Laserfiche WebLink
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />N NALIF IVA ROI F IN TNI.0 OONTRA(I.T I is WARS FYPFRIFNCF <br />Alireza Shirvani I Construction admin Manager I 11 1 11 <br />M. Hajiar & Associates, Inc <br />KEDUCATION (DEGREEANDSPE <br />B.S. <br />N/A <br />N/A <br />em./ <br />19. RELEVANT PROJECTS <br />STANDARD FORM 330 (REV. 6/2016) PAGE 2 <br />(1) TITLE AND LOCATION (City and State) <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (Irappstable) <br />Treasure Island Elementary School <br />2016 1 <br />2018 <br />(3) BRIEF DESCRIPTION (Brief=Pe, size, cost. etc.) AND SPECIFIC ROLE QCheck If project performed With current firm <br />a <br />Provide engineering services and construction administration for renovations including new windows, <br />new mechanical interior, site work etc. Construction Cost: $1,830,980.00 [Role: Project Manager] <br />(1) TITLE AND LOCATION (Cltyand State) <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (Ifappacable) <br />Coral Terrace Elementary School <br />2015 <br />2017 <br />(3) BRIEF DESCRIPTION (Bdefswps, size, Wsr, etc.) AND SPECIFIC ROLE QCheck if project performed with current firm <br />13 <br />Provide engineering services and construction administration for playground safety surface remodel, renovations and <br />other improvements. Construction Cost: $1,737,567.00 [Role: Project Manager] <br />(1) TITLE AND LOCATION (CRyand Stafe) <br />(2)YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (ifeppscable) <br />Vineland K-8 Center <br />2015 <br />1 2016 <br />(3) BRIEF DESCRIPTION (Brief=pe, size, cost etc.) AND SPECIFIC ROLE QCheck if project performed Wllh current firm <br />C. <br />Provide engineering services and construction administration for renovations including new windows, doors, and <br />minor structural repairs. Construction Cost: $1,216,576.00 (Role: Project Manager] <br />(1) TITLE AND LOCATION (Cityand State) <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (Ifeppscable) <br />Snapper Creek Elementary School <br />2015 <br />2016 <br />(3) BRIEF DESCRIPTION (Briefscope, size, mst ek.)AND SPECIFIC ROLE QCheck If project performed with current firm <br />d <br />Provide engineering services and construction administration for renovations. <br />Construction Cost: $1,710,305.00 [Role: Project Manager] <br />(1)TITLE AND LOCATION (CI'tyand State) <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (Itappscebie) <br />Ruth Owens Kruse Educational Center <br />2014 <br />2015 <br />(3) BRIEF DESCRIPTION (Brie/scope, size, cost, etc)AND SPECIFIC ROLE QCheck If project performed with current firm <br />e. <br />Provide engineering services and construction administration for renovations including new windows, interiors, and <br />site work Construction Cost: $1,003,984.00 [Role: Project Manager] <br />STANDARD FORM 330 (REV. 6/2016) PAGE 2 <br />