<br />PROFESSIONAL SUMMARY
<br />Mr. Hernandez has over 11 years of experience in various areas of construction field-
<br />testing, which include pile driving monitoring, drilled shaft inspection, density testing,
<br />concrete testing, plans reading, asphalt monitoring, site inspection, roadway, earthwork
<br />movement, and quality control. He has excellent communication skills and is fully certified.
<br />Omar is a natural leader and has a reputation for building trust with crews through clear,
<br />honest, and direct communication. He has proven his ability to handle multiple assignments
<br />with varying day and night work hours.
<br />
<br />PROFESSIONAL EXPERIENCE
<br />01/20 – 07/20: Senior Inspector – FIN: 437708-1-52-01: Sunrise boulevard from NW
<br />15th Avenue to N Flagler Drive – FDOT D4 (Broward County). This project consists of
<br />milling and resurfacing, ADA improvements, new mast arm, new drainage, new lighting,
<br />signalization upgrades, and new signage. Reference: FDOT Project Administrator:
<br />Woodler Blaise – (954) 958-7641 – Woodler.Blaise@dot.state.fl.us
<br />
<br />04/19 – 12/19: Senior Inspector – FIN: 429193-2-52-01: Reconstruction and Safety
<br />Improvements along SR 907/Alton Road at Michigan Avenue in the City of Miami
<br />Beach – FDOT D6 (Miami-Dade County). This $1.5 million project consists of widening
<br />the roadway to accommodate a second southbound left-turn lane at the intersection of Alton
<br />Road and Michigan Avenue, upgrading drainage system, landscaping, landscaping, milling
<br />and resurfacing, pavement markings, upgrading pedestrian curb ramps and sidewalk,
<br />signalization upgrades, and lighting. Reference: FDOT Project Administrator: Franche
<br />Perdomo - (786) 447-4295 – Franche.Perdomo@dot.state.fl.us
<br />
<br />10/16 – 04/19: Senior Inspector – FIN: 428724-1-52-01: Reconstruction of SR
<br />842/Broward Boulevard from 18th Avenue to US- 1 – FDOT D4 (Broward County). This
<br />$16.0 million project consists of replacing the existing bridge over the North Fork of the New
<br />River, widening the roadway to add bike lanes in each direction, signalization upgrades,
<br />drainage improvements, milling and resurfacing, lighting, signing and pavement markings,
<br />upgrading curb ramps and sidewalk, relocating bus shelters, coordination and supervision
<br />of an extensive amount of utility relocation work. Reference: FDOT PM: David Schweiger,
<br />P.E. - (954) 734-3539 – David.Schweige@dot.state.fl.us
<br />
<br />08/15 – 10/16: Senior Inspector – FIN: 422866-1-52-01: Reconstruction of SR
<br />838/Sunrise Boulevard Bridge No.860669 over Middle River – FDOT D4 (Broward
<br />County). This $9.5 million project consisted of replacing the existing bridge that crosses
<br />over Middle River, including the construction of a temporary prefab bridge, signalization
<br />upgrade, drainage improvements, milling and resurfacing, lighting, signing and pavement
<br />markings, sidewalk, landscaping. Reference: FDOT PM: Angela Foreman, P.E. - (954)
<br />931-6179 - Angela.Foreman@dot.state.fl.us
<br />
<br />06/14 – 08/15: Senior Inspector – Construction of a New Taxi Way at Fort Lauderdale International Airport – Broward County
<br />Aviation Department. This $25 million project consisted of the installation of new drainage system, road reconstruction and widening,
<br />construction of the new Taxi Way, expansion of Fort Lauderdale International Airport. Reference: Field Operations Manager: Jorge
<br />Herrera – (305) 343-7579
<br />
<br />05/11 – 06/14: Inspector - I 595 Express Corridor Improvement P3 Project – FDOT D4 (Broward County) This $1.3 billion project
<br />consisted of roadway inspections along the 10 miles corridor of I-595 installation of drainage system, construction of MSE walls, auger
<br />cast piles, sound walls, micro-tunneling, utility relocations, inspection of maintenance of traffic, drilled shafts, pile driving, asphalt paving,
<br />lighting and landscaping. Reference: Project Manager: Edward Tufo – (305) 384-0524
<br />
<br />03/10 – 05/11: Senior Quality Assurance (QA) Inspector - Port of Miami – Reconstruction of Seaboard Marine Cargo Terminal
<br />(Miami-Dade County). This $15 million project consisted of the reconstruction of the Seaboard Marine Cargo Terminal including drainage
<br />installation, asphalt paving, installation of drill shafts, new lighting system, and retaining wall system. Reference: Project Manager -
<br />Melvinsky Ramirez – (909) 838-3003
<br />
<br />09/09 – 03/10: Senior QA Inspector – Construction of Auxiliary Lane on SR 836 between NW 57th Ave and NW 42nd Ave – MDX
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />EDUCATION
<br />AS, Civil Engineering, Seneca College
<br />of Applied Arts and Technology, 2003
<br />
<br />EXPERIENCE
<br />11+ Years
<br />
<br />REGISTRATIONS / CERTIFICATIONS
<br />▪ 40 Hour OSHA Training Course
<br />▪ CTQP Quality Control Manager
<br />▪ CTQP Asphalt Plant Tech I
<br />▪ CTQP Asphalt Paving Tech I & II
<br />▪ CTQP Earthwork Inspection I & II
<br />▪ CTQP Final Estimates I & II
<br />▪ CTQP Concrete Field Tech I & II
<br />▪ CTQP Drilled Shaft Inspector
<br />▪ CTQP Pile Driving Inspector
<br />▪ FDOT Advanced MOT
<br />▪ FDOT Critical Struc. Const. Issues
<br />▪ FDOT Auger Cast Pile Inspection
<br />▪ FDOT MSE Wall Inspection
<br />▪ Nuclear Gauge Safety
<br />▪ ACI Concrete Field Tech I & II
<br />▪ NPDES Stormwater Mgmt Inspection
<br />▪ IMSA Traffic Signal Inspector I