Laserfiche WebLink
TANIA GIMENEZ <br />Inspector <br /> <br />Castillo Engineering Inc. | www.castilloeng.com <br />PROFESSIONAL SUMMARY <br />Ms. Gimenez has over five years of construction experience working in roadway and bridge <br />projects and coordinating inspection activities. Tania has vast material sampling and testing <br />experience, as well as extensive communication and computer skills. She is detailed <br />oriented, fully certified, and has practiced multiple testing methods including the Troxler <br />density gauge, concrete slump cone, roller meter and cylindrical specimens. <br /> <br />PROFESSIONAL EXPERIENCE <br />07/19 – 07/20: Roadway Inspector – SR 7/US 441 Pedestrian Safety Enhancement <br />Project from NW 29th Street to N of SR 816/Oakland Park Blvd – FDOT D4 (Broward <br />County). This project consists of constructing a pedestrian safety barrier along the existing <br />median, constructing a ten-foot shared-use path along SR 7, minor road widening, milling <br />and resurfacing, upgrading crosswalks, installing landscaping and irrigation in the median, <br />and installing crosswalk curb ramps. Responsibilities included handling and coordinating <br />construction activities with the contractor, inspection and documentation of daily activities, <br />ensuring underground and roadway construction is completed in accordance with the <br />specifications, ensuring compliance with approved MOT plans and ADA, updating and <br />tracking materials for final material certification, maintain accurate back up documentation <br />for the submittal of quantities, assisting with the preparation of final estimate package, and <br />updating as-built records. Reference: FDOT Project Manager – Erik Nemati, P.E. - (954) <br />958-7671 – Erik.Nemati@dot.state.fl.us <br /> <br />08/18 – 06/19: Roadway Inspector – SR 953/LeJeune Road Safety Improvement <br />Project from SW 2nd Street to NW 11th Street – FDOT D6 (Miami-Dade County). This <br />project included intersection improvements at Flagler Street, NW 3rd Street and NW 7th <br />Street including minor road widening, milling and resurfacing, new pavement markings, <br />drainage improvements, new signalization, new lighting system, detectable warning <br />surfaces at crosswalks, extensive sidewalk and ADA ramp replacement, curb and gutter <br />replacement, traffic separators, adjusting utility tops along roadway and sidewalks. <br />Responsibilities same as project above. Reference: FDOT Project Manager – Lazaro <br />Mesa, E.I. - (305) 401-1438 – Lazaro.Mesa@dot.state.fl.us <br /> <br />12/17 – 08/18: Roadway Inspector – SR 90/SW 7th Street Safety Improvement Project <br />from SW 25th Avenue to Brickell Avenue – FDOT District VI (Miami-Dade County). This <br />project included milling and resurfacing, new pavement markings at various locations along <br />SW 7th Street, upgrading pedestrian features including pedestrian countdown signals, detectable warning surfaces at crosswalks, <br />extensive sidewalk and ADA ramp replacement, curb replacement, adjusting utility tops along roadway and sidewalks. Responsibilities <br />same as project above. Reference: FDOT Project Manager – Juan Hitchman - (786) 219-8257 – Juan.Hitchman@dot.state.fl.us <br /> <br />09/17 – 12/17: Roadway Inspector – Hurricane Irma Pre-Event Natural Disaster Monitoring/Construction Engineering & <br />Inspection – FDOT D6 (Miami-Dade County). Responsible for inspecting and documenting debris removal, repair and replacement of <br />signs, roadway lighting, signalization and erosion control, cleaning of drainage system throughout numerous areas in Miami Dade County. <br />Preparing daily work reports, tracking quantities as well as time and material records, reviewing invoice requisitions from the Contractors. <br />Reference: Benjamin Sotomayor – CEI Project Administrator (786) 295-4407 – bsotomayor@targetengineering.com <br /> <br />07/15 – 08/17: Roadway Inspector/Inspector Aide – Reconstruction of SR 997/Krome Avenue from North of SW 8th <br />Street/Tamiami Trail to MP 5.122 - FDOT D6 (Miami-Dade County). This $26.4 million project included the reconstruction 5 miles of a <br />new 4-lane divided section with a 40-foot median and guardrail in select locations. Environmental awareness is addressed with the <br />installations of 6’ x 22” wildlife crossings and a water-quality sensitive drainage system with more than 8,400 LF of French drain, almost <br />9,400 LF of solid pipe, and 190 drainage structures. The Project also addressed multi-modal and safety purposes by providing 5-foot <br />paved shoulders for the north- and southbound roadways that will be marked for bicycle use. The Project is adjacent to the Florida <br />Everglades and required significant de-mucking for the construction of the widened section. Responsibilities same as project above. <br />Reference: Hector Fung, P.E. – FDOT Project Manager (305) 640-7457 – Hector.Fung@dot.state.fl.us <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />EDUCATION <br />BS, Civil Engineering, Jose Antonio <br />Echeverria Higher Polytechnic <br />Engineering Institute (Cuba) <br /> <br />EXPERIENCE <br />5+ Years <br /> <br />REGISTRATIONS / CERTIFICATIONS <br />▪ CTQP Asphalt Paving Tech I <br />▪ CTQP Earthwork Inspection I & II <br />▪ CTQP Final Estimates I <br />▪ CTQP Concrete Field Tech I <br />▪ FDOT Intermediate MOT <br />▪ FDOT Critical Struc. Const. Issues <br />▪ FDOT Auger Cast Pile Inspection <br />▪ FDOT MSE Wall Inspection <br />▪ Nuclear Gauge Safety <br />▪ ACI Concrete Field Tech I <br /> <br />TIN #: G552-818-68-790-0 <br />