My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R.J. BEHAR & CO.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
R.J. BEHAR & CO.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2020 11:25:35 AM
Creation date
8/24/2020 11:23:09 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
166
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Continuing Professional Consulting Services (CCNA) <br />Request for Qualifications No. 20-07-01 <br />Section D – Page | 5 <br />and value – value is function divided by cost. Concentration on the function of the project or product will avoid mere cost <br />cutting. <br /> <br />The project manager must take a pro-active role in both giving direction and leadership in the value engineering process, <br />but must also ensure that time and effort is not wasted and does not have a detrimental effect on the progress of the project. RJ Behar encourages sustainable design and the development of innovative, low-impact solutions. For example, we can <br />implement any of the following: executing newly proven best management practices to reduce stormwater runoff; determining <br />the best location for site amenities to encourage community use; utilizing new materials that promote public safety while <br />limiting environmental impacts; and researching methods that can minimize time and effort. This amounts to reducing overall <br />operational and maintenance costs for our Clients. Additionally, we have experienced staff, who understand the relationship <br />between cost, quality, and timeliness. As a result, we can effectively evaluate the advantages and disadvantages of our <br />solutions against environmental factors and determine the best solutions with the least impact for every unique circumstance. <br />Our experience in sustainable design includes the design of the Broward County Department of Environmental Protection <br />Green Laboratory, where we designed the site amenities and evaluated green features such as bio-swales. This was the <br />first green building design for Broward County. We also designed the site, grading with complete specifications for the <br />Hickory Hammock Equestrian Campground for the SFWMD. In this site we designed compost toilets and solar powered <br />lighting. <br /> <br />Under the City of Miami Beach Comprehensive Green Building and Energy <br />Conservation Program, the City partnered with Ameresco to identify capital <br />improvements to save energy costs in City facilities. Ameresco is the largest <br />independent Energy Services Provider in North America. The Convention <br />Center Chiller upgrade project proposed to extend the existing chilled water <br />loop at the Convention Center and Jackie Gleason Theater to provide chilled <br />water for City Hall and the new Municipal Parking Garage. This energy <br />conservation measure (ECM) converted the Convention Center cooling plant <br />into a District Cooling Plant. This project shifted inefficient chilled water <br />operations at City Hall and the new Municipal Parking Garage to the <br />modernized plant currently serving the Convention Center. In order to maximize the efficiency of the new District Cooling <br />Plant, the project included the installation of a Chiller Plant Optimization Package to the plant along with a Geothermal <br />Condenser Water System. These combined efficiency improvements to the Convention Center Chiller Plant greatly improved <br />cooling efficiency to the buildings served utilizing chilled water. The total program will save the City an estimated $1.8 million <br />each year in energy costs. RJ Behar designed the Miami Beach Convention Center underground piping, the supply and <br />discharge wells and the Police Station wells. RJ Behar prepared all site plans and permit packages for the supply and <br />injection wells. The design followed the recommendations of a hydrogeologic report that included the construction of a test <br />well on site to determine underground soil and hydrogeologic parameters. RJ Behar was also responsible for all the utility <br />coordination and pipe routing. The project was completed as a design-build project working for Kerney & Associates a <br />contractor under Ameresco. <br /> <br />As population continues to grow, so does our understanding of sustainable development. It should be our goal to improve <br />our quality of life while reducing environmental impacts by providing a more planned and sustainable development strategy. <br />Transit and other alternative modes of transportation such as walking or biking, must support these strategies. <br /> <br />Miami-Dade County studied their existing land development and transportation infrastructure to meet a more sustainable <br />standard of design. The County developed the Miami-Dade Green Print document, in which one of its goals was to increase <br />integration of transit with pedestrian and bicycle trips as part of the Responsible Land Use and Smart Transportation initiative. <br />As part of this study RJ Behar prepared a generalized bicycle parking guide layout. The layout intended for distribution to
The URL can be used to link to this page
Your browser does not support the video tag.