Laserfiche WebLink
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />12. NAME <br />RAFAEL DE ARAZOZA, PE, PTOE, CPM <br /> <br /> 13. ROLE IN THIS CONTRACT <br />Transportation Planning/Traffic <br />Studies; Compliance w/ Federal, State <br />& Local Regulatory Agencies <br /> <br /> 14. YEARS EXPERIENCE <br /> a. TOTAL <br />44 <br /> <br /> b. WITH CURRENT FIRM <br />10 <br /> <br />15. FIRM NAME AND LOCATION (City and State) <br />R.J. BEHAR & COMPANY, INC. <br />6861 SW 196th Avenue, Suite 302 <br />Pembroke Pines, FL 33332 <br />16. EDUCATION (Degree and Specialization) <br />BS Civil Engineering, Florida International University, 1975 <br />Florida State University/FDOT, Certified Public Manager (CPM), 1989 <br />17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) <br />PE Florida License No. 24487/1980 <br />Professional Traffic Operations Engineer (PTOE) No. 2852/2010 <br />Florida State/FDOT, Certified Public Manager (CPM)/1989 <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />Mr. De Arazoza experience includes supervising and providing technical guidance and support to transportation planning, roadway design and <br />traffic engineering personnel throughout his career. He provided and continues to provide management and technical support fo r traffic <br />engineering and safety studies, transportation planning, land use planning, including public involvement and coordination with local governments. <br />He provided quality assurance and quality control on all of the above activities. He has worked in both private a nd governmental agencies, <br />including FDOT and Broward County. Mr. De Arazoza has held many high level management positions throughout his career. He is well-versed <br />in traffic engineering and roadway design standards and procedures. <br /> <br /> <br />1 9. RELEVANT PROJECTS <br /> <br />a. <br />(1) TITLE AND LOCATION (City and State) <br />City Center Traffic Impact Study, City of Pembroke Pines, Florida <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2019 <br />CONSTRUCTION (If applicable) <br /> <br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm <br />Project Manager responsible for the traffic impact study to determine the impact of the vehicular traffic generated from a proposed development <br />project. The scope of work included field reviews, data collection, signal timing, LOS Analysis, Review of Traffic Impacts, and compiling a <br />report. The analyses included eight intersections. Cost/Fees Paid: $57,873.75; Construction Cost: Study. <br /> <br />b. <br /> <br />(1) TITLE AND LOCATION (City and State) <br />Palmetto Bay Village Center & Old Cutler Bay Road Traffic Study, Miami-Dade <br />County, Florida – Village of Palmetto Bay <br /> <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2018 <br />CONSTRUCTION (If applicable) <br /> <br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm <br />Project Manager: He was responsible for reviews of the studies to ensure that all pertinent data and analyses complied with applicable <br />standards, policies, procedures and guidelines; such as the latest versions of the Highway Capacity Manual, the Florida Department of <br />Transportation Quality/Level-of-Service Handbook, the Institute of Transportation Engineers Trip Generation 9 th Edition and the Village. RJ <br />Behar performed reviews of the Traffic Impact Study, Traffic Calming Studies, Traffic Operations/Safety Studies, and provided a report with the <br />findings, comments and recommendations. Cost/Fees Paid: $2,920.00; Construction Cost: N/A; Project Length: 41.59 Acres <br /> <br />c. <br />(1) TITLE AND LOCATION (City and State) <br />Districtwide Traffic Operations/Safety Studies - Florida Department of <br />Transportation (FDOT), District 6 <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2018 <br />CONSTRUCTION (If applicable) <br /> <br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm <br />Project Manager who was responsible for performing traffic operations and safety studies. RJ Behar successfully completed 58 studies, <br />identifying operational and safety improvements, which included Crash Analysis, Highway Lighting Study, Fatal Crash Review, Intersection <br />Safety and Traffic Operations Study, Roadway Lighting Field Inventory, Speed Data Collection, Spot Speed Study and Safe Curve Speed <br />Study, Vehicle Gap Analysis, Traffic Data Collection, Road Safety Audit, Intersection Quality Assessment Study, Intersection Improvements, <br />Traffic Signal Warrant Analysis. Project Cost: TWO varies. <br /> <br />d. <br />(1) TITLE AND LOCATION (City and State) <br />I-95 at 6th Avenue Project Development & Environmental (PD&E) Study, Lake <br />Worth, Palm Beach County, Florida – FDOT, District 4 <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2018 <br />CONSTRUCTION (If applicable) <br /> <br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm <br />Traffic Engineer Task Manager for the IOAR as part of the PD&E study of the Interchange Improvements. The study included traf fic projections, <br />public involvement and included all the ramps within the subject interchange. This IOAR along with the proposed improvements received <br />approval by FDOT Central Office. Project #: 436963-1-22-01 Contract No.: C9N55; <br />Cost/Fees Paid: $786,766.00; Construction Cost: $14,000,000. <br /> <br />e. <br />(1) TITLE AND LOCATION (City and State) <br />Traffic Engineering Services and Highway Functional Class; Function Study, <br />Broward County, Florida – City of Miramar <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2015 <br />CONSTRUCTION (If applicable) <br /> <br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm <br />Project Manager responsible for successfully completing a signal warrant study and the Roadway Functional Classification & Jurisdictional <br />Transfers studies for the City as well. Cost/Fees Paid: $30,247; Construction Cost: N/A <br />STANDARD FORM 330 (REV. 8/2016) PAGE 2 <br />Section E - Page | 17