My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CE Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
CE Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2020 11:21:20 AM
Creation date
8/24/2020 11:18:22 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
107
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
VICTOR DIAZ, P.E. <br />Senior Project Engineer <br /> <br />Castillo Engineering Inc. | www.castilloeng.com <br />PROFESSIONAL SUMMARY <br />Mr. Diaz has more than 13 years of heavy construction and project engineering experience. <br />He is very familiar with FDOT construction administration policies, procedures, computer <br />applications. Victor’s experience includes performing advanced engineering work on <br />multiple mid-size to major projects of moderate complexity, schedule and manage <br />subordinate staff assigned to respective projects for satisfactory job performance ensuring <br />their compliance with the client’s policies and procedures, as well as providing on-site <br />engineering design and construction support in resolving project related problems. He is a <br />natural leader and has an excellent track record on all projects he has undertaken. <br /> <br />PROFESSIONAL EXPERIENCE <br />01/20 – Present: Project Administrator – FIN: 427369-1-52-01 et al: SR 997/Krome Ave <br />from SW 32 St to SW 296th St and from SW 296 St to S of 232nd St – FDOT 6 (Miami- <br />Dade County). This $35.5 million project consists of adding lanes and pavement <br />rehabilitation along SR 997/Krome Ave from SW 312 Street/Campbell Drive to SW 296 St. <br />As well as the reconstruction and addition of lanes from SW 296 Street to S of SW 232 St. <br />Additional improvements include the reconstruction of 5 existing signalized intersections, a <br />new signalized intersection at SW 272 St and Krome Ave, the construction of two new <br />bridges over C-103 Canal, the demolition of an existing bridge. <br />Reference: FDOT Project Manager: Jonathan Fundora, P.E. - (305) 640-7417 – <br />Jonathan.Fundora@dot.state.fl.us <br /> <br />08/17 – 12/19: Construction Project Manager - FIN: 423372-2-52-01 et al: Widening of <br />the Homestead Extension of Florida's Turnpike (HEFT) from SW 288th /St to SR <br />836/Dolphin Expy (Miami-Dade County). This $550 million Design/Build projects will <br />improve capacity and operation, add ramp lanes and incorporate Express Lanes on 15 <br />miles of the HEFT. Reference: Assistant District Construction Engineer: William Sears P.E. <br />– (954) 934-1115 – William.Sears@dot.state.fl.us <br /> <br />04/17 – 08/17: Project Oversite I – SR 826 / Palmetto Expressway – FDOT D6 (Miami- <br />Dade County). This $1.8 million project consists of milling & resurfacing along SR 933/SW- <br />NW 12th Avenue from north of SW 13th Street to NW 20th Street, construction of new light <br />poles within the corridor and intersection improvement along SR 933/SW-NW 12th Avenue <br />from SW 3rd Street to NW 12th Street. Reference: FDOT Project Manager: Hector Fung, <br />P.E. - (305) 640- 7456 – Hector.Fung@dot.state.us.fl <br /> <br />03/17 – 08/17: Project Oversite I – SR 826 / Palmetto Expressway - FDOT D6 (Miami- <br />Dade County). This $1.5 million landscaping project consists of installation of new <br />landscape (large trees and palms) at SR 826 / Palmetto Expressway / from south of SW <br />2nd Street to NW 14th Street. Reference: Same as project above. <br /> <br />08/16 – 02/17: Project Oversite I – SR 90 / US-41 / Tamiami Trail (FTBA Rural Project <br />of the Year) - FDOT D6 (Miami-Dade County). This $4 million project consists of primarily <br />milling and resurfacing SR 90 / US 41/ Tamiami Trail from 11.8 Miles West of Krome Avenue (MP 13.868) to West of Loop RD (MP <br />3.926), guardrail resetting, turnout construction and rehabilitation of existing bridge deck expansion joint on four (4) exis ting bridges <br />located within the project limits. Reference: Same as project above. <br /> <br />01/16 – 08/16: Project Oversite I – SR 826 / Palmetto Expressway - FDOT D6 (Miami-Dade County). This $3.8 million project consists <br />of primarily milling and resurfacing SR 826, new landscaping installation and bridge joints rehabilitation on Palmetto Exp ressway from <br />South Dixie Highway to North of SR 878/Snapper Creek Expressway and SR 826 (Palmetto Expressway) from North of SR 878 Snapper <br />Creek Expressway to North of SR 986/Sunset Drive. Reference: Same as project above. <br /> <br />March 2015 – March 2016: Project Oversite I – SR 25 / NW 36 Street – District VI – Miami-Dade County. <br />This $1.8 million project consists primarily milling and resurfacing, upgrading signalization, construct sidewalk and ADA imp rovements <br />along the corridor. Reference: FDOT Project Manager: Andres Berisiartu, P.E. - (305) 640-7433 – Andres.Berisiartu@dot.state.fl.us <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />EDUCATION <br />BS, Civil Engineering, Florida <br />International University, 2013 <br /> <br />EXPERIENCE <br />13+ Years <br /> <br />REGISTRATIONS / CERTIFICATIONS <br />▪ Professional Engineer, FL #84171 <br />▪ CTQP QC Manager <br />▪ CTQP Asphalt Paving Tech I & II <br />▪ CTQP Earthwork Inspection I & II <br />▪ CTQP Final Estimates I & II <br />▪ CTQP Concrete Field Tech I <br />▪ CTQP Drilled Shaft Inspector <br />▪ FDOT Advanced MOT <br />▪ FDOT Critical Struc. Const. Issues <br />▪ FDOT Auger Cast Pile Inspection <br />▪ FDOT MSE Wall Inspection <br />▪ Nuclear Gauge Safety <br />▪ ACI Concrete Field Tech I <br /> <br />TIN #: D252-873-81-230-0 <br /> <br />SKILLS & AFFILIATIONS <br />Proficient in Site Manager, PTS, MAC, <br />Bluebeam Revu, Microsoft Office <br />Software, AutoCAD, basic MicroStation, <br />basic Primavera P6, and SharePoint. <br />Easily familiarized with new software.
The URL can be used to link to this page
Your browser does not support the video tag.