Laserfiche WebLink
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person) 12. NAME <br />PAOLA RIVEROS, PE <br />13. ROLE IN THIS CONTRACTProject Manager; Roadway Streetscape,Sidewalks, Parking, Pavement Evaluation &Repairs, S&M; Civil/Site, Feasibility Studies, Parks and Recreational Facilities, Lighting, Utilities <br />14. YEARS EXPERIENCE <br />a.TOTAL <br />19 <br /> b. WITH CURRENT FIRM <br />19 <br />15. FIRM NAME AND LOCATION (City and State)R.J. BEHAR & COMPANY, INC. 6861 SW 196th Avenue, Suite 302 <br />Pembroke Pines, FL 33332 <br />16. EDUCATION (Degree and Specialization)B.S. Civil Engineer, Florida International University/2001 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) <br /> P.E. Florida No.74249/2012 P.E. Washington, D.C., No. 905769/2010 <br />18.OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)Ms. Riveros has been responsible for the preparation of roadway plans, drainage plans and site plans throughout South Florida. Ms. Riveros is <br />fully knowledgeable of Microstation. Ms. Riveros completed a computer course with introduction to GIS software in the application to <br />contamination of surface water bodies to determine affected zones by the plume. She has worked in several water and sewer projects. <br />19. RELEVANT PROJECTS <br />a. <br />(1) TITLE AND LOCATION (City and State)SW 136th Street from US-1 to Old Cutler Road Lap Project, Miami-Dade County, <br />Florida – Village of Palmetto Bay/Florida Department of Transportation (FDOT), District 6 <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES 2020 CONSTRUCTION (If applicable) Post Design Ongoing <br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firmProject Engineer: She was responsible for designing the roadway plans, pavement marking and signing plans, utility coordination, drainage design <br />and, permitting. The improvements will require milling and resurfacing the existing roadway and pavement widening to accommodate an on-road <br />dedicated bicycle lane. The primary challenge for this project was accommodating the proposed sidewalks and bicycle lanes in a right of way <br />constrained corridor. Project Length:1.92 miles; Project #: 434687-1; Cost/Fees Paid: $193,171.00; Construction Cost: $1,700,345.00 <br />b. <br />(1) TITLE AND LOCATION (City and State)I-595 Mobility Hub Park and Ride, Broward County, Florida - FDOT, District 4 <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES 2018 CONSTRUCTION (If applicable) 2019 <br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firmProject Manager responsible for the parking lot design, drainage design, and signing and pavement markings. The scope of work included <br />modifying the mobility hub to increase and maximize the number of parking slots, review the connections to improve access control, and improve <br />circulation. The improvements required modification to the existing drainage, lighting, signing and pavement markings, and landscaping. She was <br />also responsible for the preparation of a Community Awareness Plan, preparing Flyers, and attending a public meeting. Cost/Fees: $86,500 <br />Construction Cost: 900,000 <br />c. <br />(1) TITLE AND LOCATION (City and State)NE 151st Street Improvements, Miami-Dade County, Florida – Oleta Partners LLC/Miami-Dade County <br /> <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES Ongoing <br />CONSTRUCTION (If applicable) <br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firmProject Engineer: She is responsible for assisting with the roadway design, drainage design, signing and pavement markings, signalization, <br />lighting, wetland assessment, and utility coordination. NE 151st Street is an off-system roadway bound by the Florida Greenbook, for its design <br />criteria. Drainage design includes a series of interconnected French drains with drainage wells. Project Length: 0.876 miles Cost/Fees Paid: <br />$498,000.00; Construction Cost: $5,757,000.00. <br />d. <br />(1) TITLE AND LOCATION (City and State)Atlantic Boulevard at Rock Island Road, Intersection Improvement, Broward County, Florida – Broward County Construction & Engineering <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES 2013 CONSTRUCTION (If applicable) <br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firmTraffic Engineer: She performed a traffic analysis to determine the existing Level of Service (LOS) and provide recommendations to improve the <br />existing deficiencies, which also included projections for the design year, which was performed as part of the design project. Cost/Fees Paid: <br />$386,000; Construction Cost: $4,100,000 Project Length: 0.51 miles <br />e. <br />(1) TITLE AND LOCATION (City and State)City of Lauderdale Lakes Canal System Stabilization Project, Broward County, Florida – City of Lauderdale Lakes <br /> <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES 2017 CONSTRUCTION (If applicable) <br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firmProject Engineer: Ms. Riveros led the effort to perform the field inspections on land and by boat, prepared the alternative evaluation matrix, and <br />the final report of the canal evaluation with conclusions and recommendations. She also prepared plans for the improvements. Cost/Fees Paid: <br />$208,116; Construction Cost: $2,900,000 <br />STANDARD FORM 330 (REV. 8/2016) PAGE 2 <br />Section E - Page l 14