|
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person)
<br /> 12. NAME HANS MURZI, PE, CFM
<br />
<br /> 13. ROLE IN THIS CONTRACT
<br />Drainage Improvements, Stormwater Wells,
<br />Pumps, Water Distribution, Wastewater
<br />Collection Systems; Environmental
<br />Permitting
<br />
<br /> 14. YEARS EXPERIENCE
<br /> a. TOTAL
<br />18
<br />
<br /> b. WITH CURRENT FIRM
<br />6
<br />
<br />15. FIRM NAME AND LOCATION (City and State)
<br />R.J. BEHAR & COMPANY, INC.
<br />6861 SW 196th Avenue, Suite 302
<br />Pembroke Pines, FL 33332
<br />16. EDUCATION (Degree and Specialization)
<br />M.S. Environmental Engineering Florida International
<br />University/2002
<br />B.S. Chemical Engineering, University of Los Andes, Merida,
<br />Venezuela/2000
<br />
<br /> 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)
<br />P.E. Florida License No. 67767/2008
<br />Certified Floodplain Manager
<br />Qualified Stormwater Management Inspector
<br />
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />Mr. Murzi is a water resources engineer with experience in hydrologic/hydraulic analysis, rural and roadway drainage design, drainage field
<br />inspections, drainage plan reviews and QA/QC of water resources models and drainage reports. He is experienced in several computer programs
<br />such as XPSWMM, HEC-RAS, AdICPR, MIKE SHE/MIKE 11, ASAD, ArcGIS. He is also member of the FICE Water Resources Committee.
<br />19. RELEVANT PROJ ECTS
<br />
<br />a.
<br />(1) TITLE AND LOCATION (City and State)
<br />Lyons Park Neighborhood Improvement Project, Pompano Beach, Fl orida – City
<br />of Pompano Beach
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />Ongoing
<br />CONSTRUCTION (If applicable)
<br />
<br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Project Engineer: He is responsible for the preparation of the stormwater design of the proposed improvements. The project area suffers from
<br />flooding problems as documented in the City Stormwater Master Plan (SWMP). This project intends to improve the drainage systems within the
<br />project area. Cost/Fees Paid: Cost/Fees Paid: $410,000.00; Construction Cost: $10,800,000 (Estimate).
<br />
<br />b.
<br />(1) TITLE AND LOCATION (City and State)
<br />Central Broward Water Control District (CBWCD) Engineer Services – Broward
<br />County, Florida
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />Ongoing
<br />CONSTRUCTION (If applicable)
<br />
<br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />District Engineer responsible for the reviewing plat submittals, paving and grading plans and as-built plans for development permits in the
<br />CBWCD. Responsibilities include; ensuring that all site plans comply with CBWCD engineering criteria, review and evaluate requests for
<br />variances, provide technical support to CBWCD Board during public hearings for variances request. Site visits are performed as necessary as
<br />well as coordination with CBWCD staff in order to ensure that site development requirements are met. Project Length: Not applicable
<br />Cost/Fees Paid: $425,948.07 (as 12/20/2019); Construction Cost: Not Applicable.
<br />
<br />c.
<br />(1) TITLE AND LOCATION (City and State)
<br />Copans Road Wastewater Transmission System Design, Broward County,
<br />Florida – City of Coconut Creek
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2019
<br />CONSTRUCTION (If applicable)
<br />Ongoing
<br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Project Manager: He is responsible for the preparation of permit packages, coordination of survey, utility locates (SUE), cost estimates, and
<br />specifications. This phase will include a new force main between LS 12 and an existing Broward County 54” diameter force main which conveys
<br />flows east along Sample Road to a termination point at the NRWWTP, and a rehabilitation of the force main from LS 12 to the connection from
<br />the Wynmoor Community, just west of the Florida Turnpike. Cost/Fees Paid: $88,000; Construction Cost: $3,000,000 (Estimated)
<br />
<br />d.
<br />(1) TITLE AND LOCATION (City and State)
<br />Reclaimed Waterline Extension - City of Coconut Creek
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2018
<br />CONSTRUCTION (If applicable)
<br />
<br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Deputy Project Manager/Project Engineer. He revised the plans and completed the bid packages and permitting for the reclaimed line plans,
<br />and specifications. He also provided services during construction, conducted inspections and prepared the Record Drawings. The project
<br />consists of the design for approximately 6,900 LF of a 16” diameter reclaimed waterline for connection to a proposed City reclaimed water main
<br />(16”) at the southeast corner of Lyons Road and Wiles Road for irrigation of City play fields and green areas . Cost/Fees Paid: $119,650;
<br />Construction Cost: $1,385,000
<br />
<br />e.
<br />(1) TITLE AND LOCATION (City and State)
<br />Booster Stations Seawall Repair #1, Miami-Dade County, Florida – Town of
<br />Medley
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2019
<br />CONSTRUCTION (If applicable)
<br />2020
<br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Project Engineer responsible for the preparation of the fill and dredge plans and permitting packages for South Florida Water Management
<br />District (ERP and ROW) and United States Army Corps of Engineers (Sections 404 and 408). The project included repair of damaged seawalls
<br />after hurricane Irma. Cost/Fees Paid: $41,961.37; Construction Cost: $134,248.00 (Estimate).
<br />STANDARD FORM 330 (REV. 8/2016) PAGE 2
<br />Section E - Page | 18
|