Laserfiche WebLink
<br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />ARCHITECT – ENGINEER QUALIFICATIONS <br />Part I – Contract-Specific Qualifications <br />to supplement the available data on the various features of the C-11 Impoundment, including <br />embankments, as well as several structures along the project area. Our wetlands experience allowed us to <br />be minimally invasive at the project location. With our amphibious mounted drill rig and support equipment, <br />we conducted soil investigations by performing SPT and core drilling. Large scale DRI tests were perfo rmed <br />on exposed limestone surfaces. All samples were photographed and recorded. Upon completion of the <br />geotechnical borings, each bore hole to surface was tremmie grouted. <br />e. <br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />Duke Energy – Dry Prairie <br />Bowling Green, Florida <br />PROFESSIONAL SERVICES CONSTRUCTION (If <br />applicable) <br />2018 <br />BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Mr. Benson was a part of the operations team overseeing the daily sampling activities. The purpose of the <br />geotechnical investigation was to determine soil density before construction of a substation. Over 50 SPT <br />borings were drilled to identify the soil density. ATV mounted drill rigs installed 1,242 grout points for a total <br />of 49,680 linear feet drilled. Grouting equipment was mobilized to stabilize the soil. A Reed high pressure <br />concrete pump was used to force 5,150 cubic yards of compaction grout into the 1,242 grout injection <br />points. Additional SPT borings were done throughout the area to confirm the compaction grouting process <br />accomplished the soil stabilization. <br />f. <br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />Panama City Harbor, Florida <br />(On behalf of USACE Mobile District, FDEP and Taylor <br />Engineering) <br />PROFESSIONAL SERVICES CONSTRUCTION (If <br />applicable) <br />2019 <br />BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Mr. Benson was a part of the operations team overseeing the daily sampling activities. For this <br />geotechnical investigation, we collected vibracores to 20’ in the specified locations. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />