Laserfiche WebLink
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person) <br />12. NAME <br />CARMELO J. RAMOS, MS, PE <br /> 13. ROLE IN THIS CONTRACT <br />Civil, Electrical Engineer, Lighting; Pumps <br /> 14. YEARS EXPERIENCE <br /> a. TOTAL <br />12 <br /> b. WITH CURRENT FIRM <br />1 <br />15. FIRM NAME AND LOCATION (City and State) <br />R.J. BEHAR & COMPANY, INC. <br />6861 SW 196th Avenue, Suite 302 <br />Pembroke Pines, Florida 33332 <br />16. EDUCATION (Degree and Specialization) <br />M.S. Engineering Management, Polytechnic University of Puerto Rico 2012 <br />B.S. Electrical Engineering, Polytechnic University of Puerto Rico 2007 <br /> <br /> <br /> 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) <br /> Florida P.E. License No. 77953 <br /> <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />Mr. Ramos is a Senior Electrical Engineer with experience in planning, design, construction, alteration, maintenance, repairs and life <br />cycle support of building assets. He has experience with high voltage power distribution, electrical design for commercial, residential <br />and military facilities. At RJ Behar, he provides support with electrical and lighting design of sites and building facilities. He is proficient <br />in the software skills of IBM Maximo, AutoCAD, Solid Work, Microsoft Office, and multiple Project Management Programs. <br /> <br />19. RELEVANT PROJECTS <br /> <br />a. <br />(1) TITLE AND LOCATION (City and State) <br />Cypress Canal Weir #1 (GOLD4A Relocation Design, Collier County, Florida – <br />South Florida Water Management District (SFWMD) <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2019 CONSTRUCTION (If applicable) <br />Ongoing <br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm <br />Senior Electrical Engineer: The new project will include the construction of a new locally and remotely operated water control structure in the new <br />alignment of Cypress Canal, approximately 2,000’ east of the existing weir. Mr. Ramos is in charge of the electrical design for the control building, <br />gates, stilling wells, site, and site illumination. He is assisting with the FP&L coordination, electrical design, electrical elements of the cost estimates <br />and the specifications. Cost/Fees Paid: $378,925 Construction Cost: $3,000,000 <br /> <br />b. <br />(1) TITLE AND LOCATION (City and State) <br />Copans Road Wastewater Transmission System Design - City of Coconut Creek <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2019 <br />CONSTRUCTION (If applicable) <br />Ongoing <br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm <br />Senior Electrical Engineer. He was responsible for electrical design for the installation of a magnetic flow meter for Lift Station 12. This phase of <br />the project included a new force main between LS 12 and an existing metering station which conveys flows east along Sample Road to a <br />termination point at the NRWWTP, and a rehabilitated force main from LS 12 to the connection from the Wynmoor Community, just west of the <br />Florida Turnpike. Cost/Fees Paid: $88,000; Construction Cost: $3,000,000 (Estimated). <br /> <br /> <br />c. <br />(1) TITLE AND LOCATION (City and State) <br />Stand-By Generators USCG Housing, Guaynabo, Puerto Rico <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2018 <br />CONSTRUCTION (If applicable) <br /> <br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm <br />Project Design Manager for the new USCG Rio Bayamon Housing Stand-By Generators System. Construction Cost $3,000,000. <br /> <br />d. <br />(1) TITLE AND LOCATION (City and State) <br />Reverse Osmosis Plant Modernization in the Nuclear Submarine USS West <br />Virginia, Norfolk Virginia <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2014 CONSTRUCTION (If applicable) <br /> <br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm <br />Project Design Manager for the reverse osmosis plant modernization in the nuclear submarine USS West Virginia ($4.4M). <br />Project #: N00024-10-G-4304 <br />e. <br />(1) TITLE AND LOCATION (City and State) <br />Hangars Power Distribution, Clearwater, Florida <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2011 CONSTRUCTION (If applicable) <br />2017 <br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm <br />Project Design Manager for the new USCG Air Station Clearwater Hangars. Construction Cost $2,500,000. <br /> <br />STANDARD FORM 330 (REV. 8/2016) PAGE 2 <br /> <br /> <br />Section E - Page | 23