|
JAVIER VEGA
<br />Senior Inspector
<br />
<br />Castillo Engineering Inc. | www.castilloeng.com
<br />PROFESSIONAL SUMMARY
<br />Mr. Vega has over 13 years of experience in in various areas of construction field -testing,
<br />which include pile driving monitoring, drilled shaft inspection, density testing, concrete
<br />testing, plans reading, asphalt monitoring, site inspection, roadway, and earthwork
<br />movement. He is fully certified and has practiced multiple testing methods including the
<br />Troxler density gauge, concrete slump cone, roller meter and cylindrical specimens. Javier
<br />has a reputation for building trust with crews through clear, honest, and direct
<br />communication.
<br />
<br />PROFESSIONAL EXPERIENCE
<br />06/19 – Present: Senior Roadway Inspector – FIN: 437731-1-52-01 et al – SR
<br />817/University Drive from N. of NW 57th Street to Sunrise Lakes Blvd – FDOT D4
<br />(Broward County). This $6.8 million project consists of milling and resurfacing, widening,
<br />drainage improvements, pedestrian lighting improvements, bicycle lanes, signalization,
<br />signage, pavement marking and ADA improvements within the project limits. Bus shelters
<br />and signalization improvements along Oakland Park Boulevard will prioritize transit from
<br />University Drive to US-1. Reference: FDOT PM: Matthew May, E.I. (954) 940-7519 –
<br />Matthew.May@dot.state.fl.us
<br />
<br />06/17 – Present: Sr. Roadway Inspector – FIN: 427937-152-01: SR 7 Improvement
<br />Projects from Commercial Blvd to Broward/Palm Beach County Line (FDOT D4). This
<br />$13 million project includes the improvements of 9.8 miles of SR 7 in Broward County. It
<br />includes milling and resurfacing, 10-foot sidewalks on both sides, overhead sign structures,
<br />upgrading signs, pavement markings, a 7-foot bike lane in each direction, new bus shelters,
<br />drainage, signalization, and upgrading the roadway lighting. Reference: FDOT PM: Donald
<br />Van Whervin P.E. (954) 958-7654 - Donald.Vanwhervin@dot.state.fl.us
<br />
<br />04/14 – 06/17: Roadway Inspector – FIN: 412420-3-52-01: Reconstruction of I-95 from
<br />North of Glades Road to Congress Ave in Palm Beach County (FDOT D4). This $70
<br />million Design/Build project includes constructing a new interchange at Spanish River
<br />Boulevard and I-95, widening Spanish River Boulevard west of FAU Boulevard,
<br />constructing 13 bridges between Spanish River Boulevard and Yamato Road; signalized
<br />intersection improvements; addition of auxiliary lanes on Yamato Road; and sound wall
<br />construction. Reference: FDOT PM: Kevin Micocci P.E. (561) 370-1146
<br />
<br />06/11 – 03/14: Roadway Inspector – Reconstruction and Widening of SR 70 in St Lucie
<br />County from St. Lucie /Okeechobee County Line to MP 5.871 (FDOT D4). This $20
<br />million project consisted of constructing a new canal, wetland mitigation, drainage
<br />improvements, reconstruction and widening from a two-lane undivided road to a four-lane divided highway, milling and resurfacing, new
<br />ADA ramps and sidewalk upgrades, curb and gutters, signing and pavement markings, signalization upgrades. Reference: FDOT PM:
<br />Chloann Lawrence (772) 429-4866
<br />
<br />10/12 – 09/13: Roadway Inspector – Milling and Resurfacing of SR 5 / A1A in St Lucie County from Round Island Park to E
<br />Causeway Blvd (FDOT D4). This $8 million project consisted of milling and resurfacing of 8 miles of A1A, signing and pavement marking.
<br />Reference: FDOT PM: Joshua Baker (772) 429-4930 – Joshua.Baker@dot.state.fl.us
<br />
<br />05/10 – 06/11: Roadway Inspector – Infrastructure Modification for Open Road Tolling of SR 874, SR 878 & SR 924 (MDX). This
<br />$21 million Design/Build project consisted of the construction of Open Road Tolling (ORT) infrastructure modification for thr ee MDX
<br />Corridors (Don Shula Expressway, Snapper Creek Expressway and Gratigny Parkway). New gantries and tolling buildings, roadway
<br />reconstruction and widening, milling and resurfacing, signing and pavement markings, lighting improvements and removal of the existing
<br />tolling facilities. Reference: MDX PM: Sergio Besu (305) 553-8094 – Sbesu@eacconsult.com
<br />
<br />08/08 – 05/10: Bridge/Roadway Inspector - Bridge Deck Replacements and Roadway Reconstruction of SR-25 / US 27 in Palm
<br />Beach County (FDOT D4). This $22 million project consisted of the demolition and reconstruction of two low level concrete bridge
<br />decks, road widening, milling and resurfacing of 22.5 miles, signing and pavement markings, landscaping, and dredging of the Miami
<br />Canal. Reference: FDOT PM: Jacques Beaubrum (561) 719-7812 – Jacques.Beaubrum@dot.state.fl.us
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />EDUCATION
<br />▪ BS, Social Science, Las Villas Central
<br />University - Cuba, 1996
<br />▪ Building Construction Degree, Palm
<br />Beach Community College, 2010
<br />
<br />EXPERIENCE
<br />13+ Years
<br />
<br />REGISTRATIONS / CERTIFICATIONS
<br />▪ CTQP Asphalt Paving Tech I & II
<br />▪ CTQP Earthwork Inspection I & II
<br />▪ CTQP Final Estimates I
<br />▪ CTQP Concrete Field Tech I
<br />▪ CTQP Drilled Shaft Inspector
<br />▪ FDOT Advanced MOT
<br />▪ FDOT Critical Struc. Const. Issues
<br />▪ FDOT Auger Cast Pile Inspection
<br />▪ FDOT MSE Wall Inspection
<br />▪ Nuclear Gauge Safety
<br />▪ ACI Concrete Field Tech I
<br />▪ NPDES Stormwater Mgmt Inspection
<br />▪ IMSA Traffic Signal Inspector I
<br />TIN #: V200-436-72-416-0
|