Laserfiche WebLink
Continuing Professional Consulting Services (CCNA) <br />Request for Qualifications No. 20-07-01 <br />Section D – Page | 7 <br /> Final Construction Plans – this is the final engineer’s estimate based on the final design. <br /> <br />RJ Behar has an excellent track record with our project bids coming within 5% of our final engineer’s estimate. RJ Behar is <br />aware of the budget and time constraints. We will take appropriate action to reallocate resources if the work items fall behind <br />schedule in accordance with the critical path to minimize impact to the overall schedule. We will effectively manage the <br />budget and have developed a logical quality control plan, which we will adhere to the plan throughout the project. We <br />routinely rank 4.0 or above (1-5 ranking) on FDOT evaluations regarding budget and time. <br />DOCUMENT CONTROL <br />Document control is very important. All administrative procedures and legal protections <br />require proper care of documentation. RJ Behar understands matching documentation <br />requirements with any size project. We use a straightforward system for prioritizing, <br />routing, and maintaining the necessary project documentation. Besides memos and <br />meeting minutes, there are contract documents, plans, specifications, operation <br />manuals, survey data and invoicing that will all need to be routed to their proper locations <br />within the City system. RJ Behar has worked with numerous public agencies and <br />municipalities since its inception and is adept at organizing project documentation using the client’s methods, procedures, <br />and formats. We are familiar with most document formats used in engineering documentation and will easily adapt to <br />requirements of the City. <br />QUALITY CONTROL PROCESS RJ Behar will ensure the quality of its product. Mr. Juan Vazquez, PE will be responsible for the quality assurance. An <br />autonomous group of reviewers will be responsible for this activity. The individuals assigned are highly experienced in the <br />tasks they will be reviewing. Committing the appropriate staff to the project is the most important quality assurance measure. <br />Our Quality Control process is very comprehensive and has resulted in the avoidance of claims during construction. A <br />synopsis of our Quality Program is outlined below: <br />QC REVIEWS: These will be separated into three major areas: 1) engineering design review (criteria) 2) plans <br />preparation/cross reference review 3) constructability review. Providing for these will assure the City the quality it is <br />paying for. For this review process, we have developed checklists of items that must be included on each type of project. <br />QC PROCESS: The process starts with the 1) design originator, 2) it is sent to a checker, it goes back to the 3) originator <br />who reviews the markups and determines which comments are to be implemented. 4) The originator and checker meet <br />to discuss the comments and come to an agreement on the implementation of the comments. 5) If they cannot come to <br />an agreement, the Project Manager will then make that determination. 6) Comments are implemented. 7) Plans are back- <br />checked. All these steps require our QC Stamp, dated and initialed by the individual(s) involved. <br />CONSTRUCTABILITY REVIEW: Mr. Nestor Santana, PE will lead our constructability reviews. He has been involved in <br />construction engineering and inspection projects for over 25 years. He will be reviewing the plans from the contractor’s <br />perspective. He will be looking for lack of consistency between plans, specs, utility agreements, and permit agreements. <br />He will ensure that all pay items are accounted for, check for feasibility of the construction sequence and for claims <br />potential. <br />QUALITY ASSURANCE: Mr. Juan Vazquez, PE, RJ Behar’s vice-president, will certify that the quality control reviews were <br />completed prior to all formal submittals. <br /> <br />UNDERSTANDING THE CITY’S NEEDS <br />RJ Behar has had the privilege of working with the City of Sunny Isles Beach before and would like to continue our working <br />relationship on this Request for Qualifications for Continuing Professional Consulting Services (CCNA). We have provided <br />a project approach, based on RJ Behar’s management procedures and quality assurance practices, which closely match <br />those required by the City. Based on our approach, we believe we have demonstrated our ability to successfully deliver <br />high quality service throughout this contract.