My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Osborn Engineering
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
Osborn Engineering
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2020 10:55:45 AM
Creation date
8/24/2020 10:53:20 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
144
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DAY 1: <br />Project Notification <br />• Discuss needs with <br />City Staff <br />• Prepare Proposal <br />DAY 2-7: <br />Minor/Emergency Tasks <br />• Verbal Directives <br />• Letter of Instruction <br />• Support Documentation <br />DAY 1-2: <br />On Site Review <br />• Evaluation <br />• Analysis <br />• Data Gathering <br />DAY 2-30: <br />Small Projects <br />• Minimal Design <br />• Sketches <br />• Short Form Specs <br />Osborn Engineering FOLLOW-UP and <br />SUPPORT to City Staff <br />DAY 2 -Depending on Scope: <br />Additions/ Renovations <br />• Full Design/Review Process <br />• Bidding <br />• Construction Administration <br />• Acceptance <br />RESULTS: <br />• Minimum Impact to Ongoing Operations <br />• Value for $$ <br />• Successfully Operating Systems <br />RFQ 20-07-01 CONTINUING PROFESSIONAL CONSULTING SERVICES <br />SECTION C - PAGE 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.