Laserfiche WebLink
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE <br />Sebastian Forbis, RCDD Lead Technology Designer a. TOTAL b. WITH CURRENT FIRM <br />17 <1 <br />15. FIRM NAME AND LOCATION (City and State) <br />Osborn Engineering (Orlando, Florida) <br />16. EDUCATION (Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) <br />AS Information Technology, Valencia College, 2003 Registered Communications Distribution Designer <br />AS Architectural Building Sciences/Technology, ITT Technical <br />Institute, 1999 <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />Building Industry Consulting Services International (BICSI) Member <br />Themed Entertainment Association (TEA) Member <br />19. RELEVANT PROJECTS <br />STANDARD FORM 330 (REV. 8/2016) PAGE 2 <br />RFQ 20-07-01 CONTINUING PROFESSIONAL CONSULTING SERVICES SECTION E - PAGE 27 <br />(1) TITLE AND LOCATION (City and State) <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (ifapplicable) <br />Broward County - Main Library Chiller/Air Handler Unit Replacement <br />Fort Lauderdale, Florida <br />2020 <br />1 2021 estimated <br />a. <br />(3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.) AND SPECIFIC ROLE �✓ Check if performed with current firm <br />Project involved replacement of air handling units (AHUs) and related components of the HVAC system. Work involved replacement <br />of 10 units, including new access for 2 units, new cooling coils for 9 units, new two-way chilled water control valves. Also replaced <br />water-cooled chillers, condenser water pumps. Size: Library is an 8 -story, 272,00 SF building. Role: Technology Engineer. <br />(1) TITLE AND LOCATION (City and State) <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (ifapplicable) <br />City of Doral - Cultural Arts Center <br />Doral, Florida <br />2019 <br />1 2021 estimated <br />b. <br />(3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.) AND SPECIFIC ROLE ❑✓ Check if performed with current firm <br />Osborn provided Technology Design Services which included structured cabling system (voice, data, wireless access points), <br />communication network design, community access television (CATV) system, audio/visual system, surveillance cameras and <br />access control system. Role: Technology Engineer. <br />(1) TITLE AND LOCATION (City and State) <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (ifapplicable) <br />Broward County- West Regional Courthouse <br />Plantation, Florida <br />2020 <br />2021 estimated <br />c. <br />(3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.) AND SPECIFIC ROLE F✓ Check if performed with current firm <br />Osborn provided MEP/Technology services for the renovation of the courthouse including the Clerk of Court office, renovation of <br />the Passport & Marriage & Domestic Violence services, security check points and County Civil / Traffic & Misdemeanor areas. Size: <br />9,600 SF. Role: Technology Engineer. <br />(1) TITLE AND LOCATION (City and State) <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (ifapplicable) <br />City of Doral - Central Park <br />Doral, Florida <br />2020 1 <br />2021 estimated <br />d. <br />(3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.) AND SPECIFIC ROLE FVCheck if performed with current firm <br />Provided Technology Design services including structured cabling system, audio visual system and security (including surveillance <br />cameras and access control) for amphitheater, ballfields, recreational & aquatics areas of the park. Role: Technology Engineer. <br />(1) TITLE AND LOCATION (City and State) <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (ifapplicable) <br />City of Doral - White Course Park <br />Doral, Florida <br />2020 1 <br />2021 estimated <br />e. <br />(3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.) AND SPECIFIC ROLE F✓ Check if performed with current firm <br />Osborn provided MEP permit drawings and contract administration services for the design of electrical site and parking lot lighting, <br />as well as MEP design for one restroom building, power for the irrigation system, and empty conduit and power for a future security <br />system. Role: Technology Engineer. <br />STANDARD FORM 330 (REV. 8/2016) PAGE 2 <br />RFQ 20-07-01 CONTINUING PROFESSIONAL CONSULTING SERVICES SECTION E - PAGE 27 <br />