Laserfiche WebLink
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />12. NAME <br />Jeffrey O’Connor, PE <br />13. ROLE IN THIS CONTRACT <br />Underwater Inspection Leader/Inspector <br />14. YEARS EXPERIENCE <br />a. TOTAL <br /> 34 b. WITH CURRENT FIRM <br /> 7 <br />15. FIRM NAME AND LOCATION (City and State) <br />Underwater Engineering Services, Inc., Fort Pierce, FL <br />16. EDUCATION (DEGREE AND SPECIALIZATION) <br />B.S.C.E. / 1985 / Iowa State University <br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br />1996 / Professional Engineer / FL / #50914 <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />FHWA/NHI Certified Instructor for Underwater Bridge Inspection, Safety Inspection of In-Service Bridges & Bridge Inspection Refresher <br />19. RELEVANT PROJECTS <br />a. <br />(1) TITLE AND LOCATION (City and State) <br />Structure Inspection Program – Underwater Component, SFWMD <br />South Florida <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2020 <br />CONSTRUCTION (If Applicable) <br />NA <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm <br />Project Assignment: Underwater inspection of water control structures. Three task work orders included 23, 36 and 38 structures for <br />FY17-18, FY18-19 and FY19-20, respectively, including culverts, spillways, pump stations, boat locks, and weirs. Fee to date $1M. <br />Inspections performed with surface-supplied air. All inspection video and audio were recorded. Mr. O’Connor was the Project Manager and <br />on-site engineer for this work. He also signed and sealed all of the reports. <br />b. <br />(1) TITLE AND LOCATION (City and State) <br />Prof. Services for Topside & Underwater Routine and Fracture Critical <br />Bridge Inspections, Bolton Perez (BPA – Prime) <br />Miami, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2017 <br />CONSTRUCTION (If Applicable) <br />NA <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm <br />Project Assignment: Underwater structural assessments of five bridges as part of the Miami-Dade Transit Metromover train system. <br />UESI provided a three-person dive team led by a registered Florida Professional Engineer-diver. The scope included all underwater <br />elements, including piles, piers, footings, and fenders. Prepared report with elements and ratings similar to that used by FDOT. The contract <br />amount was $14K. Mr. O’Connor was the Project Manager and performed the inspections. <br />c. <br />(1) TITLE AND LOCATION (City and State) <br />FDOT Dist. 5 Local Gov’t. Bridge Inspections, Ayres Associates (Prime) <br />East Central, Florida <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2018 <br />CONSTRUCTION (If Applicable) <br />NA <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm <br />Project Assignment: Underwater structural assessments of three movable bridges located in and north of Daytona Beach, FL. The project <br />also included performing underwater quality assurance inspections of three bridges. The contract amount was $9K. Mr. O’Connor was the <br />Project Manager and performed the inspections of two of the movable bridges. <br />d. <br />(1) TITLE AND LOCATION (City and State) <br />FDOT SR-206 / Crescent Beach Bridge Cathodic Protection, GPI (Prime) <br />Crescent Beach, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2020 <br />CONSTRUCTION (If Applicable) <br />NA <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm <br />Project Assignment: Underwater construction engineering inspection services for piles on the SR-206 Bridge over the Matanzas River. <br />Thirty-six piles required cathodic protection jackets. UESI inspected all piles prior to the work to verify the plans; then inspected each pile <br />at least twice – once prior to jacket install to check the cleanliness, the rebar, and anode connection - and once after jacket install. The <br />contract amount was $39K. Mr. O’Connor was the Project Manager and led approximately 50% of the inspections. <br />e. <br />(1) TITLE AND LOCATION (City and State) <br />Design Services for City Marina Pier Replacement <br />City of Vero Beach, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2017 <br />CONSTRUCTION (If Applicable) <br />2018 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm <br />Project Assignment: Design of repairs to the main pier at the City Marina. This project followed the inspection project also performed by <br />UESI. Repairs were comprised of hardware replacement, stringer replacement, beam replacement, one bent replacement, and pile repairs. <br />The fee was $16K. Mr. O’Connor was the Project Manager and lead designer of the repairs. <br /> STANDARD FORM 330 (1/2004) PAGE 2 <br /> <br />Section E - Page | 81