|
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person.)
<br />12. NAME
<br />RAFAEL DE ARAZOZA, PE, PTOE, CPM
<br />
<br /> 13. ROLE IN THIS CONTRACT
<br />Transportation Planning/Traffic
<br />Studies; Compliance w/ Federal, State
<br />& Local Regulatory Agencies
<br />
<br /> 14. YEARS EXPERIENCE
<br /> a. TOTAL
<br />44
<br />
<br /> b. WITH CURRENT FIRM
<br />10
<br />
<br />15. FIRM NAME AND LOCATION (City and State)
<br />R.J. BEHAR & COMPANY, INC.
<br />6861 SW 196th Avenue, Suite 302
<br />Pembroke Pines, FL 33332
<br />16. EDUCATION (Degree and Specialization)
<br />BS Civil Engineering, Florida International University, 1975
<br />Florida State University/FDOT, Certified Public Manager (CPM), 1989
<br />17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)
<br />PE Florida License No. 24487/1980
<br />Professional Traffic Operations Engineer (PTOE) No. 2852/2010
<br />Florida State/FDOT, Certified Public Manager (CPM)/1989
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />Mr. De Arazoza experience includes supervising and providing technical guidance and support to transportation planning, roadway design and
<br />traffic engineering personnel throughout his career. He provided and continues to provide management and technical support fo r traffic
<br />engineering and safety studies, transportation planning, land use planning, including public involvement and coordination with local governments.
<br />He provided quality assurance and quality control on all of the above activities. He has worked in both private a nd governmental agencies,
<br />including FDOT and Broward County. Mr. De Arazoza has held many high level management positions throughout his career. He is well-versed
<br />in traffic engineering and roadway design standards and procedures.
<br />
<br />
<br />1 9. RELEVANT PROJECTS
<br />
<br />a.
<br />(1) TITLE AND LOCATION (City and State)
<br />City Center Traffic Impact Study, City of Pembroke Pines, Florida
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2019
<br />CONSTRUCTION (If applicable)
<br />
<br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Project Manager responsible for the traffic impact study to determine the impact of the vehicular traffic generated from a proposed development
<br />project. The scope of work included field reviews, data collection, signal timing, LOS Analysis, Review of Traffic Impacts, and compiling a
<br />report. The analyses included eight intersections. Cost/Fees Paid: $57,873.75; Construction Cost: Study.
<br />
<br />b.
<br />
<br />(1) TITLE AND LOCATION (City and State)
<br />Palmetto Bay Village Center & Old Cutler Bay Road Traffic Study, Miami-Dade
<br />County, Florida – Village of Palmetto Bay
<br />
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2018
<br />CONSTRUCTION (If applicable)
<br />
<br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Project Manager: He was responsible for reviews of the studies to ensure that all pertinent data and analyses complied with applicable
<br />standards, policies, procedures and guidelines; such as the latest versions of the Highway Capacity Manual, the Florida Department of
<br />Transportation Quality/Level-of-Service Handbook, the Institute of Transportation Engineers Trip Generation 9 th Edition and the Village. RJ
<br />Behar performed reviews of the Traffic Impact Study, Traffic Calming Studies, Traffic Operations/Safety Studies, and provided a report with the
<br />findings, comments and recommendations. Cost/Fees Paid: $2,920.00; Construction Cost: N/A; Project Length: 41.59 Acres
<br />
<br />c.
<br />(1) TITLE AND LOCATION (City and State)
<br />Districtwide Traffic Operations/Safety Studies - Florida Department of
<br />Transportation (FDOT), District 6
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2018
<br />CONSTRUCTION (If applicable)
<br />
<br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Project Manager who was responsible for performing traffic operations and safety studies. RJ Behar successfully completed 58 studies,
<br />identifying operational and safety improvements, which included Crash Analysis, Highway Lighting Study, Fatal Crash Review, Intersection
<br />Safety and Traffic Operations Study, Roadway Lighting Field Inventory, Speed Data Collection, Spot Speed Study and Safe Curve Speed
<br />Study, Vehicle Gap Analysis, Traffic Data Collection, Road Safety Audit, Intersection Quality Assessment Study, Intersection Improvements,
<br />Traffic Signal Warrant Analysis. Project Cost: TWO varies.
<br />
<br />d.
<br />(1) TITLE AND LOCATION (City and State)
<br />I-95 at 6th Avenue Project Development & Environmental (PD&E) Study, Lake
<br />Worth, Palm Beach County, Florida – FDOT, District 4
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2018
<br />CONSTRUCTION (If applicable)
<br />
<br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Traffic Engineer Task Manager for the IOAR as part of the PD&E study of the Interchange Improvements. The study included traf fic projections,
<br />public involvement and included all the ramps within the subject interchange. This IOAR along with the proposed improvements received
<br />approval by FDOT Central Office. Project #: 436963-1-22-01 Contract No.: C9N55;
<br />Cost/Fees Paid: $786,766.00; Construction Cost: $14,000,000.
<br />
<br />e.
<br />(1) TITLE AND LOCATION (City and State)
<br />Traffic Engineering Services and Highway Functional Class; Function Study,
<br />Broward County, Florida – City of Miramar
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2015
<br />CONSTRUCTION (If applicable)
<br />
<br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Project Manager responsible for successfully completing a signal warrant study and the Roadway Functional Classification & Jurisdictional
<br />Transfers studies for the City as well. Cost/Fees Paid: $30,247; Construction Cost: N/A
<br />STANDARD FORM 330 (REV. 8/2016) PAGE 2
<br />Section E - Page | 17
|