E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person) 12. NAME
<br />PAOLA RIVEROS, PE
<br />13. ROLE IN THIS CONTRACTProject Manager; Roadway Streetscape,Sidewalks, Parking, Pavement Evaluation &Repairs, S&M; Civil/Site, Feasibility Studies, Parks and Recreational Facilities, Lighting, Utilities
<br />14. YEARS EXPERIENCE
<br />a.TOTAL
<br />19
<br /> b. WITH CURRENT FIRM
<br />19
<br />15. FIRM NAME AND LOCATION (City and State)R.J. BEHAR & COMPANY, INC. 6861 SW 196th Avenue, Suite 302
<br />Pembroke Pines, FL 33332
<br />16. EDUCATION (Degree and Specialization)B.S. Civil Engineer, Florida International University/2001 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)
<br /> P.E. Florida No.74249/2012 P.E. Washington, D.C., No. 905769/2010
<br />18.OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)Ms. Riveros has been responsible for the preparation of roadway plans, drainage plans and site plans throughout South Florida. Ms. Riveros is
<br />fully knowledgeable of Microstation. Ms. Riveros completed a computer course with introduction to GIS software in the application to
<br />contamination of surface water bodies to determine affected zones by the plume. She has worked in several water and sewer projects.
<br />19. RELEVANT PROJECTS
<br />a.
<br />(1) TITLE AND LOCATION (City and State)SW 136th Street from US-1 to Old Cutler Road Lap Project, Miami-Dade County,
<br />Florida – Village of Palmetto Bay/Florida Department of Transportation (FDOT), District 6
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES 2020 CONSTRUCTION (If applicable) Post Design Ongoing
<br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firmProject Engineer: She was responsible for designing the roadway plans, pavement marking and signing plans, utility coordination, drainage design
<br />and, permitting. The improvements will require milling and resurfacing the existing roadway and pavement widening to accommodate an on-road
<br />dedicated bicycle lane. The primary challenge for this project was accommodating the proposed sidewalks and bicycle lanes in a right of way
<br />constrained corridor. Project Length:1.92 miles; Project #: 434687-1; Cost/Fees Paid: $193,171.00; Construction Cost: $1,700,345.00
<br />b.
<br />(1) TITLE AND LOCATION (City and State)I-595 Mobility Hub Park and Ride, Broward County, Florida - FDOT, District 4
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES 2018 CONSTRUCTION (If applicable) 2019
<br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firmProject Manager responsible for the parking lot design, drainage design, and signing and pavement markings. The scope of work included
<br />modifying the mobility hub to increase and maximize the number of parking slots, review the connections to improve access control, and improve
<br />circulation. The improvements required modification to the existing drainage, lighting, signing and pavement markings, and landscaping. She was
<br />also responsible for the preparation of a Community Awareness Plan, preparing Flyers, and attending a public meeting. Cost/Fees: $86,500
<br />Construction Cost: 900,000
<br />c.
<br />(1) TITLE AND LOCATION (City and State)NE 151st Street Improvements, Miami-Dade County, Florida – Oleta Partners LLC/Miami-Dade County
<br />
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES Ongoing
<br />CONSTRUCTION (If applicable)
<br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firmProject Engineer: She is responsible for assisting with the roadway design, drainage design, signing and pavement markings, signalization,
<br />lighting, wetland assessment, and utility coordination. NE 151st Street is an off-system roadway bound by the Florida Greenbook, for its design
<br />criteria. Drainage design includes a series of interconnected French drains with drainage wells. Project Length: 0.876 miles Cost/Fees Paid:
<br />$498,000.00; Construction Cost: $5,757,000.00.
<br />d.
<br />(1) TITLE AND LOCATION (City and State)Atlantic Boulevard at Rock Island Road, Intersection Improvement, Broward County, Florida – Broward County Construction & Engineering
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES 2013 CONSTRUCTION (If applicable)
<br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firmTraffic Engineer: She performed a traffic analysis to determine the existing Level of Service (LOS) and provide recommendations to improve the
<br />existing deficiencies, which also included projections for the design year, which was performed as part of the design project. Cost/Fees Paid:
<br />$386,000; Construction Cost: $4,100,000 Project Length: 0.51 miles
<br />e.
<br />(1) TITLE AND LOCATION (City and State)City of Lauderdale Lakes Canal System Stabilization Project, Broward County, Florida – City of Lauderdale Lakes
<br />
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES 2017 CONSTRUCTION (If applicable)
<br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firmProject Engineer: Ms. Riveros led the effort to perform the field inspections on land and by boat, prepared the alternative evaluation matrix, and
<br />the final report of the canal evaluation with conclusions and recommendations. She also prepared plans for the improvements. Cost/Fees Paid:
<br />$208,116; Construction Cost: $2,900,000
<br />STANDARD FORM 330 (REV. 8/2016) PAGE 2
<br />Section E - Page l 14
|