E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person.)
<br />12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE
<br />Sebastian Forbis, RCDD Lead Technology Designer a. TOTAL b. WITH CURRENT FIRM
<br />17 <1
<br />15. FIRM NAME AND LOCATION (City and State)
<br />Osborn Engineering (Orlando, Florida)
<br />16. EDUCATION (Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)
<br />AS Information Technology, Valencia College, 2003 Registered Communications Distribution Designer
<br />AS Architectural Building Sciences/Technology, ITT Technical
<br />Institute, 1999
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />Building Industry Consulting Services International (BICSI) Member
<br />Themed Entertainment Association (TEA) Member
<br />19. RELEVANT PROJECTS
<br />STANDARD FORM 330 (REV. 8/2016) PAGE 2
<br />RFQ 20-07-01 CONTINUING PROFESSIONAL CONSULTING SERVICES SECTION E - PAGE 27
<br />(1) TITLE AND LOCATION (City and State)
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />CONSTRUCTION (ifapplicable)
<br />Broward County - Main Library Chiller/Air Handler Unit Replacement
<br />Fort Lauderdale, Florida
<br />2020
<br />1 2021 estimated
<br />a.
<br />(3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.) AND SPECIFIC ROLE �✓ Check if performed with current firm
<br />Project involved replacement of air handling units (AHUs) and related components of the HVAC system. Work involved replacement
<br />of 10 units, including new access for 2 units, new cooling coils for 9 units, new two-way chilled water control valves. Also replaced
<br />water-cooled chillers, condenser water pumps. Size: Library is an 8 -story, 272,00 SF building. Role: Technology Engineer.
<br />(1) TITLE AND LOCATION (City and State)
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />CONSTRUCTION (ifapplicable)
<br />City of Doral - Cultural Arts Center
<br />Doral, Florida
<br />2019
<br />1 2021 estimated
<br />b.
<br />(3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.) AND SPECIFIC ROLE ❑✓ Check if performed with current firm
<br />Osborn provided Technology Design Services which included structured cabling system (voice, data, wireless access points),
<br />communication network design, community access television (CATV) system, audio/visual system, surveillance cameras and
<br />access control system. Role: Technology Engineer.
<br />(1) TITLE AND LOCATION (City and State)
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />CONSTRUCTION (ifapplicable)
<br />Broward County- West Regional Courthouse
<br />Plantation, Florida
<br />2020
<br />2021 estimated
<br />c.
<br />(3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.) AND SPECIFIC ROLE F✓ Check if performed with current firm
<br />Osborn provided MEP/Technology services for the renovation of the courthouse including the Clerk of Court office, renovation of
<br />the Passport & Marriage & Domestic Violence services, security check points and County Civil / Traffic & Misdemeanor areas. Size:
<br />9,600 SF. Role: Technology Engineer.
<br />(1) TITLE AND LOCATION (City and State)
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />CONSTRUCTION (ifapplicable)
<br />City of Doral - Central Park
<br />Doral, Florida
<br />2020 1
<br />2021 estimated
<br />d.
<br />(3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.) AND SPECIFIC ROLE FVCheck if performed with current firm
<br />Provided Technology Design services including structured cabling system, audio visual system and security (including surveillance
<br />cameras and access control) for amphitheater, ballfields, recreational & aquatics areas of the park. Role: Technology Engineer.
<br />(1) TITLE AND LOCATION (City and State)
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />CONSTRUCTION (ifapplicable)
<br />City of Doral - White Course Park
<br />Doral, Florida
<br />2020 1
<br />2021 estimated
<br />e.
<br />(3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.) AND SPECIFIC ROLE F✓ Check if performed with current firm
<br />Osborn provided MEP permit drawings and contract administration services for the design of electrical site and parking lot lighting,
<br />as well as MEP design for one restroom building, power for the irrigation system, and empty conduit and power for a future security
<br />system. Role: Technology Engineer.
<br />STANDARD FORM 330 (REV. 8/2016) PAGE 2
<br />RFQ 20-07-01 CONTINUING PROFESSIONAL CONSULTING SERVICES SECTION E - PAGE 27
<br />
|