<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person.)
<br />12. NAME
<br />JUAN H. VAZQUEZ, P.E., P.H., BCEE
<br />
<br /> 13. ROLE IN THIS CONTRACT
<br />QA/QC, Drainage, Stormwater Wells, Pumps, Water
<br />Distribution, Wastewater Collection Systems;
<br />Environmental Permitting; Compliance w/ Federal,
<br />State & Local Regulatory Agencies.
<br />
<br /> 14. YEARS EXPERIENCE
<br />
<br /> a. TOTAL
<br />35
<br />
<br /> b. WITH CURRENT FIRM
<br />19
<br />
<br />15. FIRM NAME AND LOCATION (City and State)
<br />R.J. BEHAR & COMPANY, INC.
<br />6861 SW 196th Avenue, Suite 302
<br />Pembroke Pines, FL 33332
<br />16. EDUCATION (Degree and Specialization)
<br />B.S., Civil Engineering, University of Puerto Rico/1985
<br />Professional Hydrologist – License No. 05-H-1653
<br />Board Certified Environmental Engineer 07-20009/2007
<br />17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)
<br />P.E. No. 51143 Florida/1996
<br />P.E. No. 0402 025604 Virginia/1994
<br />
<br />P.E. No. 11385 Puerto Rico/1989
<br />P.E. No. 46482 Michigan/1999
<br />
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />Mr. Vazquez is a Professional Hydrologist (PH) and a Board Certified Environmental Engineer (BCEE) specializing in water supply and waste
<br />water. For the eleventh year in a row, Mr. Vazquez is in the “Who’s Who book of Environmental Engineering, 2019.” He is a past president of the
<br />Association of Engineers and Land Surveyors of Puerto Rico, Florida Chapter (CIAPR). He was recognized as the Distinguished Engineer in
<br />2014 by the Florida Chapter of the CIAPR. He is a past chair of the ACEC-FL South Florida Water Management District Liaison Subcommittee.
<br />Mr. Vazquez is a member of the Florida Greenbook Drainage Subcommittee.
<br />
<br />19. RELEVANT PROJECTS
<br />
<br />a.
<br />(1) TITLE AND LOCATION (City and State)
<br />Riverview Pump Station New Generator, Fire Suppression and Main Switch
<br />Disconnect, City of Miami, Florida
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />Ongoing
<br />CONSTRUCTION (If applicable)
<br />
<br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Project Manager and Engineer of Record for civil and structural design to provide engineering services for the replacement of the Riverview Pump
<br />Station Emergency Generator and pumps interconnection in the City of Miami. The pump station is part of the city's stormwater system. The
<br />project also includes a subconsultant design of a new Fire Suppressant System and Main Switch Disconnect for the Pump Station.
<br />Cost/Fees Paid: $74,200; Construction Cost: $935,000 (Est.); Project #: M-0127
<br />
<br />b.
<br />(1) TITLE AND LOCATION (City and State)
<br />Tressler Street Drainage Improvements - City of North Miami, Florida
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2019
<br />CONSTRUCTION (If applicable)
<br />
<br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Project Manager/QC Assurance for this project. The improvements included upgrading existing drainage infrastructure by installing exfiltration
<br />trenches, solid piping, installation of new catch basin structures with baffles, regrading of swale areas, replacement of existing hand built catch
<br />basins, swale retrofit, and other Best Management Practices (BMPs) along Tressler Street including pervious pavements for swale reconstruction.
<br />Also included estimates, utility coordination, permitting and bid assistance. Cost/Fees Paid: $90,949; Construction Cost: $1,100,000 (Estimated).
<br />
<br />c
<br />(1) TITLE AND LOCATION (City and State)
<br />Waterline Design along NE16th Ave, NE 146 St, and NE 18 Ave – City of North
<br />Miami
<br />
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2019
<br />CONSTRUCTION (If applicable)
<br />
<br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Engineer of Record: He conducted quality control reviews of the water line plans, and specifications. The project includes approximately 3,255 ft
<br />of new 16-inch DIP water line. Cost/Fees Paid: $87,600; Construction Cost: $904,352.
<br />d.
<br />(1) TITLE AND LOCATION (City and State)
<br />MS4 NPDES Stormwater Assessment Program, City of Hialeah, Florida
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2018
<br />CONSTRUCTION (If applicable)
<br />
<br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Project Manager for the preparation of the stormwater assessment program, as required by the Municipal Separate Storm Sewer System Permit
<br />that was issued June 30, 2016. This permit covers all areas located within the political boundary of the City of Hialeah that is served by the MS4
<br />owned or operated by the City. The purpose of this assessment program is to provide information for the City of Hialeah to determine the overall
<br />effectiveness of its Stormwater Management Program (SWMP) in reducing stormwater pollutant loadings from its Municipal Separate Storm
<br />Sewer System (MS4) to receiving water bodies. Cost/Fees Paid: $9,772; Construction Cost: N/A.
<br />e.
<br />(1) TITLE AND LOCATION (City and State)
<br />Lakeshore and River Run Park Improvements – City of Miramar
<br />
<br />
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2017
<br />CONSTRUCTION (If applicable)
<br />
<br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Project Manager and EOR for master planning and civil design of the improvements. Improvements included building modifications, additional
<br />parking, new lighting, grading and drainage and reconfiguration of existing parking, and park appurtenances such as benches, trash collectors,
<br />new fountains and playgrounds. Cost/Fees Paid: $118,604.64; Construction Cost: $700,000.00
<br /> STANDARD FORM 330 (REV. 8/2016) PAGE 2
<br />
<br />Section E - Page | 16
|