Laserfiche WebLink
<br />G. KEY PERSONNEL PARTICIPATION IN EXAMPLE PROJECTS <br />26. NAMES OF KEY <br />PERSONNEL <br />(From Section E, <br />Block 12) <br />27. ROLE IN THIS <br />CONTRACT <br />(From Section E, <br />Block 13) <br />28. EXAMPLE PROJECTS LISTED IN SECTION F <br />(Fill in “Example Projects Key” section below before completing <br />table. Place “X” under project key number for <br />participation in same or similar role.) <br />1 2 3 4 5 6 7 8 9 10 <br />Jeffrey O’Connor, PE (UESI) Underwater Inspection <br />Leader / Inspector X X X X <br />Marty Faulk, CBI (UESI) Underwater Inspection <br />Team Leader X X X <br />Vince Trotta (UESI) Underwater Inspector X X X <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />29. EXAMPLE PROJECTS KEY <br />NO. TITLE OF EXAMPLE PROJECT (FROM SECTION F) NO. TITLE OF EXAMPLE PROJECT (FROM SECTION F) <br />1 Structure Inspection Program – Underwater Component, <br />SFWMD, South Florida 6 <br />2 Prof. Services for Topside & UW Routine and F.C. Bridge <br />Inspections (Miami-Dade Co.), Bolton Perez (Prime) 7 <br />3 FDOT Dist. 5 Local Gov’t. Bridge Inspections, Ayres <br />Associates (Prime), East Central Florida 8 <br />4 FDOT SR-206 / Crescent Beach Bridge Cathodic Protection, <br />GPI (Prime), Crescent Beach, FL 9 <br />5 10 <br /> <br />Section E - Page | 88