Laserfiche WebLink
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />12. NAME <br />Marty Faulk, CBI <br />13. ROLE IN THIS CONTRACT <br />Underwater Inspection Team Leader <br />14. YEARS EXPERIENCE <br />a. TOTAL <br /> 14 b. WITH CURRENT FIRM <br /> 8 <br />15. FIRM NAME AND LOCATION (City and State) <br />Underwater Engineering Services, Inc., Fort Pierce, FL <br />16. EDUCATION (DEGREE AND SPECIALIZATION) <br />H.S Graduate. US Marine Corps Honorable Discharge 1988 <br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br />1995 / Certified Bridge Inspector / FL / #00317 <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />NACE CIP Level II Inspector; ANSI N45.2.6 / ASTM D4537 Level III Coatings Inspector <br />19. RELEVANT PROJECTS <br />a. <br />(1) TITLE AND LOCATION (City and State) <br />Structure Inspection Program – Underwater Component, SFWMD <br />South Florida <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2020 <br />CONSTRUCTION (If Applicable) <br />YYYY <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm <br />Project Assignment: Underwater inspection of water control structures. Three task work orders included 23, 36 and 38 structures for <br />FY17-18, FY18-19 and FY19-20, respectively, including culverts, spillways, pump stations, boat locks, and weirs. Fee to date $1M. <br />Inspections performed with surface-supplied air. All inspection video and audio were recorded. Mr. Faulk was dive supervisor for <br />approximately 30% of this work and assisted in the report development and video production. <br />b. <br />(1) TITLE AND LOCATION (City and State) <br />FDOT Dist. 5 Local Gov’t. Bridge Inspections, Ayres Associates (Prime) <br />East Central, Florida <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2017 <br />CONSTRUCTION (If Applicable) <br />YYYY <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm <br />Project Assignment: Underwater structural assessments of three movable bridges located in and north of Daytona Beach, FL. The project <br />also included performing underwater quality assurance inspections of three bridges. The contract amount was $9K. Mr. Faulk was dive <br />supervisor and performed the inspections of one movable bridge and the three QA bridges. <br />c. <br />(1) TITLE AND LOCATION (City and State) <br />FDOT SR-206 / Crescent Beach Bridge Cathodic Protection, GPI (Prime) <br />Crescent Beach, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2020 <br />CONSTRUCTION (If Applicable) <br />YYYY <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm <br />Project Assignment: Underwater construction engineering inspection services for piles on the SR-206 Bridge over the Matanzas River. <br />Thirty-six piles required cathodic protection jackets. UESI inspected all piles prior to the work to verify the plans; then inspected each pile <br />at least twice – once prior to jacket install to check the cleanliness, the rebar, and anode connection - and once after jacket install. The <br />contract amount was $39K. Mr. Faulk was dive supervisor for approximately 40% of the inspections. <br />d. <br />(1) TITLE AND LOCATION (City and State) <br />FDOT I-295 Buckman Bridge Cathodic Protection, GPI (Prime) <br />Jacksonville, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2016 <br />CONSTRUCTION (If Applicable) <br />YYYY <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm <br />Project Assignment: Underwater construction engineering inspection services for piles on the I-295 Buckman Bridge over the St Johns <br />River. Approximately 100 piles required cathodic protection jackets. UESI inspected each pile at least twice – once prior to jacket install to <br />check the cleanliness, the rebar, and anode connection - and once after jacket install. The contract amount was $144K. Mr. Faulk was dive <br />supervisor for approximately 40 of the 48 inspection trips. <br />e. <br />(1) TITLE AND LOCATION (City and State) <br />Crane’s Roost Inspection, GAI Consultants (Prime) <br />Altamonte Springs, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2013 <br />CONSTRUCTION (If Applicable) <br />NA <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm <br />Project Assignment: Underwater inspection of a pedestrian bridge, a floating stage, a tower overlook, and amphitheater. The structures <br />were comprised of timber piles and sheetpiling. The stage was founded on floating docks assembled together. The fee for the services <br />was $14K. Mr. Faulk led the inspections and wrote the condition report of findings. <br /> STANDARD FORM 330 (1/2004) PAGE 2 <br /> <br />Section E - Page | 82