protection and Restoration Authority of Louisiana) <br />PROFESSIONAL SERVICES CONSTRUCTION (If <br />applicable) <br />2018 <br />BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Mr. Benson was a part of the team overseeing the sampling. The Golden Triangle wetlands is an important <br />natural buffer that is one of the multiple lines of defense protecting vulnerable communities in and around <br />the city of New Orleans from storm surge. The project goal was to identify a borrow area containing 6 - 9 <br />million cubic yards of suitable marsh fill material and design a project to create ne w wetland habitat, restore <br />degraded marsh, and reduce wave erosion outside of the Inner Harbor Navigation Canal surge barrier. Our <br />geotechnical investigation collected vibracores and grab samples within the borrow area . <br />b. <br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />Bakers Haulover Flood Shoal <br />Miami, Florida <br />PROFESSIONAL SERVICES CONSTRUCTION (If <br />applicable) <br />2019 <br />BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Mr. Benson was a part of the team overseeing the sampling activities. For a flood shoal project, 42 vibracore <br />samples were collected utilizing our Scully barge in various locations in the intracoastal waterway near <br />Haulover Pass. <br />c. <br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />Clearwater Pass Vibracore Study <br />Vicinity of Clearwater Pass in Pinellas County, Florida <br />PROFESSIONAL SERVICES CONSTRUCTION (If <br />applicable) <br />2017 <br />BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Mr. Benson was a part of the team overseeing the sampling activities. Clearwater Pass was in need of <br />maintenance dredging with potential beach placement of the dredged material. The project area was <br />located in Clearwater Beach, approximately 30 miles west of Tampa, Florida. The Clearwater Pass channel <br />extends from the Clearwater Harbor into the Gulf of Mexico. For a sand search investigation, we collected <br />vibracore sediment samples in Clearwater Pass and performed this vibracoring within protected State <br />waters. Thirteen vibracores to a depth of 10 feet or to refusal was collected. <br />d. <br />(1) TITLE AND LOCATION (City and State) SECTION F PROJECT #5 (2) YEAR COMPLETED <br />Broward County Water Conservation Area C-11 Impoundment <br />Miami, Florida <br />PROFESSIONAL SERVICES CONSTRUCTION (If <br />applicable) <br />2019 <br />BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Mr. Benson was a part of the operations team overseeing the daily sampling activities. The objective was
The URL can be used to link to this page
Your browser does not support the video tag.