My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R.J. BEHAR & CO.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
R.J. BEHAR & CO.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2020 11:25:35 AM
Creation date
8/24/2020 11:23:09 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
166
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RJB Alejandro Medina BS Construction Management / Inspections 80%Miami Dade Traffic Ops Push Button Construction, 10/2020 None <br />RJB Jaime Delgado Utility Coordination/Data Collection 75%I-95 at 6th Interchange 60% complete, Completion <br />7/27/22 <br />Port St. Lucie Blvd <br />Reconstruction 4/24/2024 <br />RJB Angel Marinez BS Plans Preparation/Design 65%I-95 at 6th Interchange 60% complete, Completion <br />7/27/22 <br />Port St. Lucie Blvd <br />Reconstruction 4/24/2024 <br />RJB Xamarah Seda Velez MS Plans Preparation/Design 65%I-95 at 6th Interchange 60% complete, Completion <br />7/27/22 <br />Port St. Lucie Blvd <br />Reconstruction 4/24/2024 <br />RJB Logan Fasanella AA Construction Management / Inspections/Data <br />Collection 90%SRTS Miami Lakes Elementary School Construction, 8/2020 None <br />Firm Staff Degree Responsibility Availability Current Workload Status, Projected <br />Completion Projected Workload Projected <br />Completion <br />TSF Raj Krishnasamy BS Geotechnical Engineering 30%SR 7.US 441 Transit Corridor <br />Improvements 50%,12/2020 <br />Widen HEFT North of Campbell <br />Drive to North of Tallahassee <br />Road <br />2021 <br />Atlantic Blvd (PD&E Study) 80%, 9/2020 SR 802-Lake Worth Road at <br />Haverhill Road 2021 <br />TSF Francois Thomas BS Geotechnical Engineering 60%Seacrest Blvd. from NE 22nd St. to <br />Gulfstream Blvd - 7112-20-031 70%, 10/2020 Key West Airport 2021 <br />UM Intramural Fields Phase 2 50%, 12/2020 Lantana Airport 2021 <br />Firm Staff Degree Responsibility Availability Current Workload Status, Projected <br />Completion Projected Workload Projected <br />Completion <br />JEBA Javier E. Bidot Cruz BS Surveying 50%USACE Contract Tasks # 19-12, 19-226, <br />19-257, 20-032, 20-197 50%; 12/31/2020 USACE Contract Tasks # 20-172, <br />20-189, 20-197 3/30/2021 <br />JEBA Carlos Lebrón Cabrera BS Surveying 50%USACE Contract Tasks # 19-12, 19-226, <br />19-257, 20-032, 20-197 50%; 12/31/2020 USACE Contract Tasks # 20-172, <br />20-189, 20-197 3/30/2021 <br />Firm Staff Degree Responsibility Availability Current Workload Status, Projected <br />Completion Projected Workload Projected <br />Completion <br />2020-2021 SFWMD SIP Inspections <br />October 2020 – May 2021 10%, Ongoing SFWMD SIP Inspections <br />2021-2022 SFWMD SIP Inspections <br />October 2021 – May 2022 10%, Ongoing SFWMD SIP Inspections <br />2020-2021 SFWMD SIP Inspections <br />October 2020 – May 2021 10%, Ongoing SFWMD SIP Inspections <br />2021-2022 SFWMD SIP Inspections <br />October 2021 – May 2022 10%, Ongoing SFWMD SIP Inspections <br />2020-2021 SFWMD SIP Inspections <br />October 2020 – May 2021 10%, Ongoing SFWMD SIP Inspections <br />2021-2022 SFWMD SIP Inspections <br />October 2021 – May 2022 10%, Ongoing SFWMD SIP Inspections <br />UESI Contract End date <br />is 9/30/202260%Underwater InspectionsBSJeffrey O’Connor <br />Contract End date <br />is 9/30/2022 <br />UESI Vince Trotta Underwater Inspections 60%Contract End date <br />is 9/30/2022 <br />UESI Marty Faulk, CBI Underwater Inspections 60% <br />Section E - Page | 92
The URL can be used to link to this page
Your browser does not support the video tag.