Laserfiche WebLink
DAY 1: <br />Project Notification <br />• Discuss needs with <br />City Staff <br />• Prepare Proposal <br />DAY 2-7: <br />Minor/Emergency Tasks <br />• Verbal Directives <br />• Letter of Instruction <br />• Support Documentation <br />DAY 1-2: <br />On Site Review <br />• Evaluation <br />• Analysis <br />• Data Gathering <br />DAY 2-30: <br />Small Projects <br />• Minimal Design <br />• Sketches <br />• Short Form Specs <br />Osborn Engineering FOLLOW-UP and <br />SUPPORT to City Staff <br />DAY 2 -Depending on Scope: <br />Additions/ Renovations <br />• Full Design/Review Process <br />• Bidding <br />• Construction Administration <br />• Acceptance <br />RESULTS: <br />• Minimum Impact to Ongoing Operations <br />• Value for $$ <br />• Successfully Operating Systems <br />RFQ 20-07-01 CONTINUING PROFESSIONAL CONSULTING SERVICES <br />SECTION C - PAGE 8 <br />