My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Cummins Cederberg Coastal & Marine Engineering
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
Cummins Cederberg Coastal & Marine Engineering
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2020 10:08:42 AM
Creation date
8/24/2020 10:08:01 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Mr. Clarkson was the principal in charge of operations. To assist the Town of Oak Island in their master <br />plan for shore protection and beach nourishment efforts, we performed geological field investigations <br />consisting of vibracore sampling to evaluate potential borrow sources. Borrow areas surveyed include <br />offshore sources, inlets, navigation channels and upland disposal areas. The investigation consisted of a <br />minimum of 150 cores and maximum of 200 cores, providing flexibility to shift cores from borrow ar eas that <br />contained undesirable material based on the field inspections. This project was comprised of two separate <br />phases of work, in 2019 and 2020. <br />e. <br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />Broward County Water Conservation Area C-11 Impoundment <br />Miami, Florida <br />PROFESSIONAL SERVICES CONSTRUCTION (If <br />applicable) <br />2019 <br />BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Mr. Clarkson was the principal in charge of operations and ensured the project was successful meeting <br />logistics, required timelines and budget. The objective was to supplement the available data on the various <br />features of the C-11 Impoundment, including embankments, as well as several structures along the project <br />area. Our wetlands experience allowed us to be minimally invasive at the proj ect location. With our <br />amphibious mounted drill rig and support equipment, we conducted soil investigations by performing SPT <br />and core drilling. Large scale DRI tests were performed on exposed limestone surfaces. All samples were <br />photographed and recorded. Upon completion of the geotechnical borings, each bore hole to surface was <br />tremmie grouted. <br />f. <br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />Bakers Haulover Flood Shoal <br />Miami, Florida <br />PROFESSIONAL SERVICES CONSTRUCTION (If <br />applicable) <br />2019 <br />BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Mr. Clarkson was the principal in charge of operations. For a flood shoal project, 42 vibracore samples were <br />collected utilizing our Scully barge in various locations in the intracoastal waterway near Haulover Pass. <br />g. <br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />Golden Triangle Marsh Creation Project <br />Lake Borgne, LA (On behalf of the Coastal Protection and <br />Restoration Authority of Louisiana) <br />PROFESSIONAL SERVICES CONSTRUCTION (If <br />applicable) <br />2018 <br />BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Mr. Clarkson was the principal in charge of operations. The Golden Triangle wetlands is an important natural <br />buffer that is one of the multiple lines of defense protecting vulnerable communities in and around the city <br />of New Orleans from storm surge. The project goal was to identify a borrow area containing 6 - 9 million <br />cubic yards of suitable marsh fill material and design a project to create new wetland habitat, restore <br />degraded marsh, and reduce wave erosion outside of the Inner Harbor Navigation Canal surge barrier. Our <br />geotechnical investigation collected vibracores and grab samples within the borrow area. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.