Laserfiche WebLink
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br /> 12. NAME <br /> JASMANI RIVERON, MS, PE <br /> <br /> 13. ROLE IN THIS CONTRACT <br />Roadway, Streetscape, Sidewalks, Parking, <br />Pavement Evaluation & Repairs, SP&M; <br />Utilities <br /> <br /> 14. YEARS EXPERIENCE <br /> a. TOTAL <br />11 <br /> <br /> b. WITH CURRENT FIRM <br />10 <br /> <br />15. FIRM NAME AND LOCATION (City and State) <br />R.J. BEHAR & COMPANY, INC. <br />12788 Forest Hill Boulevard, Suite 2003B <br />Village of Wellington, FL 33414 <br />16. EDUCATION (Degree and Specialization) <br />M.S. Civil Engineering, FIU, Miami, Florida/2009 <br />B.S. Civil Engineering, FIU, Miami, Florida/2008 <br /> <br /> 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) <br />P.E. Florida No. 73798/2011 <br /> <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />Mr. Riveron has worked on a 10-story commercial office building, applying for gold LEED certification, oversaw the completion of the project <br />within budget and without scheduling constraints and coordinated the activities of the construction team, architects, engineers and vendors. He <br />has assisted in scheduling and obtaining bids for numerous construction projects, obtained permits and legal documents for various <br />developments. <br />His computer skills are: Proficient in AutoCAD, ArcMap and Microsoft Office and Some basic knowledge of ANSYS, ETABS and MathCad . <br />19. RELEVANT PROJECTS <br /> <br />a. <br />(1) TITLE AND LOCATION (City and State) <br />Haverhill Road from Caribbean Boulevard to SR-710 widening, Palm Beach <br />County, Florida - Palm Beach County Department of Engineering & Public <br />Works Division of Roadway Production (PBCDEPWDRP) <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />Ongoing <br />CONSTRUCTION (If applicable) <br /> <br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm <br />Project Engineer responsible for roadway design, permitting, signing and pavement markings, signal modifications, temporary traffic control <br />plans (TTCP), and utility coordination. Project Number: 2013528 Project Length: 1.65 miles; <br />Cost/Fees Paid: $582,734.24 - Construction Cost: $9,000,000 (Estimated) <br /> <br />b. <br />(1) TITLE AND LOCATION (City and State) <br />Pompano Beach Mobility Sidewalks, Broward County, Florida – Florida <br />Department of Transportation (FDOT), District 4 <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2019 <br />CONSTRUCTION (If applicable) <br /> <br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm <br />Project Manager responsible for preparing roadway, signing and marking plans, and specifications. The scope of this project consists of <br />providing pedestrian sidewalk connectivity along 3 local roads within the City of Pompano Beach. The services include regrading grass swales <br />and minor drainage modifications. Project Length: 046 Miles <br />Project #: 437785-1-32-01; Cost/Fees Paid: $180,430.00; Construction Cost: $ 200,000 (Estimated). <br /> <br />c. <br />(1) TITLE AND LOCATION (City and State) <br />Florida Mango Road over PBC L-2 Canal Palm Beach County, Florida – <br />PBCDEPWDRP <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2019 <br />CONSTRUCTION (If applicable) <br /> <br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm <br />Project Manager/Engineer of Record for replacement of the Florida Mango Bridge over the L -2 Canal. He was also responsible for the design of <br />the utilities (Water and force main) affected by the bridge replacement. <br />Project #: 22014.001; Cost/Fees Paid: $129,894.89; Construction Cost: $901,590.61 (Estimated) <br /> <br />d. <br />(1) TITLE AND LOCATION (City and State) <br />Jog Road Slope Stabilization, Palm Beach County, Florida – PBCDEPWDRP <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2017 <br />CONSTRUCTION (If applicable) <br /> <br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm <br />Project Engineer responsible for roadway design, permitting, utility coordination. Services include drainage analysis, structures, cost estimates <br />and post design services. Project Length: 0.372 miles (LF 1,966.43); Project Number: 2014614 Cost/Fees Paid: $94,843.00; <br />Construction Cost: TBD. <br /> <br />e. <br />(1) TITLE AND LOCATION (City and State) <br />Reconstruction of SE 3rd Street, Belle Glade, Florida – FDOT, District 4 <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2011 <br />CONSTRUCTION (If applicable) <br /> <br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm <br />Project Engineer – He was responsible for the production of roadway plans, utility coordination, signing and pavement marking plans as well as <br />quantities. The scope of this project included roadway plans, drainage design, signing and marking plans, lighting plans, and utility relocation <br />plans. The design included the use of filter fabric and a thick sub-base in lieu of demucking the roadway. The project also included water and <br />sewer plans to be constructed as part of the roadway improvements. Project Number: 426482-1-52-01 Project Start: 1/15/2010 Project <br />Complete:07/2010 (Design); Cost/Fees Paid: $191,203.00 Construction Cost: $1,100,000; Project Length: 0.3 Miles. <br /> STANDARD FORM 330 (REV. 8/2016) PAGE 2 <br />Section E - Page | 24