Laserfiche WebLink
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />12. NAME <br />ROBERT J. BEHAR, PE <br /> <br /> 13. ROLE IN THIS CONTRACT <br />Principal in Charge; Roadway, Streetscape, <br />Sidewalks, Parking, Pavement Evaluation; Civil/Site, <br />Feasibility Studies, Parks, Lighting; Compliance w/ <br />Federal, State & Local Regulatory Agencies. <br /> <br /> 14. YEARS EXPERIENCE <br /> a. TOTAL <br />45 <br /> <br /> b. WITH CURRENT FIRM <br />20 <br /> <br />15. FIRM NAME AND LOCATION (City and State) <br />R.J. BEHAR & COMPANY, INC. <br />6861 SW 196th Avenue, Suite 302 <br />Pembroke Pines, FL 33332 <br />16. EDUCATION (Degree and Specialization) <br />B.S. Civil Engineering, University of Florida <br />M.E. Civil Engineering, University of Florida <br />17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) <br />P.E. No. 21755 Florida/1980 <br />P.E. No. 19800047 Indiana/1997 <br />P.E. No. 6201043655 Michigan/1997 <br />P.E. No. 19836 Kentucky/1997 <br />P.E. No. E-62643 Ohio/1997 <br />MOT Certified <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />He has been a very active member of various engineering societies. He has served as president of the South Florida Section and Miami-Dade <br />Branch of the American Society of Civil Engineers, Chair of the American Society of Civil Engineers Highway Division, Chair of Florida Institute of <br />Consulting Engineers Transportation Production Committee, and member of the Transportation Research Board’s Geometric Design Committee. <br />He is a voting member of the Florida Greenbook Committee. Mr. Behar was awarded the Ben Watts Partnership Award in 2010. <br />19. RELEVANT PROJECTS <br /> <br />a. <br />(1) TITLE AND LOCATION (City and State) <br />Seawall Design at Tobie Wilson Park – Town of Medley, Florida <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2018 <br />CONSTRUCTION (If applicable) <br /> <br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm <br />Principal in Charge/Project Manager for the structural analysis and design, plans preparation and permitting with SFWMD, USACE. The scope <br />of work included design of approximately 850 feet of new steel bulkhead wall with a concrete cap to be located on the north side of the park <br />along the south bank of the Miami Canal. RJ Behar also assisted with the grant preparation and construction engineering services. <br />Cost/Fees Paid: $112,000.00; Construction Cost: $900,000 (Estimated) <br /> <br />b. <br />(1) TITLE AND LOCATION (City and State) <br />W. 76th Street from Hialeah Gardens Boulevard to W. 36 Avenue, Miami-Dade <br />County, Florida – City of Hialeah <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2017 <br />CONSTRUCTION (If applicable) <br /> <br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm <br />Project Manager who was responsible for the lighting design calculations and lighting plans; signing, marking and channelization plans as well. <br />The scope of this project consisted of roadway reconstruction an d some milling and resurfacing of a two-lane road, curb and gutter type F, <br />valley gutter, new sidewalks, on-street parking, exfiltration drainage systems, storm sewers, sodding, signing, pavement markings, and <br />roadway lighting. This is part of the continuous neighborhood improvement program the City has been conducting for years. Under this <br />program RJ Behar has completed more than 50 miles of City street improvements. Cost/Fees Paid: $50,038; Construction Cost: $1,110,000. <br /> <br />c. <br />(1) TITLE AND LOCATION (City and State) <br />NW 35th Avenue Greenway Enhancement – City of Lauderhill, Florida <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br /> <br />CONSTRUCTION (If applicable) <br />2018 <br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm <br />Principal in Charge for the conversion of a jogging path to a Greenway from NW 35th Avenue from North Broward Boulevard to NW 5 th Place <br />within the City of Lauderhill. The project included decorative elements to the existing asphalt jogging path/trail on the east side of the corridor, <br />along three sections of NW 35th Avenue. As part of the community enhancement features project, there were pedestrian and bicy cle <br />improvements, decorative lighting, ADA compliant sidewalks and curb ramps, landscaping, irrigation, roadway signage, pavement markings, <br />including bicycle lane striping, and street furniture. This is a FDOT Local Agency Program (LAP) Project. Project Length: .569 Miles <br />Cost/Fees Paid: $106,989.00; Construction Cost: $599,982.00; Financial Project Id No.: 431710-1-58-01 <br /> <br />d. <br />(1) TITLE AND LOCATION (City and State) <br />Old Davie School Improvements – Town of Davie, Florida <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2013 <br />CONSTRUCTION (If applicable) <br /> <br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm <br />Project Manager for the civil engineering site design, drainage, utility improvements, including sanitary lift stations and submersible pumps, and <br />site field visits The scope of the project consisted of site design, drainage, parking and utility improvements for an historical school (now <br />converted to a museum) and an adjacent park property. Cost/Fees Paid: $116,528.00 Construction Cost: $1,100,000 <br /> <br />e. <br />(1) TITLE AND LOCATION (City and State) <br />NW 87th Avenue, Miami-Dade County, Florida – Florida Department of <br />Transportation (FDOT), District 6 <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2016 <br />CONSTRUCTION (If applicable) <br />2019 <br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm <br />Principal in Charge/Project Manager for roadway design of new construction and reconstruction of NW 87th Avenue. The project included <br />roadway/traffic control plan (TCP) design, pavement marking and signing, signalization, lighting, drainage and permitting, bridge construction, <br />utility coordination, traffic study, traffic counts, traffic projections, and traffic warrants services. Project length: 2 Miles <br />Cost/Fees Paid: $2,994,823.00; Construction Cost: $34,800,000 (Estimated); FM#: 405615-3-52-01 <br />STANDARD FORM 330 (REV. 8/2016) PAGE 2 <br />Section E - Page | 15