My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
M. Hajjar & Associates,INC.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
M. Hajjar & Associates,INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2020 11:13:17 AM
Creation date
8/24/2020 11:09:51 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
116
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STANDARD SECTION "F" <br />EXAMPLE PROJECT KEY <br />NUMBER <br />(Present as many projects as requested by the agency, or 10 projects, if not specified. <br />Complete one Section F for each project.) <br />21. TITLE AND LOCATION (Cintand State) 22. MONTH 8 YEAR COMPLETED <br />Vineland K-8 Center, 8455 SW 1191h St, Miami, FL 33156 PROFESSIONAL SERVICES CONSTRUCTION (nappncable) <br />2014 2015 <br />23. PROJECT OWNER'S INFORMATION <br />a. PROJECT OvMER b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER <br />Miami -Dade County Public School Jul!a IS Hinsey-Pinder 1 (305)9964270 <br />forfhe projecd <br />Our firm prodded A3E services for the remodeling of several buildings including Building 1 (classrooms), Bufldng 2 (classrooms), Building 8 (cafeteria) and Building <br />(media center). This renovation included Painitcoating requiers replacement, Aluminium windows are damaged and requires replacement, Vinyl floor files are <br />damaged and requiers replacement and suspended Ceiling grid is dammaged, needs to be replaced including new files. Construction documents were submitted and <br />project was coordinated from design inception all the way through closeout documents. This included RFI's, submittals, shop drawings, the review and processing of <br />payment applications, site visits and closeout documents. The total construction cost was $1,273,971 <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br />STANDARD FORM 330 (REV. 7-2018) PAGE 3 <br />(1)FIRM NAME <br />(2)FIRMLOCATION (Cityend State) <br />(3)ROLE <br />a. <br />M. Rater a Anwales. Inc. <br />aS VYBaaa An. WX GffiNA R. MIN <br />$I.WB4o.Ap <br />(1) FIRM NAME <br />(2) FIRM LOCATION (City and State) <br />(3)ROLE <br />b. <br />(1)FIRM NAME- <br />(2) FIRM LOCATION (City and State) <br />(3)ROLE <br />C. <br />(1)FIRM NAME <br />(2)FIRMLOCATION (Cityend Sfefe) <br />(3)ROLE <br />d. <br />(1)FIRM NAME <br />(2)FIRMLOCATION (Cityand State) <br />(3)ROLE <br />e. <br />(1)FIRM NAME <br />(2) FIRM LOCATION (City and State) <br />(3)ROLE <br />If. <br />STANDARD FORM 330 (REV. 7-2018) PAGE 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.