Laserfiche WebLink
Firm Staff Degree Responsibility Availability Current Workload Status, Projected <br />Completion Projected Workload Projected <br />Completion <br />RJB Paola Riveros BS PM/Transportation/Civil/Parks 65%I-95 at 6th Interchange 60% complete, Completion <br />7/27/22 <br />Port St. Lucie Blvd <br />Reconstruction 4/24/2024 <br />RJB Robert J. Behar MS Principal in Charge/Transportation/Parks 55%NE 151 Street Imp.Final Plans, 1/2021 NE 151 Street Imp. Phase 2 12/31/2020 <br />FAA/Civil Engineering <br />RJB Juan H. Vazquez BS Quality Control/Assurance/FAA/FDOT 35%Cypress Weir Control Structure Ready to Advertise, 9/2020 <br />Central Broward Water Control District <br />Permit Reviews Ongoing Central Broward Water Control <br />District Permit Reviews Ongoing <br />Miami Gardens Stormwater Master Plan <br />Update Final Report - 7/26/21 Turnpike Draiange Report 2/22/2021 <br />RJB Jerry Piccolo BS Major Bridge/Seawall Design/Structures 25%PBC Annual Varies PBC Annual Varies <br />RJB Nestor Santana BS Cost Estimating/Specs/Construction <br />Management 85%Safe Routes to School Miami Lakes 9/1/2020 None <br />Cypress Weir Control Structure Ready to Advertise, 9/1/2020 <br />RJB Jose A. Peña MS PM / Structural Design/Threshold Insp.75%Cypress Weir Control Structure Ready to Advertise, 9/2020 MIA Bridge Rehabilitation 10/2021 <br />S-40, S-41, S-44 Post Design Construction, 7/2022 <br />RJB Rafael De Arazoza BS Traffic Studies 80%None Eliatha Church Traffic Study 12/31/2020 <br />RJB Jasmani Riveron MS Roadway/Streetscape/Pavement 65%Summit Blvd Bridge Over LWDD E-3 <br />Canal 65% Plans, 12/21 Summit Boulevard Roadway 5/6/2021 <br />RJB Elmer Cardenas BS Water Resources/Environmental 80%Cutler Bay CEI Services 9/4/2020 NE 151 Street Imp. Phase 2 12/31/2020 <br />RJB Carmelo Ramos BS Electrical/Lighting 65%Cypress Weir Control Structure Ready to Advertise, 9/2020 None <br />RJB Rafael Droz Seda BS Threshold Inspections 80%None As needed None <br />RJB Jossmel Cruz MS Structural Design 75%S-40, S-41, S-44 Post Design Construction, 7/2022 MIA Bridge Rehabilitation 10/2021 <br />Cypress Weir Control Structure Ready to Advertise, 9/2020 <br />RJB Hector Rosario BS Water Resources/Cost Estimates/Plans 75%Cypress Weir Control Structure Ready to Advertise, 9/2020 MIA Bridge Rehabilitation 10/2021 <br />Preparation Miami Gardens Stormwater Master Plan <br />Update Existing Conditions, 7/2021 <br />RJB Michelle Leon BS Traffic & Data Collection / Construction <br />Management 45%S-151 Structure Replacement Construction, 12/2020 None <br />RJB Nanette Akyaz BS Plans Preparation 45%NE 151 Street Imp.Final Plans, 1/2021 NE 151 Street Imp. Phase 2 12/2020 <br />RJB Joyce Ledan BS Plans Preparation 65%NE 151 Street Imp.Final Plans, 1/2021 NE 151 Street Imp. Phase 2 12/2020 <br />RJB Zugeil Velez BS Construction Management / Document <br />Control 90%Colbert Elementary School SRTS Construction, 8/2020 None <br />Section E.3 – Availability & Workload <br />RJB Hans Murzi MS PM / Water Resources 75% <br />Section E - Page | 91