E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person)
<br /> 12. NAME
<br /> ELMER CARDENAS, PE, CEI
<br />
<br /> 13. ROLE IN THIS CONTRACT
<br />Drainage, Stormwater Wells, Pumps, Water
<br />Distribution, Wastewater Collection Systems;
<br />Environmental Permitting
<br />
<br /> 14. YEARS EXPERIENCE
<br /> a. TOTAL
<br />31
<br />
<br /> b. WITH CURRENT FIRM
<br />6
<br />
<br />15. FIRM NAME AND LOCATION (City and State)
<br />R.J. BEHAR & COMPANY, INC.
<br />6861 SW 196th Avenue, Suite 302
<br />Pembroke Pines, FL 33332
<br />16. EDUCATION (Degree and Specialization)
<br />M.S. Environmental Engineering, Florida International
<br />University/2001
<br />B.S. Civil Engineering, National University of Engineering, Lima,
<br />Peru/1984
<br />
<br /> 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)
<br />▪ PE Florida License No. 62988/2005
<br />▪ Certified Environmental Inspector, Environmental
<br />Assessment Association, EA-17007, 09/2018
<br />
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />He has extensive experience in environmental engineering and utility projects and has designed and supervised construction of water
<br />distribution systems and drinking wells. He has experience with the use of Environmental models: SWMM (stormwater management model),
<br />and HSSM (hydrocarbon spill screening model) and hydraulic models AdICPR, ASAD and HEC-RAS.
<br />19. RELEV ANT PROJECTS
<br />
<br />a.
<br />(1) TITLE AND LOCATION (City and State)
<br />Lyons Park Neighborhood Improvement Project, Broward County, FL – City of
<br />Pompano Beach
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2016
<br />CONSTRUCTION (If applicable)
<br />
<br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Project Engineer for the preparation of the Basis of Design Report (BODR), sanitary sewer design of the wastewater collection system and
<br />schematic design of proposed water improvements. The purpose of the proj ect is to improve the drainage system, replace sanitary sewer lines,
<br />and replace the water service lines to meet the newer city standards. Services include data collection, utility coordination, permitting, and cost
<br />estimating. Cost/Fees Paid: $66,179.71 – Construction Cost: $10,800,000 (Estimate).
<br />
<br />b.
<br />(1) TITLE AND LOCATION (City and State)
<br />Gilbert Samson Ocean Front Park, Miami-Dade County, Florida – City of Sunny
<br />Isles Beach
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2018
<br />CONSTRUCTION (If applicable)
<br />
<br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Project Engineer for the design of the sanitary lift station. Scope of services included the design and permitting of the proposed sewer line and
<br />grinder pump on the property, in conjunction with managing all the design aspects of the project. RJ Behar is also responsible for the site
<br />geometry, grading, and drainage design. Project Length: 2.09 Acres; Cost/Fees Paid: $362,632; Construction Cost: $3.8 Million.
<br />
<br />c.
<br />(1) TITLE AND LOCATION (City and State)
<br />Tressler Street Drainage Improvements, City of North Miami
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2018
<br />CONSTRUCTION (If applicable)
<br />
<br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Engineer of Record for this project. The improvements included upgrading existing drainage infrastructure by installing exfiltration trenches, solid
<br />piping, installation of new catch basin structures with baffles, regrading of swale areas, replacement of existing hand-built catch basins, swale
<br />retrofit, and other Best Management Practices (BMPs) along Tressler Street including pervious pavements for swale reconstruction.
<br />Project Length: 0.23 miles ± Cost/Fees Paid: $90,949 | Construction Cost: $1,100,000 (Estimated).
<br />
<br />d.
<br />(1) TITLE AND LOCATION (City and State)
<br />US-1 Lateral Ditch Restoration, Indian River County, Florida – FDOT, District 4
<br />
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2016
<br />CONSTRUCTION (If applicable)
<br />
<br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Project Engineer: He assisted with the preparation of the permit packages environmental resource permitting and for the wetland impacts. This
<br />project included the rehabilitation of 12 outfall ditches in Indian River County. The ditches provide runoff discharge for US-1 and adjacent areas.
<br />The purpose of this project was to analyze the existing drainage conditions and re-establish or improve the original design section for each ditch
<br />with the goal of restoring adequate drainage along US-1. Project Length: Not Applicable
<br />Project #: 431152-1-52-01; Cost/Fees Paid: $336,540; Construction Cost: $1,100,000 (Estimated).
<br />
<br />e.
<br />(1) TITLE AND LOCATION (City and State)
<br />Lift Station 107 Rehabilitation, Broward County, Florida – City of Sunrise
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2015
<br />CONSTRUCTION (If applicable)
<br />
<br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Project Engineer for the preparation of the site plans and civil design of the project. The project involved rehabilitating the existing lift station,
<br />converting the existing wet pit/dry pit design to a submersible pump configuration and partially filling the existing dry well, converting it to a valve
<br />vault. Cost/Fees Paid: $11,697.00; Construction Cost: Unknown.