Laserfiche WebLink
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person) <br /> 12. NAME <br /> ELMER CARDENAS, PE, CEI <br /> <br /> 13. ROLE IN THIS CONTRACT <br />Drainage, Stormwater Wells, Pumps, Water <br />Distribution, Wastewater Collection Systems; <br />Environmental Permitting <br /> <br /> 14. YEARS EXPERIENCE <br /> a. TOTAL <br />31 <br /> <br /> b. WITH CURRENT FIRM <br />6 <br /> <br />15. FIRM NAME AND LOCATION (City and State) <br />R.J. BEHAR & COMPANY, INC. <br />6861 SW 196th Avenue, Suite 302 <br />Pembroke Pines, FL 33332 <br />16. EDUCATION (Degree and Specialization) <br />M.S. Environmental Engineering, Florida International <br />University/2001 <br />B.S. Civil Engineering, National University of Engineering, Lima, <br />Peru/1984 <br /> <br /> 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) <br />▪ PE Florida License No. 62988/2005 <br />▪ Certified Environmental Inspector, Environmental <br />Assessment Association, EA-17007, 09/2018 <br /> <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />He has extensive experience in environmental engineering and utility projects and has designed and supervised construction of water <br />distribution systems and drinking wells. He has experience with the use of Environmental models: SWMM (stormwater management model), <br />and HSSM (hydrocarbon spill screening model) and hydraulic models AdICPR, ASAD and HEC-RAS. <br />19. RELEV ANT PROJECTS <br /> <br />a. <br />(1) TITLE AND LOCATION (City and State) <br />Lyons Park Neighborhood Improvement Project, Broward County, FL – City of <br />Pompano Beach <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2016 <br />CONSTRUCTION (If applicable) <br /> <br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm <br />Project Engineer for the preparation of the Basis of Design Report (BODR), sanitary sewer design of the wastewater collection system and <br />schematic design of proposed water improvements. The purpose of the proj ect is to improve the drainage system, replace sanitary sewer lines, <br />and replace the water service lines to meet the newer city standards. Services include data collection, utility coordination, permitting, and cost <br />estimating. Cost/Fees Paid: $66,179.71 – Construction Cost: $10,800,000 (Estimate). <br /> <br />b. <br />(1) TITLE AND LOCATION (City and State) <br />Gilbert Samson Ocean Front Park, Miami-Dade County, Florida – City of Sunny <br />Isles Beach <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2018 <br />CONSTRUCTION (If applicable) <br /> <br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm <br />Project Engineer for the design of the sanitary lift station. Scope of services included the design and permitting of the proposed sewer line and <br />grinder pump on the property, in conjunction with managing all the design aspects of the project. RJ Behar is also responsible for the site <br />geometry, grading, and drainage design. Project Length: 2.09 Acres; Cost/Fees Paid: $362,632; Construction Cost: $3.8 Million. <br /> <br />c. <br />(1) TITLE AND LOCATION (City and State) <br />Tressler Street Drainage Improvements, City of North Miami <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2018 <br />CONSTRUCTION (If applicable) <br /> <br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm <br />Engineer of Record for this project. The improvements included upgrading existing drainage infrastructure by installing exfiltration trenches, solid <br />piping, installation of new catch basin structures with baffles, regrading of swale areas, replacement of existing hand-built catch basins, swale <br />retrofit, and other Best Management Practices (BMPs) along Tressler Street including pervious pavements for swale reconstruction. <br />Project Length: 0.23 miles ± Cost/Fees Paid: $90,949 | Construction Cost: $1,100,000 (Estimated). <br /> <br />d. <br />(1) TITLE AND LOCATION (City and State) <br />US-1 Lateral Ditch Restoration, Indian River County, Florida – FDOT, District 4 <br /> <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2016 <br />CONSTRUCTION (If applicable) <br /> <br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm <br />Project Engineer: He assisted with the preparation of the permit packages environmental resource permitting and for the wetland impacts. This <br />project included the rehabilitation of 12 outfall ditches in Indian River County. The ditches provide runoff discharge for US-1 and adjacent areas. <br />The purpose of this project was to analyze the existing drainage conditions and re-establish or improve the original design section for each ditch <br />with the goal of restoring adequate drainage along US-1. Project Length: Not Applicable <br />Project #: 431152-1-52-01; Cost/Fees Paid: $336,540; Construction Cost: $1,100,000 (Estimated). <br /> <br />e. <br />(1) TITLE AND LOCATION (City and State) <br />Lift Station 107 Rehabilitation, Broward County, Florida – City of Sunrise <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2015 <br />CONSTRUCTION (If applicable) <br /> <br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm <br />Project Engineer for the preparation of the site plans and civil design of the project. The project involved rehabilitating the existing lift station, <br />converting the existing wet pit/dry pit design to a submersible pump configuration and partially filling the existing dry well, converting it to a valve <br />vault. Cost/Fees Paid: $11,697.00; Construction Cost: Unknown. <br />STANDARD FORM 330 (REV. 8/2016) PAGE 2 <br />Section E - Page | 19