Laserfiche WebLink
<br />Tower had two vertical sluice gates, one variable crest gate and trash racks. The piping was <br />inspected with a five-person dive team for the 300-ft-long penetration inspections. <br />Reservoir No. 2 Influent Works was comprised of one 72-inch-diameter influent pipe and a <br />concrete discharge structure with three trash racks. The piping was inspected with a five-person <br />dive team for the 400-ft-long penetration inspections. Prior to the inspections, UESI installed a <br />door on the trash rack of the discharge structure. A detailed report was provided that included <br />findings, photographs, and recommendations for repair. <br /> <br />Note: The identical inspections were completed as a subconsultant in 2019. <br />d. Year completed: 2015 <br />e. Team Members: Jeffrey O’Connor, PE; Marty Faulk, CBI; <br />Section F - Page | 18