<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person)
<br />12. NAME
<br />CARMELO J. RAMOS, MS, PE
<br /> 13. ROLE IN THIS CONTRACT
<br />Civil, Electrical Engineer, Lighting; Pumps
<br /> 14. YEARS EXPERIENCE
<br /> a. TOTAL
<br />12
<br /> b. WITH CURRENT FIRM
<br />1
<br />15. FIRM NAME AND LOCATION (City and State)
<br />R.J. BEHAR & COMPANY, INC.
<br />6861 SW 196th Avenue, Suite 302
<br />Pembroke Pines, Florida 33332
<br />16. EDUCATION (Degree and Specialization)
<br />M.S. Engineering Management, Polytechnic University of Puerto Rico 2012
<br />B.S. Electrical Engineering, Polytechnic University of Puerto Rico 2007
<br />
<br />
<br /> 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)
<br /> Florida P.E. License No. 77953
<br />
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />Mr. Ramos is a Senior Electrical Engineer with experience in planning, design, construction, alteration, maintenance, repairs and life
<br />cycle support of building assets. He has experience with high voltage power distribution, electrical design for commercial, residential
<br />and military facilities. At RJ Behar, he provides support with electrical and lighting design of sites and building facilities. He is proficient
<br />in the software skills of IBM Maximo, AutoCAD, Solid Work, Microsoft Office, and multiple Project Management Programs.
<br />
<br />19. RELEVANT PROJECTS
<br />
<br />a.
<br />(1) TITLE AND LOCATION (City and State)
<br />Cypress Canal Weir #1 (GOLD4A Relocation Design, Collier County, Florida –
<br />South Florida Water Management District (SFWMD)
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2019 CONSTRUCTION (If applicable)
<br />Ongoing
<br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Senior Electrical Engineer: The new project will include the construction of a new locally and remotely operated water control structure in the new
<br />alignment of Cypress Canal, approximately 2,000’ east of the existing weir. Mr. Ramos is in charge of the electrical design for the control building,
<br />gates, stilling wells, site, and site illumination. He is assisting with the FP&L coordination, electrical design, electrical elements of the cost estimates
<br />and the specifications. Cost/Fees Paid: $378,925 Construction Cost: $3,000,000
<br />
<br />b.
<br />(1) TITLE AND LOCATION (City and State)
<br />Copans Road Wastewater Transmission System Design - City of Coconut Creek
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2019
<br />CONSTRUCTION (If applicable)
<br />Ongoing
<br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Senior Electrical Engineer. He was responsible for electrical design for the installation of a magnetic flow meter for Lift Station 12. This phase of
<br />the project included a new force main between LS 12 and an existing metering station which conveys flows east along Sample Road to a
<br />termination point at the NRWWTP, and a rehabilitated force main from LS 12 to the connection from the Wynmoor Community, just west of the
<br />Florida Turnpike. Cost/Fees Paid: $88,000; Construction Cost: $3,000,000 (Estimated).
<br />
<br />
<br />c.
<br />(1) TITLE AND LOCATION (City and State)
<br />Stand-By Generators USCG Housing, Guaynabo, Puerto Rico
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2018
<br />CONSTRUCTION (If applicable)
<br />
<br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Project Design Manager for the new USCG Rio Bayamon Housing Stand-By Generators System. Construction Cost $3,000,000.
<br />
<br />d.
<br />(1) TITLE AND LOCATION (City and State)
<br />Reverse Osmosis Plant Modernization in the Nuclear Submarine USS West
<br />Virginia, Norfolk Virginia
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2014 CONSTRUCTION (If applicable)
<br />
<br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Project Design Manager for the reverse osmosis plant modernization in the nuclear submarine USS West Virginia ($4.4M).
<br />Project #: N00024-10-G-4304
<br />e.
<br />(1) TITLE AND LOCATION (City and State)
<br />Hangars Power Distribution, Clearwater, Florida
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2011 CONSTRUCTION (If applicable)
<br />2017
<br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Project Design Manager for the new USCG Air Station Clearwater Hangars. Construction Cost $2,500,000.
<br />
<br />STANDARD FORM 330 (REV. 8/2016) PAGE 2
<br />
<br />
<br />Section E - Page | 23
|