My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R.J. BEHAR & CO.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
R.J. BEHAR & CO.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2020 11:25:35 AM
Creation date
8/24/2020 11:23:09 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
166
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />12. NAME <br />Vince Trotta <br />13. ROLE IN THIS CONTRACT <br />Underwater Inspector <br />14. YEARS EXPERIENCE <br />a. TOTAL <br /> 26 b. WITH CURRENT FIRM <br /> 13 <br />15. FIRM NAME AND LOCATION (City and State) <br />Underwater Engineering Services, Inc., Fort Pierce, FL <br />16. EDUCATION (DEGREE AND SPECIALIZATION) <br />H.S Graduate <br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br /> <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />Certification FHWA NHI Underwater Bridge Inspection Course; ANSI N45.2.6 Level II Coatings Inspector <br />19. RELEVANT PROJECTS <br />a. <br />(1) TITLE AND LOCATION (City and State) <br />Structure Inspection Program – Underwater Component, SFWMD <br />South Florida <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2020 <br />CONSTRUCTION (If Applicable) <br />NA <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm <br />Project Assignment: Underwater inspection of water control structures. Three task work orders included 23, 36 and 38 structures for <br />FY17-18, FY18-19 and FY19-20, respectively, including culverts, spillways, pump stations, boat locks, and weirs. Fee to date $1M. <br />Inspections performed with surface-supplied air. All inspection video and audio were recorded. Mr. Trotta was dive supervisor for <br />approximately 30 structures and performed the inspection of two structures. <br />b. <br />(1) TITLE AND LOCATION (City and State) <br />Prof. Services for Topside & Underwater Routine and Fracture Critical <br />Bridge Inspections, Bolton Perez (BPA – Prime) <br />Miami, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2018 <br />CONSTRUCTION (If Applicable) <br />NA <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm <br />Project Assignment: Underwater structural assessments of five bridges as part of the Miami-Dade Transit Metromover train system. <br />UESI provided a three-person dive team led by a registered Florida Professional Engineer-diver. The scope included all underwater <br />elements, including piles, piers, footings, and fenders. Prepared report with elements and ratings similar to that used by FDOT. The contract <br />amount was $14K. Mr. Trotta was the dive supervisor for the inspections. <br />c. <br />(1) TITLE AND LOCATION (City and State) <br />Structure Inspections – Underwater Diving Services, SJRWMD <br />East Central Florida <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2020 <br />CONSTRUCTION (If Applicable) <br />NA <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm <br />Project Assignment: Underwater inspection of 35 gated culverts and one boat lock. Inspections performed with surface-supplied air. All <br />inspection video and audio were recorded. The structure elements were rated according to the District system. The contract fee was $274K. <br />Mr. Trotta was dive supervisor for approximately 5 structures. <br />d. <br />(1) TITLE AND LOCATION (City and State) <br />FDOT SR-206 / Crescent Beach Bridge Cathodic Protection, GPI (Prime) <br />Crescent Beach, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2020 <br />CONSTRUCTION (If Applicable) <br />NA <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm <br />Project Assignment: Underwater construction engineering inspection services for piles on the SR-206 Bridge over the Matanzas River. <br />Thirty-six piles required cathodic protection jackets. UESI inspected all piles prior to the work to verify the plans; then inspected each pile <br />at least twice – once prior to jacket install to check the cleanliness, the rebar, and anode connection - and once after jacket install. The <br />contract amount was $39K. Mr. Trotta was the dive supervisor for one of the trips. <br />e. <br />(1) TITLE AND LOCATION (City and State) <br /> <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br /> <br />CONSTRUCTION (If Applicable) <br /> <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm <br /> <br /> STANDARD FORM 330 (1/2004) PAGE 2 <br /> <br />Section E - Page | 83
The URL can be used to link to this page
Your browser does not support the video tag.