E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person.)
<br />12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE
<br />Jonathan J. Gotwald, PE Lead Civil Engineer a. TOTAL b. WITH CURRENT FIRM
<br />41 1+
<br />15. FIRM NAME AND LOCATION (City and State)
<br />Osborn Engineering (St. Petersburg, Florida)
<br />16. EDUCATION (Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)
<br />Master of Engineering Management, University of Florida, 2002 Professional Engineer (Florida, Civil)
<br />BSCE, University of Toledo, 1979
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />FL Engineering Society; FL Education Facilities Planner's Association; FL Healthcare Engineers Association; American
<br />Society of Healthcare Engineers; Leadership St. Pete Alumni Association
<br />19. RELEVANT PROJECTS
<br />STANDARD FORM 330 (REV. 8/2016) PAGE 2
<br />RFQ 20-07-01 CONTINUING PROFESSIONAL CONSULTING SERVICES SECTION E - PAGE 28
<br />(1) TITLE AND LOCATION (City and State)
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />CONSTRUCTION (ifapplicable)
<br />1
<br />Pinellas County Sheriff's Office - Hangar Expansion at the St. Pete -Clearwater
<br />International Airport, Clearwater, Florida
<br />2020
<br />2021 estimated
<br />a.
<br />(3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.) AND SPECIFIC ROLE Z✓ Check if performed with current firm
<br />Prepared a design criteria package based on a thorough review of existing site infrastructure and permits for a new hangar capable
<br />of supporting 4-6 aircraft next to the existing hangar, while the existing hangar remains in use throughout construction of the new
<br />hangar. Pinellas County Continuing Services Contract Task Assignment. 38,000 SF. Role: Director -in -Charge.
<br />(1) TITLE AND LOCATION (City and State)
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />CONSTRUCTION (ifapplicable)
<br />Pinellas County - EMS Parking Study
<br />Clearwater, Florida
<br />2019
<br />1 2021 estimated
<br />b.
<br />(3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.) AND SPECIFIC ROLE �✓ Check if performed with current firm
<br />Provided civil engineering services as part of a site assessment report with recommendations for improvements and conceptual
<br />designs to evaluate the potential for expanding the capacity of the EMS parking lot while also providing a more efficient ADA
<br />accessibility plan. Pinellas County Continuing Services Contract Task Assignment. Role: Director -in -Charge
<br />(1) TITLE AND LOCATION (City and State)
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />CONSTRUCTION (ifapplicable)
<br />Pinellas County - Jail Security and Entry Center (SEC) Design
<br />Clearwater, Florida
<br />2019
<br />1 2021 estimated
<br />c.
<br />(3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.) AND SPECIFIC ROLE ❑✓ Check if performed with currentfirm
<br />Project to relocate the SEC to improve the safety and security at the jail entrance. Relocation and new construction of over
<br />2,500 LF of underground piping and utilities including water, reclaimed, sewer, storm, fiberoptic, power and security systems
<br />to construct building and 295 associated parking spaces. Pinellas County Task Assignment. Role: Director -in -Charge.
<br />(1) TITLE AND LOCATION (Cityand State)
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />1
<br />CONSTRUCTION (ifapplicable)
<br />Pinellas County - Criminal Courts Facility Parking Garage
<br />Largo, Florida
<br />2018
<br />2018
<br />d.
<br />(3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.) AND SPECIFIC ROLE Check if performed with current firm
<br />Design, construction drawings and permitting for parking garage as part of Phase I of the Courts Facilities consolidation and
<br />renovations plan. Infrastructure improvements included modifying an existing stormwater management facility, avoidance of
<br />wetland ditches, water/sewer utility relocations, ADA accessible connections. Size: 550 spaces Role: Principal -in -Charge
<br />(1) TITLE AND LOCATION (Cityand State)
<br />(2) YEAR COMPLETED
<br />PROFESSIONALSERVICES
<br />CONSTRUCTION (ifapplicable)
<br />Pinellas County -Jail Criteria Package
<br />Pinellas County, Florida
<br />2015
<br />2017
<br />e.
<br />(3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.) AND SPECIFIC ROLE r] Check if performed with current firm
<br />Provided Pinellas County Jail programming assistance to Dewberry and Associates to develop the updated jail master plan. The
<br />report included fire and portable water systems, sanitary sewer, storm drainage and stormwater management, paving, grading and
<br />utilities relocation. Role: Director -in -Charge.
<br />STANDARD FORM 330 (REV. 8/2016) PAGE 2
<br />RFQ 20-07-01 CONTINUING PROFESSIONAL CONSULTING SERVICES SECTION E - PAGE 28
<br />
|