Laserfiche WebLink
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />u MAUL 13 Pnl F IM Tins rnureerT I.., viceec cvucn,vune <br />Arturo Griego, R.A. <br />G3 AEC Miami Beach, FL <br />B.A. - Bachelor of Architecture <br />M.S - Master of Architecture <br />Specialty Project Architect <br />Florida _ Reg. FL. Architect <br />No. AR94011 <br />Serves on the board of directors for Florida Green Building Coalition. <br />19. RELEVANT PROJECTS <br />IBI <br />STANDARD FORM 330 (REV. 7/2018) PAGE 2 <br />(1) TITLE AND LOCATION (City and State) <br />(2) YEAR COMPLETED <br />Ronald W. Regan - Doral, Florida <br />PROFESSIONAL SERVICES CONSTRUCTION (Itappficable) <br />2015 1 2017 <br />(3) BRIEF DESCRIPTION (8defscope, size, cost, etc.) AND SPECIFIC ROLE Check If project performed with current firm <br />a. <br />Provide architectural services and construction administration for renovations, remodeling and other improvements. <br />Construction Cost: $1,950,000.00 [Role: Project Architect] <br />(1) TITLE AND LOCATION (City and State) <br />(2) YEAR COMPLETED <br />iPrep Math Lab/ Miami, Florida <br />PROFESSIONAL SERVICES CONSTRUCTION (I/appficvb/e) <br />2013 1 2014 <br />b <br />(3) BRIEF DESCRIPTION (Bdetscope, size, cost, etc.)AND SPECIFIC ROLE Check If project performed wllh current firm <br />Provide Architectural services for Brownsville MS, Allapattah MS, Horace Mann MS, Jose De Diego, and North Miami <br />MS. The scope of work was to convert existing classrooms into one large malh classroom. The cost $800,000.00 <br />(1) TITLE AND LOCATION (Ciyand State) <br />(2) YEAR COMPLETED <br />Mar Del Plata Condominiums - Miami, FI <br />PROFESSIONAL SERVICES <br />CONSTRUCTION Ofepph'cable) <br />2012 <br />2015 <br />(3) BRIEF DESCRIPTION (rfafsGGpe, size, cost, etc) AND SPECIFIC ROLE Check If project performed whh current firm <br />C. <br />Provide Architectural services for interior and exterior 20 story high rise condominium. The cost of the project was <br />$4,000,000.00 Role: Project Architect <br />(1) TITLE AND LOCATION (Cltyand State) <br />(2) YEAR COMPLETED <br />26th Plaza -Miami, FL <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (Ilappricable) <br />2011 <br />2013 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cast, etc.) AND SPECIFIC ROLE Check If project performed with current firm <br />d <br />A 12 Story, 350,000 SF residential and retail development with a structured parking garage housing 300 spaces. <br />Role: [Project Architect] <br />(1) TITLE AND LOCATION (City and State) <br />(2) YEAR COMPLETED <br />Mt. Vernon -Miami Beach, Florida <br />PROFESSIONAL SERVICES CONSTRUCTION (Irappricable) <br />2013 2016 <br />(3) BRIEF DESCRIPTION (adafswpe, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />0. <br />A 3 Story, 17,000 SF historic restoration of hotel. Full Architectural & Engineering Design and Construction Documents <br />with Construction Administration Role: (Project Architect] <br />STANDARD FORM 330 (REV. 7/2018) PAGE 2 <br />