|
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person.)
<br /> 12. NAME
<br /> JASMANI RIVERON, MS, PE
<br />
<br /> 13. ROLE IN THIS CONTRACT
<br />Roadway, Streetscape, Sidewalks, Parking,
<br />Pavement Evaluation & Repairs, SP&M;
<br />Utilities
<br />
<br /> 14. YEARS EXPERIENCE
<br /> a. TOTAL
<br />11
<br />
<br /> b. WITH CURRENT FIRM
<br />10
<br />
<br />15. FIRM NAME AND LOCATION (City and State)
<br />R.J. BEHAR & COMPANY, INC.
<br />12788 Forest Hill Boulevard, Suite 2003B
<br />Village of Wellington, FL 33414
<br />16. EDUCATION (Degree and Specialization)
<br />M.S. Civil Engineering, FIU, Miami, Florida/2009
<br />B.S. Civil Engineering, FIU, Miami, Florida/2008
<br />
<br /> 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)
<br />P.E. Florida No. 73798/2011
<br />
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />Mr. Riveron has worked on a 10-story commercial office building, applying for gold LEED certification, oversaw the completion of the project
<br />within budget and without scheduling constraints and coordinated the activities of the construction team, architects, engineers and vendors. He
<br />has assisted in scheduling and obtaining bids for numerous construction projects, obtained permits and legal documents for various
<br />developments.
<br />His computer skills are: Proficient in AutoCAD, ArcMap and Microsoft Office and Some basic knowledge of ANSYS, ETABS and MathCad .
<br />19. RELEVANT PROJECTS
<br />
<br />a.
<br />(1) TITLE AND LOCATION (City and State)
<br />Haverhill Road from Caribbean Boulevard to SR-710 widening, Palm Beach
<br />County, Florida - Palm Beach County Department of Engineering & Public
<br />Works Division of Roadway Production (PBCDEPWDRP)
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />Ongoing
<br />CONSTRUCTION (If applicable)
<br />
<br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Project Engineer responsible for roadway design, permitting, signing and pavement markings, signal modifications, temporary traffic control
<br />plans (TTCP), and utility coordination. Project Number: 2013528 Project Length: 1.65 miles;
<br />Cost/Fees Paid: $582,734.24 - Construction Cost: $9,000,000 (Estimated)
<br />
<br />b.
<br />(1) TITLE AND LOCATION (City and State)
<br />Pompano Beach Mobility Sidewalks, Broward County, Florida – Florida
<br />Department of Transportation (FDOT), District 4
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2019
<br />CONSTRUCTION (If applicable)
<br />
<br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Project Manager responsible for preparing roadway, signing and marking plans, and specifications. The scope of this project consists of
<br />providing pedestrian sidewalk connectivity along 3 local roads within the City of Pompano Beach. The services include regrading grass swales
<br />and minor drainage modifications. Project Length: 046 Miles
<br />Project #: 437785-1-32-01; Cost/Fees Paid: $180,430.00; Construction Cost: $ 200,000 (Estimated).
<br />
<br />c.
<br />(1) TITLE AND LOCATION (City and State)
<br />Florida Mango Road over PBC L-2 Canal Palm Beach County, Florida –
<br />PBCDEPWDRP
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2019
<br />CONSTRUCTION (If applicable)
<br />
<br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Project Manager/Engineer of Record for replacement of the Florida Mango Bridge over the L -2 Canal. He was also responsible for the design of
<br />the utilities (Water and force main) affected by the bridge replacement.
<br />Project #: 22014.001; Cost/Fees Paid: $129,894.89; Construction Cost: $901,590.61 (Estimated)
<br />
<br />d.
<br />(1) TITLE AND LOCATION (City and State)
<br />Jog Road Slope Stabilization, Palm Beach County, Florida – PBCDEPWDRP
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2017
<br />CONSTRUCTION (If applicable)
<br />
<br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Project Engineer responsible for roadway design, permitting, utility coordination. Services include drainage analysis, structures, cost estimates
<br />and post design services. Project Length: 0.372 miles (LF 1,966.43); Project Number: 2014614 Cost/Fees Paid: $94,843.00;
<br />Construction Cost: TBD.
<br />
<br />e.
<br />(1) TITLE AND LOCATION (City and State)
<br />Reconstruction of SE 3rd Street, Belle Glade, Florida – FDOT, District 4
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2011
<br />CONSTRUCTION (If applicable)
<br />
<br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Project Engineer – He was responsible for the production of roadway plans, utility coordination, signing and pavement marking plans as well as
<br />quantities. The scope of this project included roadway plans, drainage design, signing and marking plans, lighting plans, and utility relocation
<br />plans. The design included the use of filter fabric and a thick sub-base in lieu of demucking the roadway. The project also included water and
<br />sewer plans to be constructed as part of the roadway improvements. Project Number: 426482-1-52-01 Project Start: 1/15/2010 Project
<br />Complete:07/2010 (Design); Cost/Fees Paid: $191,203.00 Construction Cost: $1,100,000; Project Length: 0.3 Miles.
<br /> STANDARD FORM 330 (REV. 8/2016) PAGE 2
<br />Section E - Page | 24
|