Laserfiche WebLink
I-595 MOBILITY HUB PARK AND RIDE <br /> BROWARD COUNTY, FLORIDA <br />CLIENT: <br />Florida Department of <br />Transportation, District 4 <br />Helen James, P.E. <br />Project Manager <br />Design Consultant Management <br />Office <br />3400 West Commercial Blvd. <br />Fort Lauderdale, FL 33309 <br />Tel: (954) 777-4346 <br />Email: Helen.james@dot.state.fl.us <br />RJ BEHAR’S ROLE: <br />Project management, parking lot <br />design, drainage design, and signing <br />and pavement markings <br />PROJECT STARTED: 2/27/2017 <br />PROJECT COMPLETED: 2/28/2018 <br />COST/FEES PAID: $86,500.00 <br />CONSTRUCTION COST: <br />$865,000 <br />FM NO.: 439776-1-52-01 <br />RJ BEHAR’S KEY PERSONNEL <br /> Juan H. Vazquez, PE, PH, BCEE <br />Principal in Charge <br />Paola Riveros, PE <br />Project Manager <br />Kira Leon, EI <br />Project Engineer <br />Nanette Akyaz <br />Project Designer <br />The existing Mobility Hub/Park and Ride is located at the southeast <br />corner of the intersection of SR 84 and Davie Road in the Town of Davie. <br />The mobility hub was designed with a capacity of 108 parking spaces. <br />The site provides platforms for the express buses (on SR 84), local <br />shuttles and drop off/pick up vehicles. There is also a connection from <br />SR 84 to Reese Road. The connection was meant to be used only by buses <br />and consisted of one travel lane from SR 84 to Reese Road at the <br />northeast corner of the property. The number of parking spaces has <br />become inadequate and the connection from SR 84 to Reese Road is <br />being used by all vehicles without control. <br />The scope of work for this project included modifying the mobility hub to <br />increase and maximize the number of parking slots, review the Reese <br />Road connection to improve access control and improve circulation. <br />These improvements required modifications to the existing drainage, <br />lighting, signing and pavement markings and landscaping. <br />R.J. Behar’s services included the preparation of a Community <br />Awareness Plan, preparing Flyers and attending a public meeting. <br />Coordination included the Town of Davie, Broward County Transit <br />agency and the Department. The site design included preparing a <br />master plan of the proposed improvements for review and approval by <br />the FDOT. Once the master plan was approved, the design included <br />geometric design, quantities, specifications, cost estimates, drainage <br />design and drainage plans, signing and marking design and plans, <br />lighting design and plans, utility coordination, and preparing the <br />required permit modifications. <br />Section F - Page | 10