Laserfiche WebLink
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />14. TtH t rtK Ntl t <br />Karina Trespalacios I AutoCAD Production 1 20 1 9.5 <br />M. Hallar & Associates, Inc <br />16. EDUCATION (DEGREEAND SPE <br />B.S. Architecture <br />N/A <br />N/A <br />(Publications, Organizations, <br />19. RELEVANT PROJECTS <br />STANDARD FORM 330 (REV. 8/2016) PAGE 2 <br />(1) TITLE AND LOCATION (Cityand State) - <br />(2) YEAR COMPLETED <br />Southside Elementary School <br />PROFESSIONAL SERVICES CONSTRUCTION (1/applicable) <br />2018 1 2019 <br />(3) BRIEF DESCRIPTION (Bdefscops, size, cost, etc.) AND SPECIFIC ROLE Check If project performed with current firm <br />a <br />Provide engineering production services for rehabilitation of historical building including new flooring new ceiling new <br />classrooms new group restrooms, new mechanical & electrical. Cost: $1,157,1 [Role: Engineering Prod.] <br />(1) TITLE AND LOCATION (City and State) <br />(2)YEAR COMPLETED <br />Snapper Creek Elementary School <br />PROFESSIONAL SERVICES CONSTRUCTION (Inapplicable) <br />2015 2017 <br />(3) BRIEF DESCRIPTION (ttofscope, size, cost, etc.) AND SPECIFIC ROLE Check If project performed with current firm <br />b <br />Provide engineering services and construction administration for renovations. <br />Construction Cost: $1,710,305.00 [Role: Engineering Production] <br />(1) TITLE AND LOCATION (City and State) <br />(2)YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (Inapplicable) <br />Ronald W. Regan SHS, GCB <br />2015 <br />2017 <br />(3) BRIEF DESCRIPTION (Briefscope, size, cost etc.)AND SPECIFIC ROLE ©Check if project performed with current firm <br />D <br />Provide engineering/ construction management services for paved play area, marquee, 80 student parking spaces. <br />Security cameras, new computer/science lab, regional & admin. Cost:$1,950,000.00 [Role: Engineering Production] <br />(1) TITLE AND LOCATION (City and State) <br />(2) YEAR COMPLETED <br />Coral Terrace Elementary School <br />PROFESSIONAL SERVICES CONSTRUCTION (Ifapplicabre) <br />2015 2017 <br />(3) BRIEF DESCRIPTION pfofsmpe, size, cost etc.)AND SPECIFIC ROLE ©Check If project performed with current firm <br />cl <br />Provide engineering production services and construction administration for playground safety surface remodel, <br />renovations and other improvements. Construction Cost: $1,737,567.00 [Role: Engineering Production] <br />(1) TITLE AND LOCATION (City and State) <br />(2) YEAR COMPLETED <br />Vineland K-8 Center <br />PROFESSIONAL SERVICES CONSTRUCTION (Itappicab/e) <br />2015 2016 <br />(3) BRIEF DESCRIPTION (Bdefswpe, size, cost etc.) ANO SPECIFIC ROLE Check if project performed with current firm <br />e. <br />Provide engineering production services for renovations including new windows, doors, and, minor structural repairs. <br />Construction Cost: $1,216,576.00 [Role: Engineering Production] <br />STANDARD FORM 330 (REV. 8/2016) PAGE 2 <br />