|
ALEXANDER VASQUEZ, P.E.
<br />Project Administrator / Contract Support Specialist
<br />
<br />Castillo Engineering Inc. | www.castilloeng.com
<br />PROFESSIONAL SUMMARY
<br />Mr. Vasquez is a Professional Engineer with over 9 years of experience in various areas of
<br />construction including, construction site inspection and management, plans reviews,
<br />estimating, field-testing, which include pile driving monitoring, drilled shaft inspection,
<br />density testing, concrete testing, plans reading, and asphalt monitoring. He is fully certified
<br />and has practiced multiple testing methods including the Troxler density gauge, concrete
<br />slump cone, roller meter and cylindrical specimens. Alexander has strong leadership and
<br />technical skills which has which has equipped him with the tools to perform and exceed in
<br />any capacity required. He has been praised by our clients for his attention to detail and for
<br />providing excellent resolution recommendations when presented with unfores een
<br />conditions.
<br />
<br />PROFESSIONAL EXPERIENCE
<br />08/19 – Present: Sr. Roadway Inspector – FIN: 436303-1-52-01: SR 9/I-95 at SR
<br />824/Pembroke Road Interchange Improvements Project – FDOT D4 (Broward
<br />County). This $1.5 million project improvements consisted of widening the I-95 off ramps
<br />at Pembroke Road to accommodate an additional right turn lane; shoulder widening of the
<br />I-95 on ramps at Pembroke Road; upgrading the existing traffic signals at the intersections
<br />of Pembroke Road and the I-95 off ramps; upgrading the existing lighting along the I-95 on
<br />and off ramps at Pembroke Road to LED lighting; reconstructing the sidewalks and
<br />pedestrian crossings at the I-95 off ramps and the I-95 northbound on ramp at Pembroke
<br />Road; and milling and resurfacing within the project limits. Reference: FDOT PM: Erik
<br />Nemati, P.E. (954) 299-6441 – Erik.Nemati@dot.state.fl.us
<br />
<br />03/16 – 07/19: Sr. Roadway Inspector – Project No. 83628: Reconstruction of SR
<br />836/Dolphin Expressway from NW 57th Avenue to NW 17th Avenue - Miami-Dade
<br />Expressway Authority. This $150 million project increased capacity and improved safety
<br />on 4.4 miles of SR 836/Dolphin Expressway from just west of NW 57th Avenue to NW 17th
<br />Avenue. Portions of the expressway were widened to add a lane in each direction, including
<br />the widening of 6 bridges plus construction of 4 new bridges and interchanges were
<br />reconstructed to improve traffic flow for drivers entering and exiting the expressway. The
<br />intersections at NW 57th Avenue and NW 27th Avenue were completely reconstructed with
<br />an innovative traffic solution called Diverging Diamond Interchange to improve access to
<br />the surrounding areas. The left lane exits to Miami international Airport at NW 42nd Avenue
<br />was eliminated and replaced with new right lane exits that improved improve traffic flow.
<br />Reference: MDX PM: Sergio Besu – (305) 553-8094 – Sbesu@eacconsult.com
<br />
<br />10/15 – 03/16: Roadway Inspector – FIN: 415488-1-52-01: Widening of the Homestead
<br />Extension of Florida’s Turnpike (HEFT) from SW 216th Street to Eureka Drive - Florida’s Turnpike (Miami-Dade County). This $41
<br />million project included widening of 4 roadway miles of the Turnpike, 5 bridge widenings and construction of one new bridge over the C-
<br />1 Canal, milling and resurfacing, MSE walls, sound walls, installation of new drainage systems, overhead signs, ITS structure s, curb &
<br />gutter, sidewalk, ADA ramp construction, earthwork operations and testing, erosion control, Maintenance of Traffic, bridge work such as
<br />pile driving, footings, columns, pier cap construction, beam installation, bridge deck reinforcing steel inspection and concrete placement,
<br />signalization, lighting and landscaping. Reference: Senior Project Engineer – Elizabeth Jett, PE – (305) 951-0015 4324 –
<br />ejett@americanenggroup.com
<br />
<br />07/11 – 10/15: Project Manager/Application Engineer – Aservin Export LLC, Miami, Florida.
<br />Municipal water/wastewater treatment and petroleum industry projects. Responsibilities include assisting with the design and
<br />development of engineering system packages for wastewater treatment plants/facilities and oil drilling projects. Providing e ngineering
<br />support for the application and sales of equipment/products. Conducting on-site system evaluations/inspections to ensure products meet
<br />the project requirements and specifications. Reviewing engineering drawings/details and specifications; ensuring selected equipment
<br />meets codes, plans and contract documents, and guidelines such as the API (American Petroleum Institute), ISO (International
<br />Organization for Standardization), GAGI (Compressed Air & Gas Institute). Work with manufacturers/suppliers to provide techn ical
<br />support to customers/clients to resolve technical issues, as needed. Reference: Director – Irene Tribin – (305) 883-4324 –
<br />Irene.Tribin@aservin.com
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />EDUCATION
<br />BS, Civil Engineering, Florida
<br />International University, 2009
<br />
<br />EXPERIENCE
<br />9+ Years
<br />
<br />REGISTRATIONS / CERTIFICATIONS
<br />▪ Professional Engineer, FL #88521
<br />▪ CTQP Asphalt Paving Tech I & II
<br />▪ CTQP Earthwork Inspection I & II
<br />▪ CTQP Final Estimates I
<br />▪ CTQP Concrete Field Tech I & II
<br />▪ CTQP Drilled Shaft Inspector
<br />▪ CTQP Pile Driving Inspector
<br />▪ FDOT Advanced MOT
<br />▪ FDOT Critical Struc. Const. Issues
<br />▪ FDOT Auger Cast Pile Inspection
<br />▪ FDOT MSE Wall Inspection
<br />▪ Nuclear Gauge Safety
<br />▪ ACI Concrete Field Tech I & II
<br />▪ NPDES Stormwater Mgmt Inspection
<br />▪ IMSA Traffic Signal Inspector I
<br />▪ IMSA Fiber Optic Technician
<br />TIN #: V220-016-82-024-0
|