|
BANAFSHEH HOSSEINI, P.E.
<br />Project Administrator / Contract Support Specialist
<br />
<br />Castillo Engineering Inc. | www.castilloeng.com
<br />PROFESSIONAL SUMMARY
<br />Ms. Hosseini is a Professional Engineer with more than eight years of construction
<br />experience. As a Contract Support Specialist on numerous design-bid-build and design-
<br />build projects, she has acquired extensive knowledge in construction administration policies
<br />and procedures. Her experience, ranges from the preparation of monthly and final
<br />estimates, managing and updating the Materials Acceptance and Certification System,
<br />processing work orders and supplemental agreements, coordinating/tracking RFI’s and
<br />shop drawings, and preparing documents for final estimates. Bana has an excellent track
<br />record and has gotten recognition for her excellent project closeouts.
<br />
<br />PROFESSIONAL EXPERIENCE
<br />06/19 – Present: Contract Support Specialist – FIN: 437731-1-52-01 et al - SR
<br />817/University Drive from N. of NW 57th Street to Sunrise Lakes Blvd.; SR
<br />816/Oakland Park Blvd. from SR University Drive to SR 5/US 1 – FDOT District IV
<br />(Broward County). This $6.8 million project consists of milling and resurfacing, widening,
<br />drainage improvements, pedestrian lighting improvements, bicycle lanes, signalization,
<br />signage, pavement marking and ADA improvements within the project limits. Bus shelters
<br />and signalization improvements along Oakland Park Boulevard will prioritize transit from
<br />University Drive to US-1. Responsibilities include ensuring compliance with specifications,
<br />certification packages, and as-built plans, preparing and running monthly estimates,
<br />preparing and maintaining accurate back up documentation for the submittal of the final
<br />estimate package, tracking material submittals, managing and updating MAC, generating
<br />and processing work orders and supplemental agreements, coordinating/tracking RFI’s and
<br />shop drawings. Reference: FDOT Project Manager: Matthew May, E.I. - (954) 940-7519 –
<br />Matthew.May@dot.state.fl.us
<br />
<br />02/17 – 06/20: Contract Support Specialist – FIN: 427937-1-52-01 / 427937-1-52-02 /
<br />427937-2-52-01 / 427937-2-52-02 / 427938-1-52-01 - SR 7 RRR Grouping Projects from
<br />Commercial Boulevard to SR-808 (Glades Road). – FDOT District IV (Broward
<br />County). This $20.1 million project includes the improvements of 12.4 miles of SR 7 in
<br />Broward County through the Cities of Coral Springs, Coconut Creek and Parkland. The project scope entails milling and resurfa cing,
<br />upgrading pedestrian features including 10-foot sidewalks on both sides and detectable warning surfaces at crosswalks, installing
<br />overhead sign structures, upgrading signs and pavement markings to include a 7 -foot bike lane in each direction, installing new bus
<br />shelters with bicycle racks, trash receptacles, and benches, upgrading the drainage system, signalization system including pedestrian
<br />signals and detectors and vehicle video detection, and roadway lighting. Responsibilities same as project above. Reference: FDOT
<br />Project Manager – Donald Van Whervin, P.E. - (954) 958-7654 – Donald.Vanwhervin@dot.state.fl.us
<br />
<br />09/13 – 02/17: Contract Support Specialist – FIN: 421707-6-52-01 – SR 93 / I-75 Express Managed Lanes Segment E from the I-
<br />595 Interchange to North of Griffin Road – FDOT District IV (Broward County). This $75 million Design-Build (D/B), Lump Sum
<br />project consisted of the construction of the I-75 Express Lanes improvements within the existing median. In addition, the I -75 Express
<br />lanes will connect to the I-595 Express lanes with a two-lane high level bridge, designed and constructed for reversible travel. The project
<br />also includes ground-mounted sound barrier walls, environmental/building permit acquisition, new drainage system installation, MSE
<br />wall, Toll/ITS system, permanent traffic monitoring sites, lighting, signing, and landscaping. Responsibilities included the preparation and
<br />review of monthly estimates and other documents such as: field books, site manager dailies, sample entry in LIMS/MAC, asphalt reports
<br />both QC and VT, pile driving logs, as-built records, supplemental agreements and work orders. In addition, prepared and maintained
<br />accurate back up documentation for the submittal of the final estimate package. Reference: FDOT Project Manager - Antonio Castro,
<br />P.E. - (954) 448-2905 - Antonio.Castro@dot.state.fl.us
<br />
<br />04/12 – 09/13: Field Engineer – All State Engineering & Testing Consultants, Inc. (Miami-Dade County). Directed the soil
<br />subsurface investigation, evaluated foundation alternatives, prepared geotechnical reports for several residential and commercial
<br />developments. performed laboratory and field material testing (concrete slump, concrete compressive strength, soil classification, LBR,
<br />Proctor, soil field density testing), inspected auger cast piles, helical pile, soil boring test, structural steel, roof light weight uplift test (TAS-
<br />105), post tensioning on numerous multistory buildings. Reference: President - Waseem Quadri, P.E. - (305) 888-3373
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />EDUCATION
<br />BS, Civil Engineering, Florida
<br />International University, 2012
<br />
<br />EXPERIENCE
<br />8+ Years
<br />
<br />REGISTRATIONS / CERTIFICATIONS
<br />▪ Professional Engineer, FL #87327
<br />▪ CTQP Final Estimates I & II
<br />▪ FDOT Advanced MOT
<br />TIN #: H250-060-83-601-0
<br />
<br />SKILLS & AFFILIATIONS
<br />▪ American Society of Civil Engineers
<br />▪ Engineers Without Borders
<br />▪ Institute of Transportation Engineers
|