ANDRES PEÑALOZA, P.E.
<br />Senior Project Engineer
<br />
<br />Castillo Engineering Inc. | www.castilloeng.com
<br />PROFESSIONAL SUMMARY
<br />Mr. Penaloza has over 10 years of construction engineering experience with D6 and D4.
<br />He has been a key team member on five projects in the last 7 years that have been FTBA
<br />nominated and presented with a FICE award. He has performed in dual roles on several
<br />projects which has equipped him with the tools to perform and exceed in any capacity
<br />required. He has a strong technical background and is known for developing quick analyses
<br />to provide excellent resolution recommendations when presented with unforeseen
<br />conditions. His driven personality, attention to details, and familiarity with federal, state, and
<br />local guidelines have proven to be an asset on every project Mr. Penaloza undertakes.
<br />
<br />PROFESSIONAL EXPERIENCE
<br />07/20 – Present: Project Administrator – FIN: 435855-1-52-01: Park & Ride Facility at
<br />Miramar Blvd and Hiatus Rd – FDOT D4 (Broward County). This $6.6 million project
<br />consists of the construction of a new park & ride facility for the Broward County Mobility
<br />Program. It includes 488 parking spaces, architectural bus shelters, a new surface water
<br />management system, signage, landscaping, and lighting. Reference: FDOT PM: Bodler
<br />Barthelemy, P.E. (954)958-7685 – Bodler.Barthelemy@dot.state.fl.us
<br />
<br />05/19 – 01/20: Project Administrator – FIN: 430813-1: SR. A1A Indian Creek; FIN:
<br />436404-1: SR 934 E 2th St/NW 79th St; FIN: 440191-1 SR 5 (US-1); FIN: 440187-1 SR 7
<br />– FDOT D6 (Miami-Dade County). Total Project(s) combined cost of $5.3 million. four
<br />projects running consecutively. These projects consisted of upgrading the signalization
<br />system throughout the project corridor, reconstruction of intersection & median ramps,
<br />drainage improvements, widening, milling and resurfacing, signing, and lighting upgrades.
<br />Reference: FDOT Assistant Resident Eng: Dru Badri, P.E. (305) 401-1560
<br />
<br />09/18 – Present: Project Administrator – FIN: 428724-1-52-01: S.R. 842 Broward Blvd
<br />Bridge Over North Fork River – FDOT D4 (Broward County). This $16.2 million project
<br />consists of the total replacement of the existing bridge. Milling and resurfacing, drainage,
<br />signalization, ITS, lighting, signing, sidewalk, and a Joint Project Agreement (JPA) for the
<br />relocation of the existing water main. Reference: FDOT PM: David Schweiger, P.E. (954)
<br />734-3539 - david.schweiger@dot.state.fl.us.
<br />
<br />8/15 – 4/18: Project Administrator/Contract Support Specialist – FIN: 430192-1-52-01:
<br />Ravenswood Road Bridge No. 864028 – FDOT D4 (Broward County). This $4.8 million
<br />project consisted of replacing the existing bridge. Drainage, MSE wall, signing, sidewalk,
<br />fender system replacement, dredging and new subaqueous crossings for the relocation of
<br />existing water and sewer utilities under the Canal. Reference: FDOT PM: Angela Foreman,
<br />P.E. (954) 931-6179 – Angela.Foreman@dot.state.fl.us
<br />
<br />9/13 – 8/15: Contract Support Specialist/Sr. Roadway Inspector – FIN: 422866-1-52-
<br />01: SR. 838/Sunrise Blvd. Bridge No. 860669 – FDOT D4 (Broward County). This $9.5
<br />million project consisted of replacing the existing bridge. Signalization, drainage, milling and resurfacing, lighting, signing, construction of
<br />new sidewalk, and landscaping. Reference: Same as project above.
<br />
<br />6/13 – 9/13: Contract Support Specialist Assistant – FIN: 421707-6-52-01: I-75 Express Lanes Segment E – FDOT D4 (Broward
<br />County). This $75 million Design-Build (D/B), Lump Sum project consists of the construction of the I-75 Express Lanes within the existing
<br />median and connect to the I-595 Express lanes with a high level bridge. Sound barrier walls, drainage, MSE wall, Toll/ITS, traf fic
<br />monitoring sites, lighting, signing, and landscaping. Reference: FDOT PM: Antonio Castro, P.E. - Antonio.Castro@dot.state.fl.us
<br />
<br />3/13 – 6/13: Inspector – FIN: 433688-5-G5-01: SR. A1A Emergency Restoration (NE 14th Ct and NE 18th St) – FDOT D4 (Broward
<br />County).This $8 million project consisted of the restoration of SR. A1A after super storm Sandy caused coastal flooding in the southe ast
<br />Florida region. Reference: FDOT PM: Hewrald Humes, P.E. (954) 734-3827 – Hewrald.Humes@dot.state.fl.us
<br />
<br />2/12 – 3/13: Inspector - FIN: 419015-1-52-01 et al: 17 St Causeway Bascule Bridge Rehab.; SR A1A Flamingo to Oakland Park;
<br />SR 84 from MP 16 to SW 26 Terr.; A1A Cordova Rd to Eisenhower Blvd. – FDOT D4 (Broward County). $5.9 million. Four projects
<br />running consecutively consisting of drainage, milling, resurfacing, signalization, sidewalk improvements, landscape, irrigati on, guardrail,
<br />signing, rehabilitation of bascule bridge elements such as handrail, lighting, concrete barrier wall, painting/pressure cleaning.
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />EDUCATION
<br />BS, Civil Engineering, Tennessee
<br />Technological University, 2010
<br />
<br />EXPERIENCE
<br />10+ Years
<br />
<br />REGISTRATIONS / CERTIFICATIONS
<br />▪ Professional Engineer, FL #80349
<br />▪ CTQP Asphalt Paving Tech I & II
<br />▪ CTQP Earthwork Inspection I & II
<br />▪ CTQP Final Estimates I & II
<br />▪ CTQP Concrete Field Tech I
<br />▪ CTQP Drilled Shaft Inspector
<br />▪ CTQP QC Manager
<br />▪ FDOT Advanced MOT
<br />▪ FDOT Critical Struc. Const. Issues
<br />▪ FDOT Auger Cast Pile Inspection
<br />▪ FDOT MSE Wall Inspection
<br />▪ Radiation Safety Officer (RSO)
<br />▪ Nuclear Gauge Safety
<br />▪ ACI Concrete Field Tech I
<br />▪ NPDES Stormwater Mgmt Inspection
<br />▪ IMSA Traffic Signal Tech I
<br />▪ IMSA Fiber Optic Technician
<br />▪ 10 Hr OSHA (ID: 20-002954861)
<br />TIN #: P542-006-88-412-0
|