|
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person)
<br />12. NAME
<br />JOSE A PEÑA-RAMOS, PE
<br /> 13. ROLE IN THIS CONTRACT
<br />Bridges, Structural Systems, Seawall,
<br />Buildings, Water & Wastewater Plants,
<br />Misc. Structures; Rehabilitation &
<br />Strengthening Existing Structures;
<br />Threshold Inspections; Cost Estimating
<br /> 14. YEARS EXPERIENCE
<br /> a. TOTAL
<br />25
<br /> b. WITH CURRENT FIRM
<br />2
<br />
<br />15. FIRM NAME AND LOCATION (City and State)
<br />R.J. BEHAR & COMPANY, INC.
<br />6861 SW 196th Avenue, Suite 302
<br />Pembroke Pines, Florida 33332
<br />16. EDUCATION (DEGREE AND SPECIALIZATION)
<br />M. S. Structural Engineering, Polytechnic University of Puerto Rico, 2012
<br />B. S. Civil Engineering, Polytechnic University of Puerto Rico/1993
<br />
<br /> 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
<br />PE Florida License # 67863
<br />PE Puerto Rico License #15747
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />Mr. Peña performs structural engineering calculations and reviews structural pl ans. He has worked for the US Department of Urban
<br />Development, US Coast Guard, US Army Corps of Engineers, Federal Highway Administration and as a consultant. His experience
<br />included Florida and Puerto Rico. He has performed project engineering and structural design and support required for the preparation
<br />of plans and specifications for civil works projects including bridges, culverts, pump stations, spillways, retaining walls, and ancillary
<br />buildings.
<br />19. RELEVANT PROJECTS
<br />
<br />a.
<br />(1) TITLE AND LOCATION (City and State)
<br />Materials Storage Facility at Water Treatment Plant, Palm Beach County, Florida –
<br />Village of Palm Springs
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2020 CONSTRUCTION (If applicable)
<br />
<br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Structural Engineer of Record: He was responsible for preparing the design for construction plans of a cast in place structure to serve as a material
<br />storage facility within the property of the Village of Palm Springs Main Water Plant. Scope of services included site and structural design, cost
<br />estimates, specifications. Cost/Fees Paid: $5,370; Construction Cost: $120,000 (Estimate).
<br />
<br />b.
<br />(1) TITLE AND LOCATION (City and State)
<br />Paint Two Bridges of Turnpike Main Line over Rim Ditch Canal (C-24) in St. Lucie
<br />County, Turnpike Enterprise
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />Ongoing
<br />CONSTRUCTION (If applicable)
<br />
<br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Structural Engineer of Record in charge of the design for construction plans and specification package to facilitate the repainting of the structural
<br />steel components and the recoating of the concrete surfaces of the bridges and adjacent walls located on or over the SR 91 (Florida’s Turnpike) in
<br />St. Lucie County. He conducted the field inspection, prepared the inspection reports and is supervising on the plans preparation.
<br />Project #:100853; Project Length: .06 Miles; Cost/Fees Paid: $81,125.00; Construction Cost: $986,274.00 (Estimate).
<br />
<br />c.
<br />(1) TITLE AND LOCATION (City and State)
<br />Cypress Weir 1 (Gold4A) Relocation Design, Naples, Florida, South Florida Water
<br />Management District
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />Ongoing
<br />CONSTRUCTION (If applicable)
<br />
<br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Structural Engineer of Record in charge of structural and civil design. The project is to relocate Cypress Canal Weir #1 (GOLD4A), in Naples, FL.
<br />The new project will include the construction of a new locally and remotely operated water control structure in the new alignment of Cypress Canal,
<br />approximately 2000 ft east of the existing weir. The new structure includes a bridge over the Cypress Canal, new gates, control buildings, stilling
<br />well platforms on concrete piles and miscellaneous appurtenances. Cost/Fees Paid: $378,925 Construction Cost: $3,000,000 (Estimate).
<br />
<br />d.
<br />(1) TITLE AND LOCATION (City and State)
<br />SR 845/Powerline Road at NW 59th Court Intersection, Palm Beach County, Florida
<br />– FDOT, District 4
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2019
<br />Post Design Ongoing
<br />CONSTRUCTION (If applicable)
<br />
<br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Structural Engineer of Record in charge of preparing the design for construction plans for the special foundation for the mast-arm, a multi-post and
<br />light pole foundations. Project Length: Intersection. Project #: 441381-1-32-01; Cost/Fees Paid: $189,683.00; Construction Cost: $589,516.59.
<br />e.
<br />(1) TITLE AND LOCATION (City and State)
<br />B 134 Paint Building, Palm Beach County, Florida – SFWMD
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2018 CONSTRUCTION (If applicable)
<br />
<br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Provided quality control review of structural calculations. RJ Behar provided structural engineering services for the project which included: wind
<br />loading calculations on the pre-fabricated building, and foundation calculations and reinforcement design. RJ Behar input will be used in produci ng
<br />plans and SFWMD standard specifications will be used to tailor towards this project. RJ Behar provided input in the engineering design report.
<br />Cost/Fees Paid: $23,400.00 – Construction Cost: $444,900.00.
<br />STANDARD FORM 330 (REV. 8/2016) PAGE 2
<br />Section E - Page | 20
|