E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person.)
<br />12. NAME
<br />Marty Faulk, CBI
<br />13. ROLE IN THIS CONTRACT
<br />Underwater Inspection Team Leader
<br />14. YEARS EXPERIENCE
<br />a. TOTAL
<br /> 14 b. WITH CURRENT FIRM
<br /> 8
<br />15. FIRM NAME AND LOCATION (City and State)
<br />Underwater Engineering Services, Inc., Fort Pierce, FL
<br />16. EDUCATION (DEGREE AND SPECIALIZATION)
<br />H.S Graduate. US Marine Corps Honorable Discharge 1988
<br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
<br />1995 / Certified Bridge Inspector / FL / #00317
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />NACE CIP Level II Inspector; ANSI N45.2.6 / ASTM D4537 Level III Coatings Inspector
<br />19. RELEVANT PROJECTS
<br />a.
<br />(1) TITLE AND LOCATION (City and State)
<br />Structure Inspection Program – Underwater Component, SFWMD
<br />South Florida
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2020
<br />CONSTRUCTION (If Applicable)
<br />YYYY
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm
<br />Project Assignment: Underwater inspection of water control structures. Three task work orders included 23, 36 and 38 structures for
<br />FY17-18, FY18-19 and FY19-20, respectively, including culverts, spillways, pump stations, boat locks, and weirs. Fee to date $1M.
<br />Inspections performed with surface-supplied air. All inspection video and audio were recorded. Mr. Faulk was dive supervisor for
<br />approximately 30% of this work and assisted in the report development and video production.
<br />b.
<br />(1) TITLE AND LOCATION (City and State)
<br />FDOT Dist. 5 Local Gov’t. Bridge Inspections, Ayres Associates (Prime)
<br />East Central, Florida
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2017
<br />CONSTRUCTION (If Applicable)
<br />YYYY
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm
<br />Project Assignment: Underwater structural assessments of three movable bridges located in and north of Daytona Beach, FL. The project
<br />also included performing underwater quality assurance inspections of three bridges. The contract amount was $9K. Mr. Faulk was dive
<br />supervisor and performed the inspections of one movable bridge and the three QA bridges.
<br />c.
<br />(1) TITLE AND LOCATION (City and State)
<br />FDOT SR-206 / Crescent Beach Bridge Cathodic Protection, GPI (Prime)
<br />Crescent Beach, FL
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2020
<br />CONSTRUCTION (If Applicable)
<br />YYYY
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm
<br />Project Assignment: Underwater construction engineering inspection services for piles on the SR-206 Bridge over the Matanzas River.
<br />Thirty-six piles required cathodic protection jackets. UESI inspected all piles prior to the work to verify the plans; then inspected each pile
<br />at least twice – once prior to jacket install to check the cleanliness, the rebar, and anode connection - and once after jacket install. The
<br />contract amount was $39K. Mr. Faulk was dive supervisor for approximately 40% of the inspections.
<br />d.
<br />(1) TITLE AND LOCATION (City and State)
<br />FDOT I-295 Buckman Bridge Cathodic Protection, GPI (Prime)
<br />Jacksonville, FL
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2016
<br />CONSTRUCTION (If Applicable)
<br />YYYY
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm
<br />Project Assignment: Underwater construction engineering inspection services for piles on the I-295 Buckman Bridge over the St Johns
<br />River. Approximately 100 piles required cathodic protection jackets. UESI inspected each pile at least twice – once prior to jacket install to
<br />check the cleanliness, the rebar, and anode connection - and once after jacket install. The contract amount was $144K. Mr. Faulk was dive
<br />supervisor for approximately 40 of the 48 inspection trips.
<br />e.
<br />(1) TITLE AND LOCATION (City and State)
<br />Crane’s Roost Inspection, GAI Consultants (Prime)
<br />Altamonte Springs, FL
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2013
<br />CONSTRUCTION (If Applicable)
<br />NA
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm
<br />Project Assignment: Underwater inspection of a pedestrian bridge, a floating stage, a tower overlook, and amphitheater. The structures
<br />were comprised of timber piles and sheetpiling. The stage was founded on floating docks assembled together. The fee for the services
<br />was $14K. Mr. Faulk led the inspections and wrote the condition report of findings.
<br /> STANDARD FORM 330 (1/2004) PAGE 2
<br />
<br />Section E - Page | 82
|